Application of goal programming model for allocating time and cost in project management: A case study from the company of construction seror

Chia sẻ: Tuong Vi | Ngày: | Loại File: PDF | Số trang:7

0
6
lượt xem
0
download

Application of goal programming model for allocating time and cost in project management: A case study from the company of construction seror

Mô tả tài liệu
  Download Vui lòng tải xuống để xem tài liệu đầy đủ

The objective of this paper is to apply one of the techniques of multipleobjective programming (goal programming) to a project management problem. Mubiru proposed a goal programming model for allocating time and cost in project management. In order to test this model, a case study was accomplished in the company of construction, SEROR, Algeria.

Chủ đề:
Lưu

Nội dung Text: Application of goal programming model for allocating time and cost in project management: A case study from the company of construction seror

CÓ THỂ BẠN MUỐN DOWNLOAD

Đồng bộ tài khoản