Scheduling controller

Xem 1-20 trên 90 kết quả Scheduling controller
  • The NASA Mars Sojourner rover inspired this project . I followed the mission with great enthusiasm and witnessed a giant leap in robotics that day it began roaming the Martian terrain and sending images back to earth. Though I was in awe when the Viking missions of the 1970’s were in progress, we didn’t see that near real-time interaction with the craft .

    pdf256p somehow 23-08-2010 162 103   Download

  • The main contents of this chapter include all of the following: Work center defined, typical scheduling and control functions, job-shop scheduling, examples of scheduling rules, shop-floor control, principles of work center scheduling, issues in scheduling service personnel.

    ppt25p tangtuy11 20-05-2016 8 2   Download

  • Principles of Database Management Systems - Notes 7: Concurrency Control products Concurrency Control, Correctness depends on scheduling of transactions, Returning to Sc, Precedence graph P(S), Schedule F (with simple locking).

    pdf70p maiyeumaiyeu18 01-11-2016 6 1   Download

  • Chapter 5 - Master production scheduling. An effective Master Production Schedule (MPS) provides the basis for making good use of manufacturing resources, making customer delivery promises, resolving trade-offs between sales and manufacturing, and attaining the firm’s strategic objectives, as reflected in the Sales and Operations Plan.

    ppt27p nomoney2 10-02-2017 1 1   Download

  • Chapter 6 - Material requirements planning. Material Requirements Planning (MRP) has the managerial objective of providing “the right part at the right time” to meet the schedules for completed products. MRP provides a formal plan for each part number–raw materials, components, and finished products.

    ppt30p nomoney2 10-02-2017 1 1   Download

  • This chapter presents the following content: What is Capacity planning? role of capacity planning in master planning and control, capacity planning and control techniques, simultaneous scheduling of capacity and materials, capacity management.

    ppt33p nomoney2 10-02-2017 3 1   Download

  • This chapter presents the following content: Production activity control - an overview, manufacturing planning and control linkages, production activity control techniques, theory of constraints, vendor scheduling, principles.

    ppt27p nomoney2 10-02-2017 2 1   Download

  • In this chapter, the learning objectives are: Detailed scheduling of individual jobs through work centers in a shop has been the focus of numerous researchers. Focusing on some basic concepts and results and relating them to some newer manufacturing approaches can show how to apply results in different operating situations.

    ppt17p nomoney2 10-02-2017 3 1   Download

  • This chapter presents the following content: Supply chain logistics scope, supply chain logistics framework, supply chain logistics elements, warehouse replenishment systems, warehouse location analysis, vehicle scheduling analysis, customer service management.

    ppt21p nomoney2 10-02-2017 3 1   Download

  • After you have mastered the material in this chapter, you will be able to: Describe the budgeting process and the benefits it provides, prepare a sales budget and related schedule of cash receipts, prepare an inventory purchases budget and related schedule of cash payments.

    ppt16p nomoney13 04-05-2017 0 0   Download

  • This paper focuses on a SCESS in terms of modeling and control designing aim to manage active power flow between the grid and the SCESS. A predictive control algorithm for discrete-time bilinear state-space model of a non-isolated bidirectional DC-DC converter is proposed. This algorithm is supplementary methods for this converter besides linear or hysteresis control methods in other research. Simulations validate the effectiveness of the proposed control.

    pdf10p dieutringuyen 07-06-2017 0 0   Download

  • The goal of the SaaS provider is the most profitable; the user’s goal is to meet requirements as quickly as possible but still within budget and deadline. In this paper, a heuristic ACO (Ant Colony Optimization) is used to propose an algorithm to admission control, then building a scheduling algorithm based on the overlapping time between requests.

    pdf13p dieutringuyen 07-06-2017 2 0   Download

  • In real-time applications, the timing requirements a re the main c onstraints a nd their mastering is the predominant factor for a ssessing the quality of service. Timing con-straints span many application a reas, suc h a s industrial plant automation, embedded systems, vehicle control, nuclear plant monitoring, scientific e xperiment guidance, robotics, multimedia audio a nd video str eam conditioning, surgical operation moni-toring, and stock exchange orders follow-up.

    pdf243p iamvip01 04-05-2012 63 19   Download

  • The Energy Efficiency Manual is your primary tool for improving energy efficiency and reducing your utility costs. It is a comprehensive, step-by-step guide that is designed to help you manage your activities effectively and with confidence. The core of the Energy Efficiency Manual is 400 energy efficiency “Measures.” The Measures have a standard format that makes it easy to organize them into an optimum efficiency program for your facility. Refer to the inside of the front cover to learn how to exploit the Measures....

    pdf1437p coeus75 29-01-2013 46 15   Download

  • Parametric representation of shapes, mechanical components modeling with 3D visualization techniques using object oriented programming, the well known golden ratio application on vertical and horizontal displacement investigations of the ground surface, spatial modeling and simulating of dynamic continuous fluid flow process, simulation model for waste-water treatment, an interaction of tilt and illumination conditions at flight simulation and errors in taxiing performance, plant layout optimal plot plan, atmospheric modeling for weather prediction, a stochastic search method that explores ...

    pdf312p kimngan_1 05-11-2012 38 12   Download

  • . .Real-Time Systems Series Series Editor John A. Stankovic University of Virginia, Virginia, USA For further volumes: http://www.springer.com/series/6941 .Giorgio C. Buttazzo Hard Real-Time Computing Systems Predictable Scheduling Algorithms and Applications Third Edition .Giorgio C. Buttazzo RETIS Lab Scuola Superiore Sant’Anna Pisa Italy g.buttazzo@sssup.it ISSN 1867-321X e-ISSN 1867-3228 e-ISBN 978-1-4614-0676-1 ISBN 978-1-4614-0675-4 DOI 10.

    pdf528p drhoanh 25-05-2013 33 12   Download

  • This book is a collection of 19 excellent works presenting different applications of several MATLAB tools that can be used for educational, scientific and engineering purposes. Chapters include tips and tricks for programming and developing Graphical User Interfaces (GUIs), power system analysis, control systems design, system modelling and simulations, parallel processing, optimization, signal and image processing, finite different solutions, geosciences and portfolio insurance. Thus, readers from a range of professional fields will benefit from its content....

    pdf0p cucdai_1 22-10-2012 37 11   Download

  • Monitor almost anything in a network. Control notifications in your network by configuring Nagios Core. Get a handle on best practices and time-saving configuration methods for a leaner configuration. Use the web interface to control notification behaviour on the fly and for scheduled outages, without restarts

    pdf366p titatu_123 09-03-2013 36 11   Download

  • This kit introduces the various tools for administering and configuring Windows 2000 including the Microsoft Management Console, Task Scheduler, Control Panel, and the registry. You will learn about the network protocols and services that ship with Windows 2000. This kit concentrates on Transmission Control Protocol/Internet Protocol (TCP/IP), the network protocol of choice for Windows 2000.

    pdf590p maiphuong 11-08-2009 66 8   Download

  • panel manufacturing facility caters for panels ranging from Form 1 to Form 4 including panels for use in hazardous areas. The panels are built from approved electrical panel design drawings, which detail all components in a parts list, cable schedules and sizes, terminal numbers, etc. All the drawings are produced using AutoCAD and are capable of being emailed in PDF or original format. A dimensional drawing of the internal and external panel enclosure with any display or identification labels, lights, etc., will be fully detailed....

    pdf7p vn0084 16-05-2011 65 8   Download

CHỦ ĐỀ BẠN MUỐN TÌM

Đồng bộ tài khoản