Centralized solution

Xem 1-20 trên 86 kết quả Centralized solution
  • Research and clarify theoretical issues related to the rational exploitation TWCHs. Systematize argument structure about TWCHs, determine the characteristics of TWCHs, provide a theoretical basis for rational exploitation TWCHs to develop tourism. Identification of criteria and indicators for assessment of the rational exploitation TWCHs. Analysis and reviewing of tourism development in Central Area, tourism exploitation of TWCHs and logical reviewing of current exploitation TWCHs. Proposal direction and solutions logicalfor TWCHs to develop tourism for Central Area in the future.

    doc27p change05 14-06-2016 10 1   Download

  • On the basis of clarifying the general theoretical issues about market risk, methods of identifying, measuring and controlling market risk, the system of market risk management softwares at commercial banks; analyzing and evaluating the status quo of the market risk management in Vietnam Joint Stock Commercial Bank for Industry and Trade; the thesis proposed solutions to improving market risk management ability at Vietnam Joint Stock Commercial Bank for Industry and Trade in accordance with international practices.

    pdf14p change05 14-06-2016 2 1   Download

  • The systems house of Scheidt & Bachmann has more than 30 years of experience in designing and delivering parking installations. Important standards have been set during this time period with more than 5,000 installations worldwide. At the same time the field of access and revenue control systems for leisure centres has also successfully advanced. In 1970 Scheidt & Bachmann launched the technology of the central stripe magnetic ticket onto the market. At that time this represented a new concept and soon advanced to an international standard for car park systems. ...

    pdf24p horizion97 13-04-2011 99 42   Download

  • This Report aims to improve the lives of people living in Da Nang, through developing the tourist sector and improving its links to the poor. The Report describes an innovat ive approach to tourist development – a participatory pro-poor value chain analysis - that was supported by local stakeholders and funded by the Vietnam Private Sector Support Programme. Thi s is probably the first truly participatory tourism value chain exerci se ever conducted.

    pdf72p lqtien 20-08-2011 113 40   Download

  • ADC’s OmniReach™ FTTX Solutions are the industry’s first infrastructure solutions designed from the ground up to meet the unique requirements of FTTX networks. Designed for operational efficiency and scalability, OmniReach solutions simplify FTTX network installation, maintenance and management from the central office/headend to the outside plant.

    pdf12p mylinh 13-08-2009 106 15   Download

  • ADC’s OmniReach™ FTTX Solutions are the industry’s first infrastructure solutions designed from the ground up to meet the unique requirements of FTTX networks. Designed for operational efficiency and scalability, ADC’s OmniReach solutions simplify FTTX network installation, maintenance, and management from the central office/headend to the outside plant. Installed in an outside plant enclosure, passive optical splitter modules give carriers the ability to split optical signals to multiple homes or businesses....

    pdf19p halanh 14-08-2009 106 15   Download

  • In early October 2010, two severe floods in a row (from 1st to 6th Oct and from October 14 to 18) occurred in five central provinces, including Nghe An, Ha Tinh, Quang Binh, Quang Tri and Thua Thien Hue. Ha Tinh is where The most serious damage, including Huong Khe and Vu Quang, poor districts of Ha Tinh province, very serious damage. Flooding to people, was poor become poorer and very much influenced their lives, the daily activities and production.

    doc56p duahau123456 12-08-2011 46 12   Download

  • A prerequisite for using the facilities offered by the Bundesbank for cashless payments is a current account with the Bundesbank. 1 The Bundesbank manages current accounts for banks and public authorities and, in exceptional cases - with a limited range of services - also for companies and private individuals. Apart from the minimum reserve balances, current accounts with the Deutsche Bundesbank do not bear interest and are run on a credit basis only. In accordance with the cover principle laid down in the BBankG, payment orders are only executed if sufficient cover is available.

    pdf45p enterroi 02-02-2013 27 10   Download

  • ADC’s central office cables deliver the data bandwidth to eliminate throughput bottlenecks or downtime and improve customer satisfaction. The increased throughput potential translates to increased customer satisfaction. ADC combines innovative design and application engineering to deliver a cabling solution that exceeds your network’s physical layer requirements.

    pdf60p maiphuong 13-08-2009 55 7   Download

  • The ADC Outdoor Fiber Distribution Terminal 48F (oFDT-48) is designed to terminate, splice and interconnect fiber optic cables in an outdoor environment. This terminal may be adapted to Fiber-to-The-Premise (FTTP) Multiple Dwelling Unit (MDU) applications by mounting the enclosure to the exterior surface of a dwelling and connecting between the distribution cable and drops routed to individual living units. The oFDT-48 is typically divided into two side-by-side sections with distribution cable routed into one side and drop cable routed into the other side.

    pdf4p halanh 14-08-2009 68 7   Download

  • Amines are extremely important intermediates and end products of the chemical industry and are often obtained by hydrogenation of the corresponding nitro compounds or imines. A search of the literature reveals, that hydrogenation of nitro compounds catalyzed by well-defined molecular complexes in aqueous solutions is rare.

    pdf51p ruavanguom 25-09-2012 33 6   Download

  • THE CYTOKININS WERE DISCOVERED in the search for factors that stimulate plant cells to divide (i.e., undergo cytokinesis). Since their discovery, cytokinins have been shown to have effects on many other physiological and developmental processes, including leaf senescence, nutrient mobilization, apical dominance, the formation and activity of shoot apical meristems, floral development, the breaking of bud dormancy, and seed germination.

    pdf26p anhphuonggl 11-04-2013 34 6   Download

  • Purposes of study: On the basis of the theory and practical survey, the Thesis has suggested some solutions to the development of human resources in Tourism so as to meet the requirements on tourism development till 2020 of the provinces in the South Central Coast and Highlands.

    doc27p fujijudo87 07-07-2014 18 6   Download

  • ADC’s OmniReach™ FTTX Solutions are the industry’s first infrastructure solutions designed from the ground up to meet the unique requirements of FTTX networks. Designed for operational efficiency and scalability, OmniReach solutions simplify FTTX network installation, maintenance and management from the central office/headend to the outside plant.

    pdf2p mylinh 13-08-2009 74 5   Download

  • The process of implementing multi-sector economic policies and the movement towards forestry strategy, from State’s forestry management to people’s forestry management appear a lot of new factors, especially diversification of forest resource management approaches - Community participated in in forest management is one the forest management forms attracted the interest in the central and local levels. In terms of Vietnam history, community forest has long existed in the communities based forest.

    pdf12p xau_la 09-02-2012 24 5   Download

  • The ribbon itself forms an abstract letter ‘W’ (for World) that changes colour from pink through blue into a green that represents a green economy. The person’s position in the ribbon is where the colour incidentally transitions into green, signifying that people – you – are central to a functional green economy and thus it must include you. The light green part of the ribbon curves into a slight horizon of the earth.

    pdf68p yeutinh98 26-09-2012 33 5   Download

  • An organic farm plan is central to the certification process. The farm plan describes production, handling, and record-keeping systems, and demonstrates to certifiers an understanding of organic practices for a specific crop. The process of developing the plan can be valuable in terms of anticipating potential issues and challenges, and fosters thinking of the farm as a whole system. Soil, nutrient, pest, and weed management are all interrelated on organic farms and must be managed in concert to be successful.

    pdf24p loginnhanh 25-04-2013 29 5   Download

  • In today’s and tomorrow’s fiber-to-the-premises (FTTP) architectures, the best solution for offering multiple services to subscribers will be the one that is the most cost effective, flexible, and scalable. With its 65-year history of innovative solutions for managing the physical cable plant, ADC is bringing all its experience to bear in the outside plant (OSP) and fiber-to-the-premises (FTTP) markets. Driven by the customer’s need for overall affordability and operational flexibility, ADC is designing and building the first true FTTP solution – from the ground up....

    pdf4p mylinh 13-08-2009 56 4   Download

  • ADC’s OmniReach™ FTTX Solutions are the industry’s first infrastructure solutions designed from the ground up to meet the unique requirements of FTTX networks. Designed for operational efficiency and scalability, ADC’s OmniReach solutions simplify network installation, maintenance and management from the central office to the outside plant. The OmniReach™ Non-Metallic Fiber Access Terminal provides a robust, user friendly and cost-effective platform for delivering fiber optic service drops in FTTX deployment....

    pdf4p halanh 14-08-2009 50 4   Download

  • The eight-termination MiniDSX-1 is especially designed for small central or remote offices and customer premises demarcation points. These panels can be used for monitoring, terminating, accessing, and reconfiguring DS1 (1.544 Mbps) and DS1C (3.152 Mbps) circuits. The front cross-connect panel provides jack access and cross-connections on the front and IN/OUT equipment terminations on the rear of the panel. The rear cross-connect panel has jacks on the front with the cross-connect and IN/OUT equipment terminations on the back of the panel.

    pdf32p mylinh 14-08-2009 88 4   Download

Đồng bộ tài khoản