MINISTRY OF EDUCATION
MINISTRY OF EDUCATION AND TRAINING
LAO NATIONALUNIVERSITY
NATIONAL ECONOMICS UNIVERSITY
Khammany INTHIRATH Khammany INTHIRATH Khammany INTHIRATH Khammany INTHIRATH
EFFECTIVE AID COORDINATION IN LAO PDR:
POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT
Specialty : Investment Economics (Development Economics)
Code : 62.31.05.01 Supervisor: Assoc.Prof.Dr. Nguyen Thanh Ha
A dissertation submitted to the National Economics University in
fulfillment of requirements for the Degree of
Doctor of Philosophy in Economics
Vientiane, 2013
ii
DECLARATION I hereby declare that this dissertation is my own work and effort. The dissertation has not been submitted anywhere for any award. All the sources of information used
have been well acknowledged.
Date:
Signature:
Khammany INTHIRATH
iii
ACKNOWLEDGMENT
I would like to sincerely thank many people whom provided much support into
producing this thesis and paving the way for the research topic to be one of the
significant findings. I wish to express my profound gratitude to my supervisor
Associate Professor Dr. NGUYEN Thanh Ha, National Economics University
(Vietnam), for his great support and guidance throughout my study. His
encouragement and constant attention contributed significantly to the outcome of
this research.
I am grateful to my sponsors such as the Ministry of Energy and Mining and
the National University of Laos in enabling me to achieve a higher education at
National Economics University, Vietnam.
Many thanks to all interviewees whom shared knowledge and ideas. My
sincere thanks out to the Lao Government officers from the Government Office,
Ministry of Energy and Mines, H.E Mr. Soulivong DARAVONG, Minister of
Energy and Mines, etc and many other officers whom were involved in my research.
The European Commission Lao PDR Office international staff, the World Bank
residential office and United Nations Development Programme staff who are
involved in the aid effectiveness agenda in Laos and friends from development
communities were all of assistance in this reseach.
Last but not least, many thanks are due to my wife and my family who
provided me endless love with support and strength through out of my life.
iv
TABLE OF CONTENTS
DECLARATION...................................................................................................... ii
ACKNOWLEDGMENT......................................................................................... iii
TABLE OF CONTENTS........................................................................................ iv
ABBREVIATION ................................................................................................... vi
ABSTRACT .................................................................Error! Bookmark not defined.
RATIONALE........................................................................................................... xi
CHAPTER 1. LITERATURE REVIEW ................................................................1
CHAPTER 2. THEORETICAL FRAMEWORK ON ODA COORDINATION EFFECTIVENESS ....................................................................................................6
2.1. Development Theory..........................................................................................6
2.2. Development Aid ................................................................................................7
2.2.1. Donor Motives ..................................................................................................7
2.2.2. Defining Official Development Assistance (ODA) ..........................................9
2.3. Aid coordination and its effectiveness ............................................................10
2.4. Dimensions of Development Assistance Coordination .................................13
2.5. Sector Wide Approach and Programme Based Approach ..........................14
2.6. Principles of Effective Aid Coordination .......................................................15
CHAPTER 3. KEY LESSONS LEARNT FOR LAO PDR ................................16
3.1. Lesson from Vietnam ......................................................................................16
3.2. Lesson from Timor L’Este..............................................................................20
3.3. Comparative Lessons.......................................................................................23
CHAPTER 4. HOW ODA COORDINATION IMPLEMENTED IN LAO......26
4.1. Millennium Development Goals (MDGs)......................................................26
4.2. Paris Declaration..............................................................................................28
4.3. Vientiane Declaration and Country Action Plan (CAP) .............................28
4.4. The Round Table Meeting/Process (RTM/RTP)..........................................30
v
4.5. Sector Working Groups (SWGs) ...................................................................31
4.6. Critiques............................................................................................................34
4.7. Current ODA in Lao P.D.R. ...........................................................................39
4.8. Effort of Government of Lao PDR.................................................................44
4.9. Coordination in Practice .................................................................................45
4.10. Sectorial Working Groups (SWGs) .............................................................46
4.11. Evolution of Current Coordination System................................................47
4.12. OECD DAC Survey .......................................................................................49
4.13. International Development Agencies...........................................................51
CHAPTER 5. POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT ...................................................................................................55
5.3. Power Sector Policy..........................................................................................74
5.4. Power Sector Strategy towards 2025..............................................................74
5.5. Recommendations ............................................................................................78
5.6. Regional Coordination Effort.........................................................................80
CONCLUSION........................................................................................................82
REFERENCES ........................................................................................................84
vi
ABBREVIATION
Asian Development Bank
ADB
Avian Influenza
AI
Acquired Immune Deficiency Syndrome
AIDS
Action Plan
AP
Country Action Plan
CAP
Country Analytic Work
CAW
Capacity Development Framework
CDF
Committee for Planning and Investment
CPI
Development Assistance Committee
DAC
Department of International Cooperation (MoFA)
DIC
Development Partner
DP
Daily Subsistence Allowance
DSA
European Commission
EC
Food and Agriculture Organization
FAO
Fiscal Year
FY
Framework
FW
Government of Lao PDR
GoL
Hanoi Core Statement
HCS
Human Immunodeficiency Virus
HIV
INTOSAI
International Organization of Supreme Audit Institution
Lao NCAW
Lao National Commission for the Advancement ofWomen
LWU
Lao Women’s Union
MAF
Ministry of Agriculture and Forestry
vii
MCTPC
Ministry of Construction, Transport, Post and Communications
Millennium Development Goals
MDG
Ministry of Education
MoE
Ministry of Finance
MoF
MoFA
Ministry of Foreign Affairs
Ministry of Health
MoH
Memorandum of Understanding
MoU
Medium Term Expenditure Framework
MTEF
Non-Government Organization
NGO
NSEDP
National Socio-Economic Development Plan
Official Development Assistance
ODA
Organization for Economic Cooperation and Development
OECD
PACSA
Public Administration and Civil Service Authority
PBA
Program Based Approach
PEMSP
Public Expenditure Management Strengthening Program
Public Financial Management
PFM
Partnership Group on Aid Effectiveness
PGAE
Public Investment Program
PIP
Project Implementation Unit
PIU
Project Management Unit
PMU
Procurement Monitoring Office
PrMO
Round Table Information/Implementation Meeting
RTIM
Round Table Meeting
RTM
Swedish International Development Agency
SIDA
viii
Science, Technology and Environment Association
STEA
Sector Working Group
SWG
Technical Cooperation
TC
Treasury Single Account
TSA
United Nations Country Team
UNCT
United Nations Development Program
UNDP
UNFPA
United National Population Fund
Unexploded Ordinance
UXO
Vientiane Declaration (on Aid Effectiveness)
VD
World Bank
WB
WHO
World Health Organization
ix
ABSTRACT
Lao PDR has a lengthy history, abundant and natural-resource-rich country
with plenty of minerals, rivers and creeks which are seen to be hidden strengths for
the development of power, particularly hydropower, thermal, wind power, and solar
energy.
Total energy demand of the Lao People's Democratic Republic was 2.4
million tons of oil equivalent (Mtoe) in 2010, with an annual increment of 3 to 4% in
parallel.with stable economic growth. Therefore, it is estimated that total energy
demand in 2025 will be 6.4 million tons, approximately 2.6 times current demand. In
terms of sector-wise demand, the industrial sector accounts for about 31%, the
transportation sector for about 29%, the residential sector for about 29%, the
commercial sector for about 10%, and the agricultural sector for about 1%. Among
these, the industrial sector and the transportation sector, in particular, show higher
annual increases of l5% and 8%, respectively. These are sectors where remarkable
growth of demand is expected.
Currently, the major energy supply sources are firewood/charcoal (about
47%), petroleum (about l9%), and hydropower (about 19%). However, in view of a
sharp rise in energy consumption in the transportation and the industrial sectors, it is
thought that the petroleum contribution of overall energy sources will be about 60%
in 2025. In addition, the share of electricity is expected to grow substantially as the
electrification rate increases from the current level of abofi 70% to 90% in 2020, and
electricity consumption will increase sharply due to increasing use of home
appliances.
The Government of Lao PDR is expected to establish institutions to secure
energy efficiently by making reliable energy demand forecasts and formulating an
appropriate energy policy and supply pian.
The purpose of this research is to find what is “effective aid coordination”
particularly drawing from the case study of Lao PDR and lessons from successful cases
x
and what possible recommendations for power sector development are. The study
explore extensive literature in aid effectiveness, with an in-depth interview with the
managers, leaders, practitioners etc. Information synthesis is used in to analyze the
data. It is proposed that a solution to the problem of poor delivery of ODA is that the
Lao PDR governement, in general and power sector, in particular must improve its
ODA spending systems and incorporate aid budgets into the national budget and
development plans. It is vital to encourage the Government of Lao PDR to lead their
own development agenda and support development according to local priorities.
The results suggest that it is not just a matter of coordinating aid effectively,
but the aid industry needs the right capacity and people to be involved. Capacity
building is much needed within the recipient national offices as well as many of the
international donor agencies. This would allow the local government to take the
lead and prioritize the commitments signed in the Paris Declaration, the Vientiane
Declaration and the Millennium Development Goals.
It is recommended by many practitioners that the number of agencies working
in decision making processes in the aid effectiveness agenda in Lao PDR should be
limited to reduce transaction costs and promote clear communication within the
development community. However different environments such as Timor L’Este,
suggests that civil society should be involved more and that donor agencies should
not take the lead in aid delivery.
The key point to be learnt is that ODA needs to enhance its efficiency through
the best use of limited resources, aligning with national planning, programming,
monitoring and reporting processes, strategic documents, and priorities. There
should be flexibility to establish and abolish donor coordination groups, avoiding
administrative overburden of public administration staff, while attempting to comply
with donor requirements, established systems and procedures for programming of
donor’s funds. The effective use of existing national planning, monitoring
structures, equipped with national leadership and ownership in aid coordination
should be taken into account.
xi
RATIONALE
As a country condition of mountainously and rich of water resources, Lao
PDR is having 23,000 MW exploitable hydro power potential. With a quick
development of economic and government policy on attraction of the foreign
investment, those hydropower potential has been step to step developed for both
domestic consumption and export for country income generation. Continue of
economic growth is needed to alleviate poverty and achieve social development
goals but the policy options for achieving this are constrained by the small domestic
economy and limited trade opportunities. Therefore, hydropower projects are a
development opportunity for both local and central of Lao PDR in overall
development. The power policy of Lao government aim to establish a priority policy
of developing the country’s potential energy resources to provide a low cost source
of energy that can meet export and domestic policy objectives and promotion of
sustainable development.
The country now has installed power generation capacity of over 3,000 MW,
of more than 13 hydro power projects or about 6,000 MW are under construction
and more than 6,000 MW are under various stages of development by 2025, it is
expected that export would be 80-85% of developed capacities. To transmit of those
power there are a strategy of domestic and international grid development where it
can be divided into domestic interconnection (connection of Northern to Southern
part of Lao PDR) and regional interconnection (connection of Lao PDR to
neighboring countries for power exporting). The Memorandum Of Understanding
(MOU) was signed for supply of power between Lao and Thailand are 7,000 MW
and 5,000 MW between Lao and Vietnam by 2020.
For Lao PDR, Official Development Assistance (ODA) is very important
mechanism to promote the potential of investment fund, technology, marketing,
management experiences, take part of job creation, increase of income level,
upgrade of country development level. Therefore, promotion and attraction of ODA
xii
and FDI is become one of priority policy of party and government of Lao PDR.
Promotion of the ODA into Lao for development of important sectors; potential
sectors are essential necessary for current situation, especially for development of
energy sectors because this sector is an major part of country socio-economic
development; it is a necessary of living condition of the people, generate income
from export of surplus power from domestic use to neighboring country, creation for
income from job opportunity for workers. Together with those, it is also a factor
contribute to promote other sector development as well.
Currently in the world, there are many type of energy; for Law PDR, with
geographic condition, we are having of river which is potential of hydropower
development. According to survey, Lao PDR is potentially of 23,000 MW of energy
can be developed, in there; 13,000 MW could be generate from development of
potential from Mekong river tributary and another 8,000 MW are from Mekong river
tributary and 2,000 MW is from the other type of energy potential. At the moment,
Lao is having 14 officially hydropower plants with generating of 2,558 MW, in their
Electricite Du Laos (EDL) is direct managed of 9 hydropower plants with 385 MW
installed capacity and there could generate of 1,700-1,800 million KWh. Now; every
provincial city; district are already electrified and more than 72% of households are
also electrified. EDL is also supply power to irrigation project for more than 24,000
projects which is further supply of water to production area of 200,000 hector and
supply of power to heavy and light industries of more than 30,000 Unit. In the past
five years, revenue of EDL business operation could reached 1,600-1,800 Billion
Kip; where increased 20-36%. From 1988-2007 Foreign Investment is approved of
1,800 projects with total fund of 9.2 Billion US Dollars, particularly in year 2006 is
a year that development of hydropower is highest with 13 projects and 1.7 Billion
US Dollars fund. In the past 20 years from 1988 to present implementation of
foreign investment policy in Lao PDR were approved from more than 9.2 Billion US
Dollars and in there total investment of energy sector are 4 Billion US Dollars
covered very high proportion compare to the other investment sectors. From 2007-
xiii
2010 EDL are working with other foreign business investment partners of 5 projects
with total capital investment cost of 1.8 Billion US Dollars.
However, for promotion of the ODA are still having several limitation for
example: understanding of the ODA is still different, recent year Lao PRD is
announced for use of the Investment Promotion Law and many other legal
documents concerning ODA and how to use such aid effectively. In the same time
management, selection, approval and opening of the investment form, investment
form of the government into different sectors in particular for the join investment of
the government into energy sector is not yet having a proper package system, thus
this make a difficult to prepare a policy, policy and detail implementation, this
become a limitation of the research on ODA, therefore it make an investment
environment is complicated, legal system, policy is not yet in a one full set system.
There are many policies concern with ODA are regularly adjusted, not clear and thus
this impact to business operation. Further to that policy system on the ODA, foreign
direct investment, etc. between government, ministries and local authority is still not
harmonized and break through, This make difficulty to donors and investors. Those
limitations are making investment climate and environment are liquidity.
Official Development Assistance (ODA) has a long history, yet its
effectiveness and efficiency has always been a concern of both the donor and the
recipients. In order to enhance the efficiency and effectiveness of ODA, the Paris
Declaration has been identified as the key development frame work in leading the
aid effectiveness agenda. It is a contract between members from various developed
and developing countries in an effort to reduce poverty. This dissertation draws
attention on the aid effectiveness agenda and the search for better ways to use such
aid most effectively.
Effective Aid Coordination, as the topic suggests, is all about how to bring
development communities together as one and propose that poverty reduction work
should be incorporated into one master plan. When development institutions work
independently, projects are duplicated and already limited resources are wasted.
With aid coordination, the local government can monitor and outline the priorities
xiv
needed for Lao PDR and allow interested parties to contribute to the government
plan. However the aid coordination system in Laos is not working well at present.
Examples from case studies drawn from Vietnam and Timor L’Este may provide
some useful lessons.
The author has been working in the energy sector for a long time. Through
out the working live, from being a provincial staff on electricity supply
management, to being the Director of Electricity Du Laos State Enterprises, and
currently the Deputy Minister of the Ministry of Energy and Mines, I have seen
and dealt with several aid programs through out the country. The author also has
an extensive network in the ODA administrators and the receipient organizations.
Therefore, the inspiration for this topic was driven by personal experiences. During
my work life, I was overwhelm by the enormous amount of ODA in flows in to Laos.
Observing the aid industry I can see the benefits that aid does for the local people, at
both the central government and provincial government levels, as well as for
expatriates working in development agencies, donors, NGOs and particularly the poor
whom ideally are beneficiaries, which is the prettier side of aid.
The down side of aid is “the operation of aid.” Within the UN agencies
themselves, aid money is not entirely spent for its best use. There are duplications of
projects within the UN system, as well as the entire aid industry. Some projects
adversely affected the beneficiaries more than benefited them. The capacity of
development experts locally and internationally are not always competent to deliver.
The local government is often puzzled but takes aid with open arms.
Since the Millennium Development Goals (MDGs) were set for the year
2015, Laos has signed up to commit to meeting the deadline. There is however, very
little optimism regarding meeting the commitment to aid coordination in Laos. If
only aid could be coordinated and allocated correctly the output of aid could yield
favorable outcome.
Research Aims and Objectives
The aim of this dissertation is to investigate a working model of aid
coordination for Lao PDR with a focus of the country’s ODA status. This will
provide a better understanding of how the aid environment system operates within
xv
the country. In addition to Lao PDR, lessons from Timor L’Este and Vietnam will
be discussed to briefly outline what these countries are doing with regards to
harmonizing ODA and what best practices could be suggested for Lao PDR. It is
assumed that coordination is the key approach for aid effectiveness. The
dissertation objectives are:
1. To evaluate the current working model for aid coordination efforts in Lao
PDR. With this model it can be analyzed whether the current existing approach is
effective or not.
2. To find alternatives for aid coordination for Lao PDR for improvement.
3. To recommend possible policies and solutions to promote effective use
of external aid in the field of power sector development.
Research Questions
1. What is the aid effectiveness agenda in Lao PDR? Which institutions are
involved?
2. What are the local efforts from international agencies and donor
communities for aid effectiveness efforts in Laos?
3. Does the local development community support the local government in
aid coordination?
4. What lessons Lao PDR could learn from successful cases of ODA
harmonization and coordination?
5. What are the alternatives for Laos to improve aid coordination and
harmonization in order to promote power sector development?
Research Methodology
To achieve the above objectives this dissertation follows three steps of
research:
Collecting data. (i) Primary data were collected from different aspects
regarding power sector. The samples from each view were taken from different
sides of the sector. The author had deep personal interviews with different
managers, leaders, practitioners of related institutions/ organizations within the
Ministry of Energy and Mines, MPI, international offices, etc.
(ii) Secondary data were obtained from different sources (Office of the
xvi
government of Lao PDR, international sources, etc) but mostly from research work
done by international offices from which I myself had been involved to some
extent. Some relevant literature were also reviewed.
Data and information analysis. Data and information obtained are used to
analyze current situation of ODA use in Lao PDR.
Recommendations. Possible policies and solutions regarding the
development of the power sector of Lao PDR in years to come will be outlined in
the last chapter based on previous analysis.
1
CHAPTER 1. LITERATURE REVIEW
Official Development Assistance (ODA) has a long history, yet its
effectiveness and efficiency has always been a concern of both the donor and the
recipients. In order to enhance the efficiency and effectiveness of ODA, the Paris
Declaration has been identified as the key development frame work in leading the
aid effectiveness agenda. It is a contract between members from various developed
and developing countries in an effort to reduce poverty. This thesis draws attention
the aid effectiveness agenda and the search for better ways to work in the
development field, including governments and development professionals.
1.1. According to A. McCarty and A.Julian [1], (Bilateral) ODA to Lao
PDR originated in the early 1960s, and multilateral ODA was first recorded in the
late 1970s. Since then, total ODA has shown a strong increasing trend up to the
present, although there has been some fluctuation year on year, with bilateral donors
traditionally contributing the larger proportion of ODA. Total ODA in 2007 stood at
US$ 280 million, which is approximately 7% of GDP - a large percentage relative
to other aid recipients. Japan, France, and Sweden are Lao PDR’s largest bilateral
donors, contributing respectively 40.1%, 16.8% and 11.8% of total bilateral aid
between 2005 and 2007.
Lao PDR is classified as an LDC and is, therefore, covered by the 2001 DAC
Recommendation to untie aid. Between 2005 and 2007 DAC donor countries
formally untied over 70% of their ODA commitments to Lao PDR (CRS).
Meanwhile, for the same period, 22% of bilateral ODA remained unreported with
regard to tying status. The process of untying aid has improved over the last decade,
despite the hesitation of some donors to move to non-project based aid modalities,
such as budget support and pooled funding, which are often associated with
untying. Lao PDR receives largely grant aid as an instrument (98% of DAC ODA in
2007) and project based aid modalities. Several donors also provide project based or
free-standing technical co-operation, in many cases alongside grant funding for
projects, which is often tied. For example, grants which involved no free-standing
technical cooperation (FTC) reported a 96.8% untied share, whereas grants which
2
had a whole FTC component reported an untied share of just 27.8% (CRS, 2005-
07). The three largest DAC donors to Lao PDR; Japan, France and Sweden, all
reported a high proportion of their ODA as untied for 2007: 68.9%, 62.3% and
98.5% respectively. Lao PDR also receives substantial aid from non-DAC donors
that is considered to be largely tied and not necessarily conforming to OECD
definitions of ODA.
The aim of the econometric analysis is to determine whether ODA, the tying
status and the instruments by which aid is provided (loans and grants) have any
significant impact on aggregate donor export flows to the recipient, in this case to
Lao PDR. Overall, the results show that aggregate ODA, and grants in particular,
have significant trade distorting effects through the increase in donor-recipient
exports. This empirical evidence suggests that aid flows could be informally or de
facto tied, when analysis of data from a cross section of donors to Lao PDR is
performed. However, as outlined in the econometrics investigations this analysis
has some caveats.
1.2. Soudalie Silaphet [81] conducted a study to find out solution to the
problem of poor delivery of ODA is that the development industry must improve its
ODA spending systems and incorporate aid budgets into the national budget and
development plans. It is vital to encourage national governments to lead their own
development agenda and support development according to local priorities. He
found that it is not just a matter of coordinating aid effectively, but the aid industry
needs the right capacity and people to be involved. Capacity building is much
needed within the recipient national offices as well as many of the international
donor agencies. This would allow the local government to take the lead and
prioritise the commitments signed in the Paris Declaration, the Vientiane
Declaration and the Millennium Development Goals.
He also recommended that the number of agencies It is recommended by
many practitioners that the number of agencies working in decision making
processes in the aid effectiveness agenda in Laos should be limited to reduce
transaction costs and promote clear communication within the development
community. However different environments such as Timor L’Este, suggests that
3
civil society should be involved more and that donor agencies should not take the
lead in aid delivery.
1.3. According to OECD [61], Lao PDR, in 2006, had a gross national
income (GNI) per capita of USD 2050 (in purchasing power parity terms). Lao PDR
is a low-income country with high poverty rates. The most recent poverty survey,
conducted in 2002, estimated that 27% of the population lived below the dollar-per-
day international poverty line, with 74% living below the two-dollars-per-day line.
The country is on track to meet three of the eight Millennium Development Goals
(MDGs): MDG 2 on universal primary education; MDG 4 on reducing child mortality;
and MDG 5 on improving maternal health. In 2006, total net official development
assistance (ODA) amounted to USD 364 million, with the Asian Development Fund
(ADF), Japan and the World Bank were the top three donors for 2005-06. Lao PDR
was not included in the 2006 Baseline Survey for the Paris Declaration. Thus, the
country’s 2010 targets will be based on the results of the 2008 Survey.
Sixteen donors responded to the 2008 Survey, with their aid constituting
75% of total ODA provided by members of the OECD Development Assistance
Committee (OECD-DAC). Aid accounts for some 12% of GNI in Lao PDR; thus, it
is vital that government and donors work together to enhance aid effectiveness.
In order for aid to be effective, it must be aligned with national development
strategies, institutions and procedures. The Paris Declaration envisions donors
basing their support fully on country partner aims and objectives. Indicators will
examine several dimensions of aid to assess the degree to which partner countries
and donors achieve alignment. The data for Lao PDR suggest that there is
substantial room for progress for most indicators, especially with regards to
improving the reliability and use of country systems, for which the baseline is very
low. Although reforms are being made, there is a lack of financial and human
capacity to implement and reinforce these reforms, which calls for long-term
commitment from donors. The limited use of these systems also contributes to low
levels of aid reliability which further lowers aid effectiveness.
Capacity constraints significantly undermine the ability of partner countries
to capture, co-ordinate and utilise aid flows more effectively. Under the Paris
4
Declaration, donors committed to providing technical co-operation in a manner that
is co-ordinated with partner country strategies and programmes. This approach aims
to strengthen capacities while also responding to the needs of partner countries.
Likewise, there is greater recognition that successful capacity building is
endogenous – e.g. is led by the partner country.
To this end, the partner country defines clear objectives to ensure that
existing capacities are used effectively and that external support is harmonised
within this framework. Some indicator focuses on the extent to which donor
technical co-operation – an important input into capacity development – is moving
towards this country-led model. It measures the degree of alignment between donor
technical co-operation and the partner country’s capacity development needs and
strategies. The Paris Declaration 2010 target is that 50% of technical co-operation
flows are implemented through co-ordinated programmes that are consistent with
national development strategies. Data for 2007 shows that 54% of technical co-
operation to Lao PDR was co-ordinated with country programmes. This is
encouraging. The remaining gap may be the result of the NSEDP’s overall lack of
an articulated strategy for dealing with capacity bottlenecks. The Vientiane
Declaration has given attention to this issue and has formulated capacity
development frameworks for the NSEDP’s priority sectors. Co-ordination of
technical co-operation is now taking place in the education sector and is an
important component of the PFMSP.
The Paris Declaration 2010 target is that 50% of technical co-operation be co-
ordinated with country programmes. The data suggest that Lao PDR has already
exceeded this target although further progress can be made. A government-
commissioned report on the impact of technical co-operation was recently conducted:
the lessons learned from this report will provide a platform for further improvement.
On aggregate, 38% of scheduled disbursements in 2007 were accurately
recorded by the government, although only 65% of scheduled aid was actually
disbursed. For the average donor, the ratio was an even less encouraging 24%.
These gaps can result from several factors: inconsistencies and gaps in the legal and
institutional framework for managing ODA; weak co-ordination between donors
5
and the government in preparing realistic disbursement plans; and donors and
government using different PFM and procurement systems. The government is
taking steps to improve the predictability of aid by establishing a comprehensive
ODA database and by working with donors to develop ways to improve overall
project and financial management.
1.4. According to Travis Harvey [84], the government of Lao PDR and donor
counterparts have a good understanding of the steps required for success and
ownership of the process. DG’s experiences have taught us to adopt a collaborative
approach in designing and implementing processes for aid management, and to
ensure they build on existing ones rather than seeking to replace them. Regular
introductory and refresher user training for key staff has proven critical, as has the
identification of advanced users who can play a role in supporting others in the
future. During this mission the team conducted group training for desk officers and
one-on-one training for senior government officers.
Connectivity between government offices and the AMP server has been an
issue over the past few months because the government data center was being
moved into a new building. During this time DG hosted the system off-site to
maintain access for users. This issue was resolved during the mission by re-
establishing a stable hosting arrangement and fiber-optic connection to the Ministry.
Development partners will access the system via the internet when they begin using
it later this year.
Broad stakeholder buy-in is key to success in AMP country programs. During
this mission the team held a workshop to sensitize other government agencies and
development partners to the program and the workplan. This will be especially
important in the lead up to the national Round Table Meeting (RTM) to be held in
October. The RTM will be a major opportunity to raise awareness of the program, and
DG will be there to support MPI in preparing and demonstrating the AMP system.
6
CHAPTER 2. THEORETICAL FRAMEWORK ON ODA COORDINATION EFFECTIVENESS
2.1. Development Theory
There are many arguments regarding development. Roger Riddell [68] notes
that foreign aid is often defined by its purpose; however, to understand the purpose,
of development aid, it is first necessary to understand what development is.
President Truman’s 1949 inauguration speech is often credited as the
commencement point of the modern-day development era [70]. President Truman
(1949) perceived development in economic terms but recognised that “their
[developing countries] poverty is a handicap and a threat both to them and to more
prosperous areas”; in essence, linking United States (US) development and stability
to the economic and democratic development of the wider world.
Development has a connection with poverty reduction. The early focus of
development concentrated on the reduction of poverty primarily through the
promotion of economic growth [21]. Development, in this sense, or otherwise
known as Modernisation Theory, was seen as developing countries following the
same growth path as pioneered by Western nations [41]. Proponents of this view,
for example Walt Rostow (1960) [98], understood development in a linear
economic fashion that was measured through such narrow indicators as Gross
Domestic Product (GDP). Des Gasper [26] notes that in its crudest form,
development equates to economic growth. However, this narrow understanding of
development raised criticisms from other academics. David Hulme and Andrew
Shepherd [96] noted that it understood “the poor as a single homogeneous group
whose primary problem is low monetary income and has led policymakers and their
advisors to search for ‘the policy’ that increases the income of ‘the poor’”. John
McKay [41] remarks that new theories on development emerged in the 1960s due to
the persistent failure of developing countries to actually develop. These theories
looked at wider development issues such as the structure of the international system
in dependency theory; or the expansion on this idea in World Systems theory; or
proponents of ‘wider development’ posit the expansion of liberty to the individual .
7
Nevertheless, new theories developed over time, with two of them being
prominent today; Neo-Liberalism and Human Development. The former emerged in
the 1980s and can be seen as a resurgence of modernization theory. It proposes the
liberalization of international trade and sees development in economic terms that
occurs through market and private investment. It requires developing nations to
undergo structural adjustment programmes to configure their economies to the
western formats [41] [21] [35]. Conversely, Human Development posits that
“development can be seen... as a process of expanding the real freedoms that people
enjoy...focusing on human freedom” [76]. This approach emphasizes the
improvement in individual capabilities [68]. It considers other factors beyond the
economic progress such as the ability to attain education, health and security.
Moreover, security, in this sense, is the concern of the individual; human security. It
is measured by the Human Development Index from the United Nations (UN), with
the 1994 report being a turning point in linking development and (human) security.
Human security came to prominence in the mid 1990s, owning to it being
seen as an alternative to the narrow economic growth models of the International
Monetary Fund (IMF). It was developed along with many other security theories as
academics began to analyse security beyond the traditional state centric military
approach that was dominant, and rarely challenged, during the Cold War [66] [96].
One such theory, developed primarily by Barry Buzan and Ole Wæver at the
Copenhagen Peace Research Institute (COPRI), is securitization theory. This theory
has sought to ‘broaden’ and ‘deepen’ the security concept, however, the state
remaining as the primary object; a fundamental disparity from human security.
2.2. Development Aid
2.2.1. Donor Motives
Despite of aid had existed long ago, President Truman’s speech is considered
to be the commencement of the modern era in development and consequently,
development aid. Riddell [68] notes that the United Kingdom (UK) and France
both provided aid to their colonies in the 1920s and 1940s. Therefore, while
President Truman’s speech was not a revolution in designing a new concept, it did
shape the existing concept. It conveyed the idea more broadly to the developed
8
world and beyond aid solely to colonial territories. The principal that underpins
foreign aid, according to Riddell [68], is “[t]hose who can should help those who
are in extreme need”. The underlying assumption of this principal is that it is the
donor’s responsibility to selflessly help. Initially, US aid cannot be seen in this
light. President Truman (1949) stated that the motives for US assistance lay in
helping poor people “realize their aspirations for a better life”. Additionally,
President Truman [84] linked the success of these developing countries to the
success and security of the US. Consequently, any aid that was provided went to
nations supporting US views [82]. As aid is rarely given solely for altruistic reasons
[9], when examining aid, it is essential to understand the motives of the donor as
they can often conflict with the altruistic principal Riddell proposes. Riddell [68]
outlines eight motives in donor decisions to give aid; (1) to help address emergency
needs; (2) to assist recipients achieve their development goals; (3) to show
solidarity; (4) to further the donor national political and strategic interests; (5) to
help promote donor-country commercial interests; (6) historical/colonial ties; (7) to
strengthen global public goods; (8) aid based on human rights decisions. While
simultaneously appeasing to many motives, most donors have strong tenets to a
few. The UK and France have traditionally been large sponsors to their former
colonies; in 2006, eight of their top ten recipients of aid were former colonies [62].
Scandinavian aid is focused towards reaching the poverty goals of their target
countries [20]. In this regard, Scandinavian aid is often rated highly for its
effectiveness by the Commitment to Development Index [16] while other countries
receive an unfavourable review; US, Italy and Japan. Aid from these countries is
often criticised for being highly tied , with a principal focus on developing donor
commercial interests and/or dependent on national, political and strategic interests
[75] [68] [65]. Unsurprisingly, these motives can be recognized in the donor’s
public discourse and delivery of aid. Taro Aso [8], the then Japanese Minister of
Foreign Affairs, stated that aid was given to enhance the Japanese national interests and
that the first use of the Japanese people’s money was to benefit the Japanese later on.
US aid is also explicit in stating that its purpose is to “furthering America's foreign
policy interests” [95]. This discourse is reflected in the delivery of their respective aid.
9
Japanese aid is highly concentrated around East Asia and highly tied to Japanese
companies and interests [49]. During the 1980s and 1990s US aid was greatly linked to
the promotion of the Washington Consensus. With the exception of US special interest
in Egypt and Israel, Alberto Alesina and David Dollar [7] note that US aid in the 1990s
was focused on poverty, democracy promotion and encouraging economic openness. In
addition, over 70% of US aid has been tied to promoting US commercial interests to
the extent that this practice was formalised in US law in 2002 [68].
2.2.2. Defining Official Development Assistance (ODA)
Craig Burnside and David Dollar [14] stated that when aid is given with a
high regard for donor self-interest then it is often ineffective in achieving
development. Accordingly, in such incidents, aid can be seen as a foreign policy
tool of donors. Jean-Claude Berthelemy [9] concurs and in his study notes that all
donors, with the possible exception of Switzerland, are egoistic in the delivery of
their aid to differing degrees. Riddell [68] remarks that definitions of aid are driven
and shaped by those (invariably donors) who have an interest in particular types and
forms of aid. Therefore, any definition of aid is dependent on the motives of donors
and will have a self-interested edge to it. Consequently, in defining development
aid, this dissertation seeks to utilise the Organisation for Economic Co-operation
and Development (OECD) definition. The definition is not absolute, as it is
formulated by the members of the 30 developed countries in the Development
Assistance Committee (DAC) of the OECD and, therefore, donor driven. However,
it is widely cited, reached by consensus by the major donors and utilised by the UN.
OECD defines Overseas Development Assistance (ODA) as: “Grants or Loans to
countries and territories on Part I of the DAC List of Aid Recipients (developing
countries) which are: (a) undertaken by the official sector; (b) with promotion of
economic development and welfare as the main objective; (c) at concessional
financial terms [if a loan, having a Grant Element (q.v.) of at least 25 per cent]. In
addition to financial flows, Technical Co-operation (q.v.) is included in aid. Grants,
Loans and credits for military purposes are excluded ... Transfer payments to private
individuals (e.g. pensions, reparations or insurance payouts) are in general not
counted.”(OECD, No Date)
10
This definition is still contested by certain members of the OECD. Non-
Governmental Organisations (NGO) are concerned as some OECD member states seek
to expand the definition to incorporate additional donor security spending [11]. Since
all OECD members are committed to meeting the UN Resolution 2626 in 1970 of
providing 0.7% of their Gross National Income (GNI), and currently, as many states
are failing, any expansion of ODA would facilitate donors in achieving this goal [92]
[68] [12]. By linking development aid to conflict, some donors want to include
spending on the removal of landmines, prevention of child soldiers and even
international peacekeeping. British Overseas NGOs for Development [11] is concerned
that the inclusion of military/security costs into ODA would permit a diversion of funds
away from non-strategic countries. Riddell [68] affirms that aid is a tool used by the
donor to promote development. During the Cold War the different sides of the
ideological divide used aid as a self-serving tool to promote their conception of
development, establish commercial interests and/or as a coercive instrument [69]. The
fall of the Berlin Wall did not change this [36]. Donors focused their aid toward either
the Washington Consensus (USA, IMF and World Bank), thereby instilling the neo-
liberal model upon developing states, or, to a lesser degree, Human
Development/Security strategy (Canada, Norway and United Nations).
2.3. Aid coordination and its effectiveness
Aid coordination comprises activities of two or more development partners
that are intended to mobilize aid resources or to harmonize their policies, programs,
procedures and practices so as to maximize the development effectiveness of aid
resources.
This definition focuses on the two long-standing goals of aid coordination:
resource mobilization and increased development effectiveness. The literature
distinguishes several levels of aid coordination:
- Information sharing and consultation, to understand the activities, plans,
and perspectives of other actors
- Strategic coordination, to reach a consensus on policies, strategic
objectives, and key procedures and practices
11
- Operational coordination, to reach agreement on a common program or
project to be carried out and financed jointly.
While level one can be viewed as the precursor to aid coordination, it lacks
the active harmonization element embodied in the definition adopted above. A key
distinction between the second and the third levels of aid is that under strategic
coordination, projects continue to be financed by separate donors (although in a
manner better integrated with national priorities), while under the latter, donors and
the recipient country pool resources to carry out a joint set of activities or programs.
Not surprisingly, the literature indicates that aid coordination becomes more
difficult for participants as they try to move from one level to the next.
According to Arne Disch [8], the so-called “Pearson Commission” presented
its report entitled Partners in Development. Report of the Commission on
International Development 30 years ago. Key themes in that report remain valid
today: the recipient must be responsible for its own development policies but donors
have a right to be consulted; the interaction between the parties should be based on
a partnership where predictability and performance based resource flows are
integral parts. Aid coordination has subsequently become a key dimension in the
operation of the partnership concept. Donors and recipients alike are allocating
increasing resources for aid coordination activities, with the understanding that
efficient aid coordination generates efficiency gains. It is not clear, however, how to
measure these efficiency gains, nor is there a good understanding of what a “least
cost” strategy for aid coordination improvements should look like.
Two kinds of aid coordination take place at the international level. Focused
events such as the international conferences help generate consensus on overarching
policy issues, largely on specific issues like the environment (Rio), education
(Jomtien) etc. On the other hand, more permanent institutions like OECD/DAC or
process-oriented force like the SPA work with systemic and implementation
problems. Most of the latter institutions are donor-driven, however, with recipient
countries having limited influence. Coordination at the recipient country level
usually includes overarching development issues and financing of national priorities
through Roundtable or Consultative Group meetings, held abroad or in-country.
12
There are often a variety of inter-donor coordination mechanisms in place as well as
government-donor force, both at macroeconomic and sector levels. The number of
such coordination activities has grown rapidly over the last years without clarity as
to what the outcomes of them have been. There thus seems to be a lack of focus and
results-orientation regarding the aid coordination activities themselves, which
represents a major challenge both to donors and recipients.
Aid coordination can be de-composed along several dimensions: geographic
(international coordination on general issues versus recipient country-specific);
content (policies, principles and priorities versus procedures versus practices);
degrees of intensity/commitment (general consultation versus cooperation at the
strategic level versus collaboration at implementation level); national issues versus
sector and sub-sector issues; at geographic/regional level within a given country;
and along functional lines (technical assistance versus general balance of payments
support, for example). By de-composing aid coordination efforts along these
various dimensions it may be possible to identify which cells in the multi-
dimensional coordination matrix yield the higher pay-off to effort.
Regarding mechanisms for aid coordination, the most common one – infor-
mation meetings – may also be the least efficient and could be streamlined/
downsized. At the other extreme, formal contracts often represent cost-efficient
coordination because while they may be costly to establish – investment costs are
high – they generate lasting and potentially substantial reductions in recurrent
transaction cost, and these are the real problems for local administration.
Successful aid coordination implies structural changes to resource flows – in
particular that central agencies like ministries of finance take on a coordinating and
thus a stronger role. This may often generate resistance from those within the local
administration that feel they will lose out, such as aid-favored units in line
ministries – a problem that should not be underestimated. Understanding the politics
of aid coordination is therefore as important as understanding the economics of it.
If there is no coherent government development program and strategy in
place, donors cannot substitute for this by coordinating their own strategy processes,
but should rather support government’s efforts at developing a credible program.
13
This position arrived at for example in the context of a Mozambique survey, is not
accepted by all donors, who believe that many recipient governments are not serious
about addressing key structural issues and that donor conditionality is still required.
Recent studies note the failure of conditionality as a means for attaining policy
changes, however, and this points to the need for more imaginative and constructive
support for recipient-managed strategies.
2.4. Dimensions of Development Assistance Coordination
International community recognizes different dimensions of development
assistance coordination:
• Donor coordination refers to the specific mechanisms and arrangements
agreed within the community of development partners to improve their effectiveness
as partners in the development process. It is a subset of aid coordination.
• Aid coordination refers to the established mechanisms and arrangements
that country governments and their development partners have agreed on in order to
maximize the effectiveness of external aid for development at national or sector
levels. It is a subset of development coordination.
• Development coordination (at national or sector levels) refers to the
combination of aid coordination and the national government systems (policy-
making and implementation, governance, accountability, etc.) that ultimately deliver
development results.
The integration between the receipient national plan and donor coordination is
necessary. Donor or aid coordination efforts alone will not achieve significant
development results unless they are effectively integrated within national
development planning and governance structures and systems. In other words, the
aim of coordination is not just “aid effectiveness” but “development effectiveness”.
The above definitions are useful because the three dimensions of coordination
can be seen as three “stages” with different characteristics. Stage one is donor
coordination. In this stage, the main drive usually comes from the development
partners, while government usually plays a passive role at this stage (lack of systems to
deal with aid or to engage with the donors in policy dialogue, etc.). Stage two is aid
coordination. This stage deals with more proactive engagement of government
14
counterparts and setting up of the foundations of improved aid forecasting, accounting
and aid management systems on the government side. Stage three is development
coordination. In this stage, the government increasingly takes the lead in policy design
and implementation, employing effective mechanisms for management of all
government resources. There are efficient mechanisms of cooperation between the
government and the community of development partners integrated with government
mechanisms and systems. All three types of coordination use different instruments and
at different level (national, cross-sector, sector, local, programme, etc.). Major
challenge lies in adequate definition of sectors and appropriate levels of coordination.
2.5. Sector Wide Approach and Programme Based Approach
Programme-based approaches (PBAs) and a sector-wide approach (SWAp)
differs in its forms and targets. PBAs have been defined as a way of engaging in
development co-operation based on the principle of coordinated support for a locally
owned programme of development. SWAp is a programme-based approach
operating at the level of an entire sector. It is a method of working that brings
together governments, donors and other stakeholders within any sector. It is
characterized by a set of operating principles rather than a specific package of
policies or activities. The approach involves:
• Government leadership • Developing a single sector policy (ideally a policy that addresses private
and public sector issues) and a common realistic expenditure program (budget
framework);
• Formalized process for donor co-ordination and harmonization of donor
procedures for reporting, budgeting, financial management and procurement
• Efforts to increase the use of local systems for programme design and
implementation, financial management, monitoring and evaluation .
A sector-wide approach (SWAp) is an increasingly widespread approach to
development assistance in low-income countries. The SWAp model is seen as an
important approach to enhancing aid effectiveness, mostly through improved
efficiency that would result from better aid coordination where the focus is put on
15
developing and strengthening sector policies and institutional arrangements.
However, it is important to keep in mind that a SWAp and programme-based
approach can be implemented without any external funding at all, with the purpose
of strengthening coordination, coherence and efficiency in relation to desired results
in a certain area.
2.6. Principles of Effective Aid Coordination
OECD monitoring survey 2006 [42] reported that for aid to be effective, each
country needs to determine its own priorities, pace and sequencing of reform. The
monitoring identified that transaction costs of managing foreign aid and the place of
change is slow in donor practices. There is a strong disconnect between headquarters
policies and in-country practices. It is recommended that demonstrating tangible
changes in practices is fundamental in sustaining momentum and achieving further
progress.
The main principles that serve as basis for defining improved aid coordination
mechanism are:
1. Efficiency which refers to the best use of limited resources, 2. Alignment with national planning, programming, monitoring and
reporting processes, strategic documents and priorities,
3. Flexibility to establish and abolish donor coordination groups per need
and avoiding administrative overburden of public administration staff,
4. Complying with donor requirements and established systems and
procedures for programming of donor’s funds,
5. Using existing national planning, programming and monitoring structures
and procedures,
6. National leadership and ownership in aid coordination, 7. Improved harmonization and coordination among donors activities and
priorities in each sector.
16
CHAPTER 3. KEY LESSONS LEARNT FOR LAO PDR
This chapter will detail lessons for the aid effectiveness agenda from two
neigbour countries, namely Vietnam and Timor L’Este. Vietnam has been selected
as a case simply because it has been an important template for the improvement of
aid effectiveness in other nations in the region. Vietnam has a model for Laos to be
learnt since both of the countries have political similarities and are neighboring
countries with special relationship agreement.
While Timor L’Este is different from Lao PDR, in terms of context, political
situation and it said coordination model, it offers some important lessons from a
different environment. The lessons to be learnt from international agencies based in
Timor L’Este are essential. It shows that it is not just a matter of government taking
ownership in the aid effectiveness agenda but also how the international
development community can work together for good aid delivery outcomes.
The chapter will illustrate how aid coordination is pursued in both ways. The
Vietnam section will examine how the Paris Declaration is localized at the country
level, and analyses how the overall aid effectiveness agenda is organized. It will be
shown why many international development agencies recommend that Vietnam is
an example for region to follow. Timor L’Este will be looked at in terms of
reviewing aid reports from the existing literature that is currently accessible through
the internet.
The case is drawn from multiple sources on aid effectiveness monitoring
reports and Soudalie Silaphet [81] .
3.1. Lesson from Vietnam
Before the Paris Declaration, UN agencies were fully involved with the
Vietnamese government in coordinating aid. A good partnership has been illustrated
since 1993 with improved aid management. Vietnam has under gone a remarkable
transition from a closed economy oriented toward the former Eastern Bloc countries
to a market oriented economy with rapidly growing trade and aid relationships with
17
its Asian neighbors and Western donors. The growing influx of foreign capital, both
private investment and Official Development Assistance (ODA), has helped fuel
high rates of economic growth but also created a series of challenges for the
government. In the past several years, the government has taken a series of steps to
strengthen its ability to define priorities for development assistance, coordinated on
or support, and manage aid more effectively.
Since the Paris Declaration, the Vietnamese government has realized that localization of this agreement is essential. The Prime Minister’s Decree on the
issuance of the regulation on the management and utilization of aid from international non-governmental organizations has been effective since April 26,
2001. This resulted in the Ministry of Planning and Investment (MPI) and Ministry of Finance (MOF) becoming the sole aid coordinators [79]. MOF has the role of
organizing public expenditures and managing budgets while MPI has had the overall role in aid coordination and management.
The Ministry of Planning and Investment has a department which is
responsible for aid coordination. MPI helped to establish the Partnership Group on
Aid Effectiveness (PGAE) and is a core member of the ‘Friends of the Co-Chair’
group who produced the Hanoi Core Statement (HCS) which consists of
representative of government and donors. PGAE act as a forum for partnership
groups and donor groupings and provides frequent opportunities to discuss and
monitor implementation of the HCS.
Although the Task Force that is the PGAE for aid effectiveness working
group is organized, it has a weakness in practical use because the concept of it is
lost. The HCS spells out in the local context the implications of the Paris
Declaration. The success factors resulted from strong leadership of the Vietnamese
government, a continuous effort to ensure that the donor community commit on the
agenda with a balance of a competent group of visionaries and strategic thinkers.
This is important because, if these involving representatives do not have the right
capacity to be involved in the aid coordination agenda; it is unlikely that
coordination process will be successful. The PGAE continue dominating the
processes in aid effectiveness agenda in Vietnam and putting the Hanoi Core
18
Statements in to implementations.
The Hanoi Core Statement became effective on 28th September 2005.
Vietnam became the first partner country in the world to localize the Paris
Declaration on Aid Effectiveness in the Vietnamese Context.
The Hanoi Core Statement scents reason the following principles which
includes 14 indicators and targets that have been agreed by the Government and the
donors. These indicators are used to monitor the progress achieved in improving aid
effectiveness in summary [46].
1. Ownership: The government is the leader and owner of the development
agenda.
2. Alignment: Donors use government plans and government systems.
3. Harmonization: Donors and government harmonize ways to deliver aid.
4. Managing for Results: The government manages for results and donors use
the government’s results framework where possible to measure success.
5. Mutual Accountability: donors and government share accountability for
aid effectiveness.
In order to translate commitments in to concrete practices, the PGAE
continues being the focal point. The group meets on a monthly basis under the co-
chair of the Ministry of Planning and Investment with the European Commission. A
base line survey was conducted twice to measure progress towards meeting the
Hanoi Core Statement and to compare data for accuracy.
To make the HCS practical the Vietnam Harmonization Action Plan 2005-
2006 (V- HAP) was established to support the implementation. The V-HAP
contains a large number of activities to be implemented by arrangement of
government agencies and donor. Figure 3.1.1 below illustrates how ODA is
distributed once the process of Paris Declaration is localized and implementation is
outlined. The right-hand column shows how aid effectiveness agenda is localized.
Mean while the ODA resources (middle column) support Vietnam’s development
agenda, that is through a strategic framework administered by the PRGS/CPRGS
through a short term plan of 5 year Socio Economic Development Plan which
19
complements the 10 year Socio Economic Development Plan (SEDP), illustrated in
left hand column.
Figure 3.1: Relationships between Vietnam Development & Aid Effectiveness Agenda
(Ministry of Planning and Investment & UNDP, 2005)
Figure 3.2: Improving Aid Effectiveness to Support Vietnam’s Development
(Ministry of Planning and Investment & UNDP,2005)
The 10 highlights of the current status of Aid effectiveness in Vietnam
20
includes [47] from adopting the HCS which the government recognizes the Paris
High level forum as one of global leader. The SEDP detail sectorial and
provincial plans with consultation with donors. The development of the ODA
Strategic Framework has been done. An ongoing process to strengthening the
legal framework for public investment and ODA, including drafting the
Procurement and Public Investment Decree and revising the Environment Law.
The Joint Government and donor for the Public expenditure Review was
launched to create awareness, along with the launch of the Targeted budget
Support Programs for Education for all as well as continuous promotion for
increasing number of donors joining the poverty reduction support credit. This
common reporting system tool was successfully piloted. The problem-solving
efforts have been undertaken by the inter-Ministerial Taskforce which is handled by
the PGAE.
3.2. Lesson from Timor L’Este
Unlike Vietnam or Laos, Timor L’Este was not one of the original
signatories of the Paris Declarations. Therefore their agenda does not include any
commitment to localization of the Declaration. They also have a different
environment and vulnerable political situation in comparison with other countries.
A vulnerable country like Timor L’Este receives aid 3.6 billion US dollars of
international assistance between 1999-2006 (Norad, 2007) where a majority of
ODA are for emergency relief and long term state building efforts. Included in this,
half of the amount was made up from contributions from the UN missions and the
other half was from 28 bilateral donors as well as multilateral donors.
The major challenge in working in Timor L’Este is the availability of
statistics. Many development practitioners struggle to find indicators because of
limited existence of important documentations. Giving the circumstances of being a
young an unstable political situation, it is difficult for Timor to get into coordination
effort to make their abundance of aid received effective.
The local aid environment is entirely dominated by development agencies
particularly the massive UN mission based in Dili, the capital city. There is limited
economic activity within the country and aid dominates the economic growth.
21
Timor is chosen as a lesson to be learnt for aid coordination because it has
demonstrated good joint aid delivery within the development community.
Financial assistance is not the only aspect of the ODA portfolio. The
international community has provided more than the real value. These are combined
packages of military and police force support, UN missions from transition mission
to current state building mission, and humanitarian technical assistance [68].
COMPACT was the only mechanism to coordinate how a development community
comes together and talk about the needs for the country and what donors can do to
meet such requests. The challenge was working with a transition government that
could mean any decisions made in that day would later not have future values. The
COMPACT meeting consists of officers from government and development
agencies and representative of civil society and head of local communities.
Although the outcomes of the meeting held were not effective, given that was the
first coordination initiative.
The unique development practices from Timor L’Este were the development
community coordinates aid within themselves. Because of the transition situation
and that the country is still in a weak position to lead development agenda. The
donor community has approached aid coordination amongst themselves. Within the
UN missions and UN agencies there are coordination within themselves, while
other donors and the rest of the community try to come together and work on joint
programs in order to share the limited available resources that the country has.
Following the post conflict reconstruction, many external partners particularly
bilateral donors such as Japan, Norway, US, Australia and international banks
(World Bank, ADB) have moved toward establishing a presence in the country and
have geared toward long term day-to-day engagement. Under the previous
government leadership, external partners have supported the development in
National Development Plan (NDP). Most of the development agencies are aligning
their assistance with the NDP. The World Bank’s Country Assistance Strategy
(CAS) for FY06-FY08 includes a result framework to support NDP implementation
and supports all development partners (Development Gateway, 2006). This became
an agreement obtained by both development partners and the Government of Timor
22
L’Este. A join trust fund was created (Trust Fund for East Timor) in 1999 to support
the reconstruction and development activities. The World Bank has been playing the
central role in supporting the government in capacity development, coordinating all
partnerships within the country. For Analytic and Sector Work in reconstructing
Timor L’Este several major donors created Joint Assessment Mission (JAM) to
identify the priorities for Macroeconomic development. This is a great example of
effective aid practice, namely having agencies join together with one objective and
contribute each specialized resources into one program or project.
Many development agencies understand that in order to achieve the
Millennium Development Goals (MDGs), their development practices need change
to improve development practices and expedite the effort of MDGs. UN agencies
‘programs have been jointly organized through channels of funding, with one
objective. Many of their specialized agencies do not have independent projects and
have moved to new programs with join initiatives. Even fund raising efforts have
been jointly organized which is much different from UN agencies in Laos. The UN
Trust Fund for Human Security (UNTFHS) was a great example of joint effort in
Timor, where UN agencies got together and have designed program and propose a
one of financial support to the Japanese donor. This task is managed and led by a
unit called Poverty Reductions Unit, within UNDP. This new proposed project also
involves many agencies through combined resources to explore how human security
could be addressed in Timor L’Este. That includes senior management team
representatives from: UNICEF, World Food Program, UNDP and UN Habitat. The
project will be involving several activities ranging from, micro-finance support by
UNDP, WFP will support children and family for food security, while UNICEF
overlooks at child health care and UN Habitat overlooks are providing homes for
families who were internally displaced during the internal crises.
Although Timor L’Este is a young country, many challenges lie ahead for its
people. The development community has set a great example in working together in
one common agenda. It realized that the local government needed to improve local
capacity to manage aid. Nonetheless, development agencies have been working
together in joint programs and projects to ensure efficient output. By doing so it
23
allows for development agencies to realize the current activities within the country
and avoid project duplications. They rely on working together in order to come up
with non-existing recorded statistics. This is the best development partnership
displayed in which other countries could learn from. From personal work
experience in Laos, much of the development community duplicates one another’s
projects simply because of poor communication and lack of awareness. With
lessons learnt from both countries Vietnam and Timor L’Este, Laos could look at
their model or practices for better aid delivery. This is relevant for both developing
country governments and applies well to development agencies.
3.3. Comparative Lessons
Vietnam has the advantage of having put its aid effectiveness portfolio
together much faster than Laos. Laos only started their agenda recently and
finalized their work plans late in 2007. Much of the Lao agenda still needs to be
improved because of local conditions. While Vietnam has a relatively good balance
of competent people working on the agenda, Laos needs to improve the local
capacity. Funding for training such as English language training, report writing and
basic specialized trainings in order to support the coordination effort from the
central level are also needed. That involves not just the local government’s ability to
coordinate aid, but the development community’s willingness and commitment to
support the agenda with the right capacity.
The development community seems confused and rather weak in making
good aid practice work. The important aspect of Vietnam’s successful model is that
the government has taken strong leadership within the development community.
The success factors also involve pushing the development community to cooperate
with the government’s agenda. Vietnam even has provincial plans beside sectoral
plans and consulting with donors to align. This is one of the components of aid
delivery that still needs improvement from the local Lao government situation.
Although two provinces have been identified to monitor the projects, the capacity of
provincial governments lags far behind and coordination is difficult to implement.
This is one of the reasons why aid coordination is still done entirely at the central
level. Thus, in Laos, capacity still needs to be significantly improved.
24
Vietnam is one of the first countries to get a head start with the localization
of the Paris Declaration. It became a model, particularly in South East Asia, for how
development communities in the region could coordinate aid effectively.
Accordingly, Laos has recently attempted to localize their version of the Paris
Declaration, and the development community there has drawn on the Vietnamese
aid effectiveness agenda as a leading model. Both countries are similar in terms of
their systems but Laos needs to catch up on more details, especially decentralizing
the coordination and monitoring down to provincial level.
Timor L’Este has particular characteristics in its development efforts and
draws much attention to the role of development practitioners. The unique
geographical location as well as its history has led to a situation where government
capacity in severely limited. Aid inflows are much higher in comparison to Laos
and coordination is essential. However, Timor L’Este has a weak state sector and,
as a result, has to bring civil society much more into its development agenda. At
present, Laos to be in a rather similar situation but shows few signs of involving
civil society effectively.
The Lao UN agencies have struggled to put joint programs together because
they have their own mandates to operate aid. Although they have been trying to
move from independent programmes to working together amongst themselves, it
has been really difficult for them to do so. Within UN agencies, they find it much
more difficult to coordinate aid and organize joint programmes, in comparison to
UN agencies in Timor L’Este. Timor L’Este has not yet signed up for the Paris
Declaration and therefore, the government is little concerned with localizing aid
effectiveness. However, the international is and development communities have
realized the importance of coordination and they have taken the approach through
the community themselves. With or without the government, they have realized the
instability of the political situation and the need to take actions for the people of
Timor L’Este. They have moved into joint programmes although their existence in
Timor has only been recent, since independence in 1999.
UN agencies in Laos often do not operate successful joint projects and there
are concerns regarding power and the management system, because some UN
25
agencies operate their programmes from headquarters rather than in country, such
as United Nations Conference for Trade And Development (UNCTAD). They have
their own mandates and different funding systems that are different from resident
agencies. Agencies like UNICEF have their own appear to operation system as well,
with independent funds disbursement system and operate independently. Some
smaller UN agencies that are resident and some non resident agencies had to
incorporate their funding mechanism into the UNDP system. This is one of the
reasons why joint programmes are so difficult. The unusual side of UN agencies is
the question of why coordination works well in some countries and others don’t
when they are basically the same type of organization. Due to these problems, aid
coordination is difficult when even the UN can’t coordinate its own agencies
properly to work together.
The lessons from both countries yield significant differences, yet both types
of governments and development partners agreed that the declarations are good
although the declaration were taken at higher level and they are difficult to
implement at ground level. There are concerns amongst smaller agencies that they
do not have a place in development roles because they could lose recognition in
flagging the name of their agency and its contributions into the pool funding
system.
26
CHAPTER 4. HOW ODA COORDINATION IMPLEMENTED IN LAO
Lao PDR is a landlocked country categorized as a Least Developed Country
(LCD) located in the heart of South East Asia, bordered by Cambodia, China,
Myanmar, Thailand and Vietnam (see Figure 5.8). It has a population of 6.1 million
(UNDP, 2011) most of whom live in rural areas. The official language is Lao,
though there are 49 officially recognised ethnic minorities divided into three major
groups: Lao Lum (low landers), Lao Theung (high landers) and Lao Soung
(Hmongs). The growth rate of Growth Domestic Product (GDP) is one of the
highest in the region at 6% but there is approximately 32% of the population living
under the poverty line of the $US 1.50 per day in 2002 (UNDP, 2011). Some 73%
live under $2 per day, and 25% less than $1 per day.
4.1. Millennium Development Goals (MDGs)
The Millennium Development Goals are a global commitment set by many
countries, both developed and developing. Faced with rising world poverty levels,
many donors and recipient countries gathered to set eight goals for the year 2015.
These eight goals break down in to 18 quantifiable targets that are measured by 48
indicators. The MDGs therefore represent broad agreement on the goal of poverty
reduction. Setting key objectives for aid, they help focus aid delivery. The overall
MDGs include the following:
Goal 1 is to eradicate extreme poverty and hunger by setting a target in
halving proportion of people living on less than a dollar a day and those who suffer
from hunger. Goal 2 is to achieve universal primary education by setting high target
to ensure that all boys and girls complete primary schools. Goal 3 is to promote
gender equality and empower women. The target set is to eliminate gender
disparities in primary and secondary education preferably by 2005, and at all levels
by 2015. Goal 4 is to reduce child mortality by setting a target to reduce by two
thirds the mortality rate among child under five. Goal 5 is to improve maternal
health targeting to reduce by three quarters the maternal mortality ratio. Goal 6 is to
combat HIV/AIDS, malaria and other diseases, the target halt and begin to reverse
27
the spread of HIV/AIDS by halting and beginning to reverse the incidence of
malaria and other major diseases. Goal 7 is to ensure environmental sustainability
with very intense targets. This target aims is to integrate the principles of
sustainable development into country policies and programs and reverse loss of
environmental resources. In addition, the target is to reduce by half the proportion
of people without sustainable access to safe drinking water, as well as achieve
significant improvement in lives of at least 100 million slum dwellers, by 2020. The
last, Goal 8, is to develop a Global Partnership for Development.
This is a donor driven approach set by many developed countries. The idea is
ambitious to reduce world poverty significantly. Accordingly, with targets set for
the year 2015, the MDGs have been set a apriority for many countries. The
importance of these goals requires an abundance of financial support and many
developed country’s donors have pooled their aid in the hope that poverty will be
alleviated. Since the year 2000 it has been noted that there has been an enormous
increase in the amount of ODA in order to meet the coming dead line. For many
countries, 2015 seem a distant future that is difficult to reach. Many reasons came
to be involved in the lack of government capacity in developing countries, lacking
the natural resources, limited financial supports, war, natural disaster, etc. Aid
effectiveness is essential for the development of poor countries. Since the MDGs
have been signed by many countries, more effort needs to be made so that the
deadline of 2015 is to be met. The MDGs reflects how aid effectiveness is
important so that the distribution of funds can be achieved those Millennium Goals.
However, since the adoption of the MDGs many development in situations and
donors still operate their aid programs in their original forms inhibiting the
coordination effort of the local government.
The MDGs have been adopted in Lao PDR. The United Nations
Development Program (UNDP) resident office in Vientiane has been the leading
agency for Lao PDR and support the localization of the global contract set by world
leaders in 2000. The UNDP has been supporting the Lao Government on the
localization and has promoted a number of tools to measure whether Laos has been
making progress on the MDGs. The tools used for supporting the work on MDG
28
commitments includes the Common Country Assessment (CCA) which details the
overall development environment of Laos before drafting the practical plans to
achieve localized MDGs goals (Government of Lao PDR & UN Country Team,
2006). The United Nations Development Framework (UNDAF) is another tool that
outlines how the MDGs could be met with coordinated contributions from the
entire development community. This as well is drawn from the local development
effort, the National Growth and Poverty Eradication Strategy (NGPES) has been
produced by the Lao Government to set out the coming period of the country’s
poverty alleviation strategies.
4.2. Paris Declaration
The Paris Declaration was endorsed on March 2, 2005 by many countries,
including hundreds of Ministers, Heads of Agencies, Senior Officers, to commit to
aid delivery efforts through harmonization, alignment, and management of aid for
better results with a set of monitorable actions and indicators (World Bank, 2006).
The Paris Declaration goes beyond other agreements such as the consensus reached
at Rome in 2003 to what is now a practical blue print for donors and developing
countries to monitor each other’s progresses. It strongly commits donors to
increasing the impact of aid in reducing poverty, increasing growth, building
capacity and acceleration achievement of the MDGs. It is a donor driven approach
in development that is organized by the rich member countries of the OECD. It is
very much the focus of how development should be dealt with from a donor’s
perspective.
The commitment for aid effectiveness includes a call (World Bank, 2007) for
developing country partners to exercise effective leadership over their development
policies, strategies, and to coordinate development actions. Donor countries will
then plan their overall support after a recipient country’s endorsed the Paris
Declaration. A survey was later carried out early 2008 where only 56 countries
responded to be surveyed (OECD, 2008).
4.3. Vientiane Declaration and Country Action Plan (CAP)
The Vientiane Declaration (The National Round Table Process, 2007)
spelled out a local commitment and decentralization on localization of the actual
29
Paris Declaration. The government of Lao PDR and its donor partners in
development have taken actions to make aid more effective and assist the Lao
government in achieving the Millennium Development Goals. They have set long-
term development goal of exiting the status of least developed country by 2020. Laos signed this Vientiane Declaration on November 2006 during the 9th Round
Table Processing Lao PDR. There were 22 countries and organization partners and
afterwards two more countries joined the signatories (Thailand and the Philippines).
Lateral Country Action Plan (CAP) was prepared between February and May 2007
to accompany the Vientiane Declarations. The reason for the CAP is to detail
implementable actions for the six indicators to be approached data country level.
The Vientiane Declaration reflects a mutual accountability and respect for
the ambitious structure of the Paris Declaration. However the Declaration does not
constitute legally binding commitment between governments and agencies. They
are another step in making aid work at a country level which the Lao government
will make available appropriate resources, knowledge and capacity to make the
Declaration effective. The five indicators of Ownership Harmonization Alignment
Managing for Result and Accountability (OHARMA) aim to improve aid
effectiveness in five different areas:
1. Increased country Ownership over policy and development plan,
implementation and aid coordination. This is in hand with the National Growth and
Poverty Eradication Strategy (NGPES) 2006-2010 to integrate with official
development assistance main stream planning.
2. Better Alignment of Development Partner's support to national policies and
plans, and increased support to use the national systems. A single Project
Implementation Unit (PIUs) or Project Management Unit (PMUs) for day-to-day
management and implementation of aid-financed projects and programs. This will avoid
the creation of parallel structures so that it can be fully integrated with the government.
3. Harmonization involves taking simplification of development partner's
procedures and activities.
4. Managing for Results in order to ensure effective use of resources. The
DIC will monitor actions.
30
5. Implementation is a responsibility of all signatories, and Government and
Development Partners will be Mutually Accountable for reporting on progress.
4.4. The Round Table Meeting/Process (RTM/RTP)
The Round Table Meeting (Ministry of Foreign Affairs & UNDP, 2007) has
been in operation in Lao PDR since 1983 with the support of the United Nations
Development Program (UNDP). Until 1993 the meeting focused on donator-annual
meeting in Geneva and for the first time in 2000 and is now organized locally in the
country. Rather than a three year initiative the local government has made it a
continuing dynamic process. The Round Table Process (RTP) focuses on
strengthening national and sartorial aid coordination mechanisms. The actual Round
Table Meetings (RTM) themselves being one component of a comprehensive
approach to aid effectiveness.
The RTM objective is to facilitate the consolidation of the Round Table
Process so that effective forms of aid integration, coordination and management are
established. It also requires building sustainable technical capacities for aid
coordination, integration and management in the country. Through this, UNDP has
been supporting the Government in ensuring sufficient resource mobilization.
UNDP has been providing ongoing support to the RTM, because it relates
directly to the United Nations Development Assistance Frame work goals of
poverty eradication. This is one part of the UNDP project that aims to support the
national development goals including the Millennium Development Goals and the
National Growth and Poverty Eradication Strategy (NGPES). It helps the
formulations of the Vientiane Declaration and the Country Action Plan on aid
effectiveness as mentioned previously.
Below is an outline of the Round Table Process (Figure 4.1). The nature of
the RTM is to meet on a three year basis which is a high level forum where high
ranking government representatives gather to discuss development of Lao PDR. The
annual meeting was also organized to follow up with development communities on
implementation of development agendas and preparation of the next RTM forum.
31
RTM (3 year basis)
Annual Round Table Implementation Meetings
Sector Working Groups Meetings
Sector Working Groups Meetings
Sector Working Groups Meetings
Figure 4.1: The Round Table Meeting Structure [104]
4.5. Sector Working Groups (SWGs)
Under the RTM, Lao PDR currently has 8 Sector Working Groups that bring
together representatives from government and donor agencies, and NGOs. The SWGs
are forums to discuss and build consensus about development priorities, and to improve
sectorial aid coordination and effectiveness setting out the Vientiane Declaration and
the Country Action Plan. Under the common frame work of the Round Table Process,
these groups commit to Lao PDR's development efforts in the areas of their expertise
under the leadership of the Government of Lao PDR. These groups are similarly
known in broader term, Sector-Wide-Approach (SWP) which is implemented by sector
as the SWGs in the case for Laos. It is a program-based operating at the level of an
entire sector through sector strategy as listed in Table 4.1 [58].
These groups were formed in June 2007 by the Ministry of Foreign Affairs at
the Round Table Information Meeting. The Department of International Cooperation
was located in the Ministry of Foreign Affairs which is currently the Committee for
Planning and Investment. It is the overall coordinating agency of the SWGs
mechanism. The current groups are illustrated in Figure 4.2 [104].
The RTM has always been a forum where government could call development
agencies to join and discuss development issues for Laos. The MDGs is another
32
component that is coordinated with in the RTM as well which discusses how the MDGs could be achieved through this high level forum. Since the Paris commitment it has been added in to the work of RTM and coordinated by the
government as one agenda, rather than having a separate operation although they are separate contracts. The MDGs and the Vientiane Declaration are components of the RTM but the differences between the Vientiane Declaration and the RTM is that the RTM acts as forum and it sets out criteria for ODA effectiveness. It is rather difficult processes in practice because it follows the objectives of RTM and donors do not always support the agenda.
Table 4.1: The Round Table Meeting Structure
Sector Working Group
Chairing Ministry and Co-Chairing Development Partner(s)
Health
Ministry of Health Japan WHO
Education
Ministry of Education Australia/Aus AID UNICEF
Infrastructure
Agriculture, Rural Development and Natural Resource Management
Ministry of Communication, Transport, Post and Construction Japan ADB Ministry of Agriculture and Forestry France/ADF Sweden/Sida ADB
Governance
Prime Minister’s Office (PACSA) Sweden/Sida UNDP
Macroeconomic Issues and Private Sector Development
Committee for Planning and Investment World Bank International Monetary Fund
Drug Prevention(Mini-Dublin)
Lao National Commission for Drug Control and Supervision Australia/Aus AID
33
[104]
34
Figure 4.2: RTM with Sectorial Working Groups (SWGs, 2007)
4.6. Critiques
There are many critiques around the Paris Declaration that focus on many
development practitioners, donors as well as recipients themselves. There are
several assumptions that the Declaration is fully designed to support the developed
country’s policy toward said distributions rather beneficiary countries. There has
been criticism that the Declaration is just another agreement that won’t fully support
aid just like the Rome Agreement, rather just another donor driven approach on the
development agenda.
It can be seen that the commitment to “country ownership” relies on donor
alignment with partner governments’ national development strategies. This
alignment is usually the result of highly unequal and donor-directed policy
dialogue, focusing on implementing World Bank/IMF-mandated Poverty Reduction
Strategy Papers (PRSPs). On the other hand the PRSP may be focused on the basis
of development policy that may not directly reflect the MDGs. Perhaps it is not
35
supposed to be looking at minor details of how it should be implemented. This
could be the reason why aid effectiveness effort is not entirely clear when it comes
down to localization at country level. In addition to the term country ownership can
refer to a number of dimensions of the multidimensional relationship of the
domestic party. It can be defined as ‘property of programs, process, plans, or
strategic involving both a ‘domestic party (generally nation state) and foreign party’
(Buiter, 2007 pg. 648). Due to this reason, the most important pillar of the
declaration has been misleading causing conflicting views and interests.
Although agreements or declarations in general are legally binding, they
lead to many delays obtaining the signatures to be committed. Implementation is
more difficult as more funds are needed to mobilize for this new agenda while the
MDGs budget can be short for some countries. It is advised to incorporate the aid
effectiveness agenda into the programs but in practice it is viewed as an
independent or a new program which runs parallels to development programs. The
process is timely and the development community does not fully understand.
The declaration assumes that its reforms in the delivery and management of
aid will improve aid effectiveness in reaching poor people and mobilizing them to
address their rights. Reform of current aid practices is vitally important. However,
the Declaration establishes no commitment to clear targets or mutually accountable
assessments of whether these specific reforms will result in sustained progress in
reducing poverty (The Reality of Aid, 2007). ‘Harmonization’ is another confusing
term in addition to ownership. Eyben (2007) refers to harmonization as a buzz word
in development industry. Donors try to have common programs and procedures, so
that the recipients need to communicate with only one single set of financing
agencies. This leads to a reduction in transaction costs for recipient organizations
because they deal with only a single inter locator, instead of having to report
separately to many different donors. However, while it is an attractive idea, as long
as donors do not recognize and address the issue of power in the aid relationship,
harmonization is likely to be counter-productive in promoting locally initiated
responses to development challenges. The new orthodoxy points out that although
the Paris Declaration has been agreed, donors will still go about behind closed
36
doors to agree what they want to play before going into official coordination
meetings. Harmonization is being practiced in aid-dependent countries that result
donors being a monopolistic supplier. In addition to the national poverty strategy,
behind this donors are still lining up to influence recipients and act on behalf of
representative civil society. Eyben simply summed up that harmonization becomes
a vice to donor’s habits of pretending that poverty is not about politics.
A personal interview from a New Zealand NGO has brought several
additional points of criticism. An interview with Ms. Rae Julian (previously the
Director of Councilor International Development) highlighted several weaknesses of
the Paris Declaration. The Paris Declaration does not take into account the NGO’s
role within the aid effectiveness agenda. This involves taking little or no account of
the role of civil society in promoting aid effectiveness. Their role within sector
groups with donors and larger international agencies are minimal because they offer
smaller resources.
See further outlined more detailed critiques of the five pillars in the Paris
Declaration as follows:
1. Ownership: this is rather confusing term. Rather than just ‘ownership,’
the preference would be to change the principle to “democratic ownership”, which
would mean that development policies and strategies have been planned in a
participatory manner, in full consultation with all sectors. Although PRSPs are
drafted with national priorities, in practice there are still conditional ties applied.
2. Alignment: the support for direct funding to developing countries government
raises concerns that NGO’s role in development would soon be phased out.
3. Harmonization: this is the intention to reduce transaction costs. Once
again there are concerns of civil society having a minimal role when Sector
Working Groups are formed. There could be only donors groups working with
government and leaving out the civil society.
4. Managing for Results: here these are concerns with indicators being too
mechanistic rather than covering the core values and principles underlying aid.
5. Mutual Accountability: many NGOs are not technical organization and
hold contractual relationship in aid spending. There are also in equalities in donor
37
recipient relationships. Strengthening independent institutional monitoring of
donors against clear and enforceable benchmarks for donor performance is
essential.
Yet, despite this criticism the Paris Declaration has had much influence on
improving aid delivery in the health sector and provided lessons learned from the
implementation in human rights, environmental sustainability and gender quality
[41]. The harmonization brings together gender equality and human rights in to the
center of the Paris Declaration. The health sector has an enormous increase in aid
support becoming the major recipient in aid. Before the Paris Declaration, health
sector funds which target assistance on specific diseases or sub-sectors were not
well aligned with government priorities and holistic health systems’ approaches
were insufficiently funded.
Strategy review on effective aid management has been done to provide
lessons and achieve development results. Lessons at the level strategies are [60]: i)
To find the appropriate legal and political foundation that is to obtain the clarity at
the highest political level on the national aim aid program, due to involving multiple
relationships. ii) To manage competing national interests by avoiding short-term
pressures jeopardizing long-term common interest in effective development, such as
trade, political relationships or security. iii) To achieve greater policy coherence for
development by setting clear mandate and establish mechanisms to ensure policies
are assessed for their impact on poor countries. iv) Invest in delivering, measuring
and communicating results of aid-financed activity. v) Identify a leadership and
structure that works, hence countries do not have to follow same localization
structure of the Paris Declaration. vi) Rationalize bilateral aid structures to facilitate
coherent action at country level by dealing with institutional dispersion. vii)
Manage contributions to multilateral institutions and viii) decentralize management
to the field. Lessons concerning management of delivery are: ix) To manage the
scale-up of development aid. x) Maintain a focused approach towards countries and
sectors and xi) Emphasize performance-based management, evaluation and quality
control and lastly xii) Make human resource management priority.
Lao PDR has been dependent on ODA for many years, particularly in public
38
sector development. Since the open door policy on the market oriented economy,
Laos have been influenced by the outside world and development. Large amounts
of ODA have been received by Laos with many development projects now in
operation.
Over the past years, ODA had no coordination mechanism in Laos and
development agencies operated independently using their own guidelines, policies,
and practices. In cases where an agency that would like to have a project in Laos, it
would have to draft a proposal to the DIC office and agreements would be signed
by its representative and the government only then would a project be approved for
operation. There are cases where projects can start its’ operations without agreement
of the MOU being signed. This was because of inefficient and lengthy approval
processes.
Many development institutions would make their own plans and execute
their projects with joint government partnership. The monitoring and evaluations
are done by agencies themselves and reports are submitted to government for filing.
However this has led the development community to be lost in communications and
project duplications. This wasted time and resources which resulted in efficient use
of aid. Although DIC has the mandate to coordinate ODA movements, the
constraints are in internal funding to operate the coordination processes, let alone
the capacity of government officers.
There are incidences where active international development institutions
have brought the development community together to provide awareness of their
activities and share knowledge. Yet, the development industry is too large to control
let alone the issue of agencies’ interests. Aid coordination seemed to be wasting time
and development agencies have their own binding mandates. From personal
experiences, agencies like the UN have poor internal communication amongst
themselves.
For this reason, aid coordination is essential. This part will start with an
overview of how the ODA was implemented before the Paris Declaration, which
has been discussed above. The following section will introduce the current ODA
statistics and introduce the government policy on aid coordination status, followed
39
by the effort of the Lao government to aid coordination agenda. The fourth section
will cover how the aid coordination is done in practice from the field research,
covering aid coordination in practices. The fifth section will examine the SWGs that
is one component to the RTM and introduce the overall structure of the aid
coordination system in Lao PDR. This will document current results of how
coordination is adjusted from SWGs proposed structure for aid systems that need
improvement. Effective aid delivery and coordination are being implemented
through the SWGs. Later, a section on the evolution of current coordination system
and follow by a section on the OECDDAC survey. The international development
agencies section will yield results from the interviews gathered by many expatriates
working in Laos. Lastly, the conclusion section will summarize the current status of
the coordination agenda in Laos.
4.7. Current ODA in Lao P.D.R.
Foreign aid is extremely important to the Lao PDR, financing 87% of the capital expenditure budget and 41% of the Government's total public expenditure in 2005/2006 [19]. The Lao government issued a Decree for ODA distributions (the
Prime Minister's Decree on the Management and Use of ODA No. 1467/MOFA/ DIC, 22 March, 2006). ODA inflows have doubled since 2000. Table 4.2 illustrate show ODA is incorporated in to the national expenditure plan of the Lao
government. These gradual inflows of aid has signaled for aid coordination needs and monitoring. The majority of ODA is grant aid from bilateral donors at 141.09 million US dollars, while international financial institutions offer loans of 126.71
million US dollars, in additions to other donors. ODA loans are short and long term which has obligations to be paid back to loaned institutions. Multilateral donors
offer only grant aid; totaled 42.86 million US dollars. In 2011, the grant aids reached 464 million US Dollars and loan financing was US$177 millions. (see
Table 4.2).
40
Table 4.2: Public Expenditure, Public Investment Program and ODA: 2000 to 2011
US$ Mil.
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
Item
354
Total Expenditure
341
406
330
438
514
682
822
1,133
1220
1668
1886
199
Current expenditure
106
162
138
167
248
362
577
679
805
867
986
155
Capital investment(PIP)
235
245
192
271
266
320
368
455
416
801
900
Of which:
96
- ODA
171
147
93
165
177
278
318
369
273
593
640
59
- Domestic
63
98
99
106
89
42
50
86
142
208
259
44%
PIP/Total expenditure
69%
60%
58%
62%
52%
47%
45%
40%
34%
48%
48%
62%
ODA/PIP (%)
73%
60%
48%
61%
67%
87%
86%
81%
66%
74%
71%
27%
ODA/Total expenditure (%)
50%
36%
28%
38%
34%
41%
39%
33%
22%
36%
34%
Note: Exchange rate conversion 2006 to 2011 = 8000kip/1$; ODA in 2010 and 2011 include borrowing.
Source: [19].
41
There are criticisms of bilateral aid being the most non-transparent form of foreign
aid, let alone tied. The Paris Declaration is the alternative solution to tied aid. Table 4.3
shows commitment for ODA to Laos, the figures are gradually adjusted according to real
disbursed amounts. There are concerns over the promised amount to be delivered to Laos
and the actual dispersed amount, see Table 4.4. Many loan agencies still use conditionality
in the amount of aid to be promised. However, there are certain development agencies that
are complying with the national plans.
Table 4.3: ODA Agreements Signed During Financial Year 2010/2011
US$ Million
Institutions
%
Grants
Loans
Total
Government Contribution Fund 1.732 0.04 0.09 0.39
83.6 63.32 15.77 6.55
58.04 0.00 0.00 0.00
143.37 63.36 15.86 6.94
22.75% 10.05% 2.52% 1.10%
0.00
36.51
0.00
36.51
1. International Financial Institutes 2. Multilateral 2.1. European Union (EU) 2.2. Mekong River Commission (MRC) 3. Non Governmental Organizations (NGOs)
5.79%
4. Bilateral
0.42
267.89
95.82
364.13
2.68
473.64
153.86
630.18
57.78% 100%
0.47%
75.16% 24.42%
100%
Total %
Source: (Committee for Planning and Investment, 2012)
The highly concentrated sector is the transport sector (111.5 million US$),
followed by agriculture and forestry (81.2 million US$), and education and human
resource development at about $US 72.9 million, because of poor road condition and
infrastructure building is essential for potential markets and investments. Meanwhile the
least concentrated sectors are Sports, and post-telecommunication.
Japan has always been Lao’s largest bilateral donor previously, offering aid at $US
130.68 million in 2011. Vietnam and China have been actively supporting the Lao
government on aid. Vietnam was noted as a recipient; however it is the fourth largest
bilateral donor for Laos assisting at $17.10 million in 2011 and China grants was 7.61
million US$ in 2011. Laos has been Vietnam’s market for their goods with competitive
41
42
prices on commodities in comparison to Thailand and China.
Table 4.4: Total ODA Disbursement by Sector, 2010-2011
Unit: Million US$
2010-2011
%
%
2011-2012 (Planned)
Poverty Eradication
37.72
6.01%
35.37
5.75%
Agriculture and Forestry
81.22 12.94%
64.65 10.51%
Industry and Commerce
45.10
7.19%
33.39
5.43%
Energy and Mines
54.53
8.69%
33.09
5.38%
Land Development
1.67
0.27%
2.87
0.47%
Public works and Transportation
111.48 17.77%
156.27 25.39%
Post--Telecommunication
0.06
0.01%
0.02
0.00%
Tourism
4.13
0.66%
2.56
0.42%
72.92 11.62%
65.70 10.68%
Education and Human Resource Development
Health
68.31 10.89%
45.92
7.46%
Labor and Social Welfare
25.51
4.07%
33.50
5.44%
Media and Culture
5.28
0.84%
2.74
0.45%
Gender Equality
2.42
0.39%
2.77
0.45%
Sports
0.07
0.01%
0.07
0.01%
Science and Technology
1.98
0.31%
1.74
0.28%
Unexploded Ordinance Clearance
2.05
0.33%
2.68
0.44%
32.23
5.14%
16.02
2.60%
Natural Resources and Environment Protection
Enterprise Development
2.12
0.34%
0.89
0.14%
Local and regional development
3.23
0.51%
2.27
0.37%
Governance
47.43
7.56%
42.58
6.92%
International and Regional Cooperation
4.37
0.70%
8.14
1.32%
Note: Data for some selected programs only (not all sectors)
42
43
Source: [20]
Table 4.5: Bilateral ODA Disbursement by Source (Country), 2010-2011
Country
Grants (Million US$)
%
130.68
48.78%
Japan
Thailand
9.33%
25.00
Australia
8.18%
21.92
Vietnam
6.38%
17.10
Luxembourg
5.70%
15.28
Switzerland
5.23%
14.00
Korea, Republic
3.57%
9.56
Germany
3.21%
8.61
China
2.84%
7.61
Finland
2.39%
6.40
France
2.32%
6.22
Sweden
1.34%
3.59
Norway
0.72%
1.92
New Zealand
0.00%
0.00
100%
Total
267.89
Source: [20]
It is important to improve aid because the Lao government has presented a range of
priorities in the NGPES, 2006 - 2010. It is intended to guide progress towards the
country’s development goals which takes a considerable amount of resources that the
government is able to mobilize. External assistance is a must both financially and
technically in order to achieve those set goals.
43
44
4.8. Effort of Government of Lao PDR
The government of Laos has given the role for aid coordination to the Department
of International Cooperation placed in the Committee of Investment of Planning which is
equivalent to the Ministry level of delegations. This department has divided into five
different Divisions: UN agencies, Asia and Pacific, Europe and America, International
Financial Institutions and Monitoring Division. Each division manages aid in accordance
to the donor’s geographical locations. The monitoring section has the overall role in
keeping track of all ODA inflows into Laos as well as monitoring the operations and
implementations of aid within Lao PDR.
The Round Table Process (RTP), or the Round Table Meetings (RTM) is a process
led by the Government of Lao PDR in the CPI which the Department of International
Cooperation coordinates the RTP. It receives guidance from the National Steering
Committee which is chaired by the Prime Minister. The RTP in partial supports
financially and technically by the UNDP (The National Round Table Process, 2007).
Although there are unclear policies on how to distribute aid, the government has based
their poverty reductions effort by using foreign aid, and setting the national priorities in
the National Growth and Poverty Eradication Strategy (NGPES). DIC uses tools for
guidance in the ODA coordination system that consists of: Part I the National Growth and
Poverty Eradication Strategy. The NGPES as mentioned earlier acts a strategy paper of the
government for the next 5 years plans with focus in poverty reduction. It became the focal
point of where ODA should be spent and how it can contribute to the overall government
national budgets. It outlined various parts. Part one focuses on the national growth and
poverty eradication strategy. Setting goals and priorities and enabling environment for
growth and development. This includes the role of government and governance issues.
The government focuses on the NGPES’ operational framework of: agriculture and
forestry development, education and health, infrastructure development, just to name a
few. Rural and poor district has been appointed to be focused by using the Thammasat
ways of development; this means the natural way of development without using too many
westernized concepts. Mobilization of resources will come from ODA and government
inputs.
44
45
Part II of NGPES overlooks at poverty assessment in Lao PDR. The NGPES also
assess the poverty situation of Laos in order to make plans to reduce it. Analysis of the
cause and the outcomes and possible effect it may have once development has been
implemented. Part III focuses on the strengthening in the overall environment for
sustainable growth and development. Part IV oversees the national sector plans to
promote sustainable growth and poverty eradication while part V is looking for ways to
mobilize and allocate resources to match with outlined priorities.
The second tool for ODA coordination use is the Data base system or called
ACMS. The monitoring system is managed by Monitoring and Evaluation Division of the
department in the DIC. The system is piloted into line ministries and two major provinces.
Although in theory it is piloted into the provinces, in practice it is still far from being
effective. The information is provided based upon project managers, which are
government officers. The project managers will need to complete two forms of: (a).
Project Work Plan (PWP) and (b) the Project Implementation Report (PIR). These are
developed into what is called the ACMS database system. The two tools for monitoring
information are also drawn from the PIP. PIP is government budget which represent
expenditure programme which ODA’s accumulates on average four-fifths of total national
expenditures. Table 4.1 shows enormous contributions and plays an important role in
relation overall public expenditures and PIP.
UNDP has been providing support in the terms of technical assistance and financial
resources through the RTM project to develop the ACMS database. The information on
(c) Project Information Sheet (PIS) is extracted directly from ODA grant and loan
agreements by the staff of this division. This information is kept in the ACSM database
system which is shared with other departments of General Planning in order to facilitate
the preparation of the Annual Plans and Budgets. Thus monitoring and evaluation on aid
effectiveness consists of total three different instruments mentioned above.
4.9. Coordination in Practice
The Round Table Meeting has mandate to support the Vientiane Declaration which
is a step up towards aid effectiveness effort. Later a Country Action Plan (CAP) was
published for implementation purpose in more practical detail based upon the Vientiane
45
46
Declaration.
RTM in practice is rather more scattered and unorganized. The official structure of
the RTM does not contain other groups that coordinates amongst themselves. They are
informal groups displayed in Figure 4.2. These groups were formed previously to the
structure and do not require to be abolished. It illustrates an informal structure of the
Round Table Meeting that includes SWG and other coordination. The informal groups
consist of (SWGs, 2007):
1. Avian Influenza
2. Public Expenditure Management Strengthening Programme (PEMSP)
3. Poverty Reduction Support Operation (PRSO)
4. Three Sub Groups from the SWG of Agricultural, Rural Development &
Natural Resources Management
5. Mini – Dublin that stems from SWG’s Drug Prevention
6. Others, MDTF (forthcoming)
4.10. Sectorial Working Groups (SWGs)
The SWGs structure was very formal and left out informal groups as mentioned
above. There are still concerns over the SWGs on how well is it working and how can it
be strengthened. The findings and recommendations for the current system are not
meeting the needs of either government or partners. It reflected in very small numbers of
SWGs meetings that have actually taken place over the past 12 months. The line
ministries were dissatisfied with a “blue print” approached, due to the lack of
understanding of the potential benefits of the vigorous SWGs. In addition, to the lack of ad
hoc technical support makes it difficult for Chair Ministries to organize SWGs work.
The recommendations from the Review of the SWGs Mechanism have proposed
the followings:
1. Reinforcement of Ownership of SWGs.
2. Increase the ratio of technical to political level meetings.
3. Integrate other ad hoc groups (informal groups) and to strengthened SWGs
Mechanism.
4. Rights to the eight groups that is the necessity of the SWGs for energy and
46
47
mining. The review of continuous effort to improve SWGs, it continues to recommends.
5. To clarify roles and responsibilities of SWGs. That includes the linkages in the
NGPES and the subgroups that stems from the SWGs. While most sectors still needs
improvement in medium term strategy and its policy. The CAP and ODA tracking still
lack standard reliable data and development of a capacity development framework.
6. The commitment to capacity development is critical to effective SWGs; there are
still evidence of donor driven approach in the development community. Agendas are still
not very well shared and require much secretarial support.
7. Reinforcing linkages between SWGs and the RTP.
The current status of implementation for sector groups are; The Ministry of
Education and Ministry of Transport. They have already planned what they want to do for
the coming years and what they want to do now. The Ministries are leading the
implementation however the problem now is that the donors are not giving up their agenda
and the issues of ownership are yet to be resolved. The donors are still using their usual
ways of aid delivery, which are in line with their own mandates and their own foreign aid
policies. The usual way of aid delivery would be that the donor would approach
government and advise a given period of 4 to 5 years plan and implementation would be
set up and lead the plan. Donors would have full control of the financial role,
administration and offer technical expertise. They would deliver these programs and then
leave these projects behind.
4.11. Evolution of Current Coordination System
The overall structure in Figure 4.3, illustrates the overall system of how aid is being
coordinated in Laos from the government side and from the donor’s initialization. The left
hand side of the figure illustrates at the international level what the donors are doing and
their initiative for countries to be involved. From the high level forum in Rome in 2003 at
a global level and followed by the Luangprabang meeting in February 2005 from the
government effort to coordinate aid. That was left behind by the time the Paris Declaration was announced in March 2nd, 2005. Notice there are no direct linkages to the government
that is displayed on the right hand side of Figure 4.3.
The right hand side of this figure however displays the role of the Lao government
47
48
and the involving entities. As mentioned, the DIC uses three different instruments to
monitor progress and NGPES for guidance to manage aid. The RTM November 2006
works in 3 tiers at the working level after Vientiane Declaration. The working level starts
at:
1. Secretariat – this group has the role in drafting official documents; composed by
UNDP, EC, DIC, CPI, and Ministry of Finance.
2. Task force – this group will technically discuss the draft and propose changes
(amendments) which was the government side, DIC, CPI and 4 ministries including all
Donors in practice Japan, WB, Australia, EC, France.
3. High level forum – meeting at ambassador level, a group started process
endorsing process, and endorse the action plan when it was finalized.
The coordination structure has left out several important issues on the aid
effectiveness agenda. The coordination mechanism has left out the provincial aspect,
because the structure is too centralized. Since most development projects are done in the
provinces, the government does not have a clear plan on how to coordinate aid at
provincial level. This is also for the reason that localization is still new and the system is
not yet entirely in place. There is limited capacity at the provincial level with the local
government officers, funding for training to monitor projects or even managing
development projects is still some distance away.
48
49
GOVERNMENT
Rome High Level Forum February 2003
CPI/Department International Corporations: (UN/Asia Pacific/European & America/Financial Institutions/Monitoring Section)
LuangPrabang Meeting Harmonization & Alignment February 2005
Tools: 1. NGPES 2. DATA BASE SYSTEM (instruments) (a) PWP (b) PIR (c) PIS
Paris Declaration 2nd March 2005
Round Table Meeting Aid Effectiveness Agenda is COORDINATED through the RTM process. UNDP has a mandate to support the government through the processes. 1. The secretariat 2. Task force 3. High level Forum
Vientiane Declaration 29th November 2006 (Instrument 1)
(RTM-Mandate to implement CAP)
Country Action Plan CAP February-May 2007 (Instrument 2)
Sector Working Groups: (SWG) Ministry of Health Ministry of Education Ministry of Agriculture Infrastructure Building Macro-Eco & Private Sector Development Governance Mines Action/UXO Drug Control Other informal groups, etc
Piloted 2 Provinces
OECD DAC Survey (Instrument 3)
Figure 4.3: Aid Coordination in Lao PDR
4.12. OECD DAC Survey
The OECD DAC Survey [64] forms parts of the monitoring tool for overall aid
effectiveness effort of the Paris Declaration. The Ministry of Foreign Affairs has
published a monitoring report that took a survey period of 12 months, October 2005-
September 2006. The purpose of this survey was to monitor aid effectiveness at local level
to reflect the global level on aid effectiveness progresses. This is different from the Lao
government monitoring system. The DIC was previously based in the Ministry of Foreign
Affair (MOFA) for the monitoring period however it was later relocated, and is now
49
50
currently back to the Committee for Planning and Investment (CPI). This caused much
needed information to be missing and results were not too impressive.
During the Survey, many of the respondents expressed their views on the different
questions and the difficulties they were experiencing in answering them. The main
concerns were:
1. Time consuming task: many development partners’ staff at country offices is
limited and specialized teams who were able to commit sufficient time and the survey was
not a priority. Furthermore, there was a lengthy progress in deriving data from
headquarters.
2. Ambiguity of several of the terms used in the survey questions.
3. Absence of data: results gathered from the survey are mostly estimates as many
agencies do not keep data filed. Such as missions to Laos.
4. Many agencies still use their own reporting system. Some partners emphasized
that many records are not very well kept in detail and resulted a rough estimation.
Many recommendations were provided
in order
to acquire good results
preparations for the next OECD DAC monitoring survey. However, because the process
became to be too complex and time consuming for development partners which involves
too many documents. There were many repeating questions to be answered from the
indicators questions of which some were already responded to from the Task Force
documents. There were many terminologies, confusion such as missions, technical
cooperation, country analytic work, etc. Therefore the interpretations became unclear
when translated in to the Lao language. Despite the low priority of the Survey many
indicators (monitoring indicators in the Survey) are used as several benchmarks for the aid
effectiveness Action Plan and will be a primary source to assess the targets. Very few
respondents provided qualitative comments and many did not respond to the Survey. This
would jeopardize the completeness and accuracy of the ODA picture in the country. After
the Paris Declaration, an effort was taken to localize at country level. The Vientiane
Declaration was born and the Country Action Plan was established between February and
March 2007. The odd thing about this was that the OECD DAC was carried out before the
actual process of localizing the Paris Declaration was finished. In addition to this, the
survey took one year to finish compilation, and the actual production of the report was
50
51
submitted in mid 2007.
4.13. International Development Agencies
The following field research interviews were held with numerous international
development agencies namely; UNDP, World Bank, bilateral donor such as Sida, NGO
(SNV), European Commission. The interview questions are drafted around the following
questions (see Appendix 3). 44 questions divided into 7 groups:
Section I: Overview about ODA Coordination System
Section 2: Purpose of Development Partner Coordination Units
Section 3: Roles and Responsibilities of Development Partner Coordination Units
Section 4: Organization of Development Partner Coordination Units
Section 5: Financing
Section 6: Strengths and Accomplishments
Section 7: Challenges
The field research provided a real and practical insight on how the aid effectiveness
agenda is organized in practice. Talking to people who are involved with this agenda
revealed interesting outcomes. Although there were challenges during field work, it was
politically sensitive and timing difficult. There were local festivals which were followed
by the national holiday and the Lao government was hosting FRACAPHONE Summit
which nearly paralyzed most of the activities. The government gave a lot of priority to
large events which triggers the closing of most working offices in Laos. Understanding the
local protocols is essential when working with a very conservative government and
mentalities.
Field research interviews with various international agencies held surprising
results. The interviewees were mostly with large international development organizations
based in Vientiane namely; The World Bank, UNDP and European Commission.
However there were other smaller informal meetings with old colleagues from local
NGOs such as SNV and donor country representatives from Sweden/Sida.
Aid effectiveness is rather a new agenda, as coordination of aid confuses the
development community. From what has been gathered during interviews with expatriates
51
52
working in Lao PDR, the expatriates seem to have a relative understanding of what the
components of aid coordination are, meaning what the government is trying to do. The
issues are not just what the government can do to coordinate aid, but what can
international development communities do to support those efforts. Although there are
already examples of combined effort and projects, the progress seems too slow and there
are always continuous concerns of whether the Lao government could meet several
deadlines that they signed up for, hence the MDGs and the Paris Declarations.
It is not just the matter of local government capacity, although UNDP has been
technically supporting the strengthening capacity of the Lao government. The problems
are also the international competency of international expertise. Most of the interviewees
were young expatriates who have direct delegations from the seniors or from their
headquarters. The EU representative explained that he agrees with the local government
and support government coordination effort. However, the field staffs still have to consult
with the headquarters let alone their policy for aid delivery for Lao PDR. They have to
work within guidelines that are sometimes not flexible and causes for process to slow
down. In December 2007, the EU held a workshop on aid effectiveness, a prospective
approach facilitated by a so called expert from the head quarter. A suggestion for the Lao
government to consider changing from the current system as the EU felt strongly that they
are proposing a better approach. This matter was later raised by other interviewees that it
caused so much more confusion. There is already big gap between the headquarters and
the field offices.
The EU representative later provided additional explanation of the workshop that it
wanted Laos to have additional forum so that development community can come together
to discuss, a more practical approach to aid coordination. Now a plan encouraging for
capacity development and have been trying to support forum meetings. The next step is to
expedite aid effectiveness project where there should be a forum where development
community can actually talk about actions plans and monitor and sharing what has been
done, who is doing what? Which targets could be achieved? What are good actions and
target? Currently there is no follow up and monitoring. The workshop eventually had little
value of importance and the government proceeded with the same plan. The WB
expressed their concerns for development agencies to not confuse the government more
52
53
with the system because it is already a difficult process.
The EU interviewee further added that the aid effectiveness agenda has always
been viewed as separate program rather than incorporating within the program systems.
Moving from small projects to general budget supports funding directly to government
budget and involve into bigger sector working group has always been challenging.
The UN agency was rather different from the other interviews simply because of
their organizations operations is much larger and more complex. Due to large
organizational existence, UN agencies particularly have to coordinate within themselves
lead by the UNDP. The interviewee expressed her concerns over task allocations. There
seems to be too many rotations on jobs. From her position, there was a constant hand over
of jobs which handle the aid coordination support. This action has caused delays for new
staff to understand the entire picture of aid coordination in Laos for effective support
needed from DIC. This is one of the classic examples of poor decision making from
technical agencies.
The interviewees agreed that there are unclear approaches from the government in
having multiple meetings. This could be made easier if there is a centralized forum and
address issues once. This is to eliminate the separate discussions with different agencies
and donors and it will lower transaction cost for everyone. Interviewees further expressed
that the requirements to improve aid delivery starts from having more government
ownership by stepping down and setting clear priorities. The country budget had been
dependent on aid and experiencing a comfortable situation for partner agencies as well. It
was shown that it is much wiser to move quickly into projects that are multi donor
projects, so that government officers working in these projects could just harmonize by
not having multiple reporting systems to different donors. International development
community should support government requests to clearly indicate in transparent manners
from the unclear priorities. There are changes seen in the donor communities but it can be
seen that donors don’t entirely understand it. Both partners have limited capacity for the
agenda and need to improve on it.
53
54
Figure 4.4: Current Structure of the SWGs and Other Coordination Force (SWGs, 2007)
54
55
CHAPTER 5. POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT
5.1. Projection of Energy Demand in Lao PDR
The projection of energy consumption in the Lao PDR in this section is divided into
three regions: North, Central, and South. The Northern Region consists of Phongsaly,
Luangnamtha, Oudomxay, Bokeo, Luangprabang, Houaphan, Sayaboury, and
Xiengkhuang provinces. The central region consists of Vientiane Province, Vientiane
Capital City, and Borikhamxay Provinces.
The Southern Region consists of
Khammouan, Savannakhet, Salavanh, Xekong, Champasack and Attapeu Provinces.
5.1.1. Northern Region
The projection of Northern Region energy demand is calculated from the previous
energy consumption and projection of residents marginally increases. The non-
residential energy consumption includes the demand for rail road construction, the
operation of rail road after the construction completion, detail demand for mining
industry, and others. It is forecasted that the energy demand will increase by 21.9% per
year, and the peak load of 17.7% a year.
Table 5.1. Northern Region Electricity Demand Forecast
Growth Rate
Description
Unit
2010
2011
2015
2020
(%)
2010-
2010-
2015
2020
Electricity
GWh
246.9 890.1
2,505.2 1,826.6 58.9% 22.2%
demand
(excluding
system loss)
System Loss
GWh
37.1
129.6
322.8
230.2
55
56
%
13.1% 12.7%
11.4%
11.2%
Total Demand
GWh
284.0 1,019.7 2,828.0 2,056.8 58.4% 21.9%
(including
system loss)
Peak load
MW
65.9
188.0
497.5
336.0
48.7% 17.7%
Load Factor
%
49.2% 61.9%
67.3%
69.9%
Figure 5.1. Energy demand in Northern Region
The chart above shows the peak load demand in the northern part of Laos from
2010-2020. The demand for residence constantly increases while the non-residential
electricity demand increases sharply during 2014 and 2016.
5.1.2. Central Region
The forecast of electricity demand in the central region is based on the constant gradual
increases of residence while the non-residence electricity demand is based on the railway
construction, railway operation, steel factory and additional cement factory in Vangvieng.
The detail is shown in the table below.
Table 5.2. Central Region Electricity Demand Forecast
56
57
Description
Unit
2010
2011
2015
2020
Growth Rate
(%)
2010- 2015
2010- 2020
GWh
1,413.9 1,721.2 4,360.0 6,307.5 25.3% 16.1%
Electricity demand (excluding system loss) System Loss
258.4 13.1%
549.5 11.2%
752.9 10%
GWh % GWh
220.8 13.5% 1,634.8 1979.6 4,909.5 7,060.4 24.6% 15.8%
MW %
321.7 58.0%
375.8 60.1%
884.2 63.4%
1,274.9 22.4% 14.8% 63.2%
Total Demand (including system loss) Peak load Load Factor
Figure 5.2. Central Region Electricity Demand Forecast
Residence;
Non-residence;
Total
The table and figure above show the electricity demand peak load in the central
region from between 2010 and 2020. The figure shows that the demand in residences
constantly increases while the non-residence demand increases rapidly from 2012 and
2018. 5.1.3. Southern Region
57
58
The demand forecast for electricity in the southern region is based on the previous
consumption as constantly increases while the non-residence demand refers to the
exploration and mining of aluminum factory of SLACO which needs approximately
900 MW in phase one, 1800 MW in phase two, and subsequently 3600 MW. The
demand is the most influential factor; therefore, the table below presented the demand
forecast in two scenarios: without SLACO and with phase one of SLACO. The result
of the forecast is shown in the table below.
Table 5.3. Southern Region Electricity Demand Forecast (without SLACO)
58
59
Rate
Description
Unit
2010
2011
2015
2020
Growth (%) 2010- 2015
2010- 2020
GWh
887.3
1,034.2 3,208.6 5,380.2 29.3% 19.7%
Electricity demand (excluding system loss) System Loss
493.0 13.3%
736.6 12.0%
185.2 15.2%
GWh % GWh
160.7 15.3% 1,048.0 1,219.4 3,701.5 6,116.8 28.7% 19.3%
Demand Total (including system loss) Peak load Load Factor
MW %
196.2 61.0%
222.6 62.5%
589.4 71.7%
977.5 71.4%
24.6% 17.4%
The table above shows that the demand of electricity in the southern region
increases at an average of 19.3% per year between 2010 and 2020, with the peak load
of approximately 17.4% per year.
Figure 5.3. Electricity demand forecast in southern region (excluding SLACO)
Residence;
Non-residence;
Total
59
60
The chart above shows the peak load of electricity demand in the southern region
from 2010 to 2020, which classifies the residential and non residential demand. The
non-residential demand includes the mining exploration and processing, hydropower
dam construction, and other industrial factories. The result of the forecast shows that
the demand for residence gradually increases while the demand for non-residence
sharply increases between 2014 and 2016, and remain relatively constant afterward.
This scenario excludes the demand of electricity by SLACO.
Table 5.4. Southern Region Electricity Demand Forecast (with SLACO phase one)
Description
Unit
2010
2011
2015
2020
Rate
Growth (%) 2010- 2015
2010- 2020
GWh
887.3
1,034.2 11,388.9 12,191.6 66.6% 30.0%
Electricity demand (excluding system loss) System Loss
1,472.9 10.8%
1,459.7 11.4%
185.2 15.2%
GWh % GWh
160.7 15.3% 1,048.0 1,219.4 12,848.6 13,664.5 65.1% 29.3%
55.0% 25.5%
1,757.3 83.5%
1,894.3 82.3%
196.2 61.0%
222.6 62.5%
MW %
Total Demand (including system loss) Peak load Load Factor The table shows that the demand of electricity in the southern region between 2010
and 2020 has an average growth of 29.2% per year and the peak load demand is
approximately 25.3%.
Figure 5.4. Electricity demand forecast in southern region (including
SLACO)
60
61
Residence;
Non-residence;
Total
The above figure shows the electricity demand in the southern region between
2010 and 2020, which includes the residence and non-residence. The non-residence
covers electricity demand in mining exploration and processing, hydropower
construction, and other industrial factories. The result of the analysis shows that the
residential demand gradually increases while the non-residential demand increases
sharply between 2014 and 2016. 5.1.4. Total Demand for the whole country
The projection of the demand for the whole country covers the result of the projection
in different parts of the country. Due to the analysis of the southern region is divided
into two scenarios, the projection for the total demand is also divided into two
scenarios.
Table 5.5. Whole Country Electricity Demand Forecast (without SLACO phase one) 2010
2011
2020
2015
Unit
Description
Rate
Growth (%) 2010- 2015
2010- 2020
GWh
2,548.1 3,645.5 10,073.7 13,514.3 28.9% 15.7%
Electricity demand (excluding system loss) System Loss
GWh %
418.6 14.1%
573.1 13.6%
1,365.3 11.9%
1,719.7 11.3%
61
62
GWh
2,966.8 4,218.6 11,439.0 15,234.0 28.3% 15.3%
25.5% 14.2%
1,953.0 66.9%
2,588.4 67.2%
583.8 58.0%
786.4 61.2%
MW %
Total Demand (including system loss) Peak load Load Factor The table shows the total electricity demand for the whole country from 2010 to 2020.
The total demand increases at an average of 17.8% per year and the peak load demand
is approximately 16.1% per annum or approximately 200 MW per year.
Figure 5.5. Electricity demand forecast in the whole country (excluding
SLACO)
Residence;
Non-residence;
Total
62
63
Table 5.6. Whole Country Electricity Demand Forecast (including SLACO phase one) Description
2011
2020
2010
2015
Rate
Unit
Growth (%) 2010- 2015
2010- 2020
GWh
2,548.1 3,645.5 18,543.3 20,663.7 48.7% 23.3%
Electricity demand (excluding system loss) System Loss
2,491.7 10.8%
2,359.5 11.3%
573.1 13.6%
GWh % GWh
418.6 14.1% 2,966.8 4,218.6 20,904.7 23,155.4 47.8% 22.8%
40.3% 19.8%
3,173.9 75.2%
3,561.8 74.2%
583.8 58.0%
786.4 61.2%
MW %
Total Demand (including system loss) Peak load Load Factor The above table shows the total demand for electricity from 2010 to 2020. The total
energy demand average increase is approximately 22.6% per year and the peak load
of approximately 19.6% per year or approximately 300 MW per year.
Figure 5.6. Southern Region Electricity Demand Forecast (including SLACO phase one)
Residence;
Total
Non-residence;
63
64
As a country condition of mountainously and rich of water resources, Lao
PDR is having 23,000 MW exploitable hydro power potential. With a quick
development of economic and government policy on attraction of the foreign
investment, those hydropower potential has been step to step developed for both
domestic consumption and export for country income generation. Continue of
economic growth is needed to alleviate poverty and achieve social development
goals but the policy options for achieving this are constrained by the small domestic
economy and limited trade opportunities. Therefore, hydropower projects are a
development opportunity for both local and central of Lao PDR in overall
development. The power policy of Lao government aim to establish a priority
policy of developing the country’s potential energy resources to provide a low cost
source of energy that can meet export and domestic policy objectives and promotion
of sustainable development.
The country now has installed power generation capacity of over 3,000 MW,
of more than 13 hydro power projects or about 6,000 MW are under construction
and more than 6,000 MW are under various stages of development by 2025, it is
expected that export would be 80-85% of developed capacities.
To transmit of those power there are a strategy of domestic and international
grid development where it can be divided into domestic interconnection (connection
of Northern to Southern part of Lao PDR) and regional interconnection (connection
of Lao PDR to neighboring countries for power exporting). The Memorandum Of
Understanding (MOU) was signed for supply of power between Lao and Thailand
are 7,000 MW and 5,000 MW between Lao and Vietnam by 2020.
Electricite Du Laos is a utility state own company that manage the power of
15% equivalent 385 MW, Private companies (IPP, SIPP) have 85% equivalent of
2,159 MW while Independent Power Producer Companies were built and are
operated by private sector joint-venture companies with Electricite Du Laos (EDL)
principally to export power to Thailand have 95.35% or equivalent of 2,059 MW
65
and Nam Lik 1-2 project were built and operated by Chinese SIPP to EDL for
domestic use, have 4,6% or equivalent of 100 MW. In addition, there is 0.05% or
equivalent 1.1 MW shared by Provincial Department of Energy and Mines.
Currently EDL is also import some power for domestic use where the area is close
to Vietnam border as EDL grid could not reached. The power system is provided
through 6 supply are of (1) Northern Supply Area (EDL), (2) Central C1 Supply
Area (EDL), (3) Central C2 Supply Area (EDL), (4) Southern Supply Area (EDL),
(5) Isolated Supplies (EDL/Provinces) and (6) Off-grid electrification
(Provinces/Private).
Lao government promote an investment cooperation of Vietnam investors for
development of hydropower Projects. There are 2 projects are now under
construction by Vietnamese investors and there are 13 projects are under several
stage of development as MOU, PDA. The total capital cost is expected to reach
4,163 Million US Dollars. Several interconnections to Vietnam grid system is also
being planning in northern, middle and southern of Lao PDR to connect to Vietnam
system (about 4 projects).
The investment of the power GOL has been highly appreciated to
Vietnamese Companies and Enterprises to mainly contribute to the Social
Economics Development in Lao PDR. The Investment of Vietnamese plays the
important roles in the infrastructure development as: electricity, access road,
schools ..., it completely changed the social economics in the provinces where the
projects are located. However, financing is the biggest obstacle faced by project
sponsors and so far only 2 projects being constructed.
The power sector in Lao PDR occupies a pivotal place in GOL’s strategy to
advance economic and social development. GOL has established a priority policy
of developing the country’s potential energy resources to provide a low cost source
of energy that can meet export and domestic policy objectives as stated in four
policy priorities below.
66
(i) maintain and expand an affordable, reliable and sustainable electricity supply
in Lao PDR to promote economic and social development;
(ii) Tap the country’s potentials aiming at promoting power generation for
export to provide revenues to meet GOL development objectives with
particular emphases on poverty eradication;
(iii) Ensure accountability and transparency of environmental and social
impacts and thereby achieve sustainable development;
(iv) Enhance and Strengthen the legal and regulatory framework to meet
requirement of international financing; streamline and institutionalize the
Lao power sector; effectively direct and facilitate power sector
development;
5.2. Broad Policy Objectives
GOL policy has given particular priority to development within the power
sector as a means of achieving macroeconomic and social goals. Power sector
policy calls for the development of two types of power projects to meet different
market requirements: Government policy on future power development divides
power generation projects into two types according to their different market
requirements and objectives.
The Government has been following a policy of developing the country's
hydro resources by undertaking smaller and medium projects for the domestic
market and large projects for export of power to neighbouring countries and for
adjacent local demand. The development of hydro resources for export of power to
neighbouring countries has being promoted by seeking private sector participation
in joint-venture IPP projects subject to equity participation by the Lao Government.
Preference is given to power developments, which have limited adverse
environmental impacts on the local population. Government policy on power
development divides power generation projects into two types according to their
different market requirements and objectives.
67
1. Domestic Generation Projects: Their principal purpose is to meet
domestic demand growth but can be brought on ahead of need to earn export
revenue. Domestic projects will range typically between 5 and 100 MW and will
continue to be developed by GOL. Small / Medium Projects (up to about
100 MW): For supplying the domestic market, either by servicing isolated loads or
feeding into the domestic grid systems.
2. Export Generation Projects: These projects will be implemented in Joint
Venture arrangements with IPP groups specifically to meet export commitments but
may also supply local demand in the vicinity of the project. The initial objective of
the IPP program is to implement the projects needed to satisfy international
obligations under the MOUs with Thailand and Viet Nam. An inventory of
additional projects is being developed to provide back-up and to meet additional
export demand anticipated in the medium to long term future. Medium / Large
Projects (greater than about 100 MW): For meeting export requirements and
adjacent local demand.
The Government has encouraged the extension of the national grid focusing
on provincial capitals and rural areas where feasible and development of off-grid
electrification. Overall the objective is to supply 90% of the population by 2020.
Financing and technical support is being provided through technical assistance (see
App 5&6).
Within the electrification program, the Government is considering to use all
appropriate technical and institutional options, including:
• Delivery systems grid extension, mini-grids, and disbursed systems
(Household or small community scale systems);
• Generation technologies-conventional hydro, mini/micro hydro, solar etc. • Institutional providers-public sector, private sector, community-based.
Implementation Models for Rural Electrification. As part of GOL’s
commitment to social and economic development in isolated rural areas, rural
electrification remains a high policy priority. A number of off-grid micro- and
68
mini-hydropower projects are in various stages of planning and implementation and
other forms of renewable off-grid supplies are being investigated. Such off-grid
projects are usually funded by bilateral arrangements with donor countries and
supported by other international organizations. A trial installation of a photo-voltaic
power supply is planned and, if feasible, could open the way for other such
investments.
Electrification is a high GOL priority. Various public and private sector
models for establishing grid extension and off-grid rural electrification schemes
were discussed with general agreement on a number of points, including:
• The economic and social importance of expanding the supply of electricity to
currently un served areas of Lao PDR,
• The need to insulate EDL from negative commercial effects of rural
electrification schemes;
• The potential for the private sector to play a beneficial role in both grid
extension and off-grid rural electrification schemes;
Domestic Energy Supply. With respect to the domestic power sector,
electrification within Lao PDR is among the lowest in Asia, and domestic energy
consumption is growing rapidly at 8% to 10% annually. Accordingly, power sector
policy focuses on the basic aim of making sufficient, reliable and affordable
electricity widely available. Consistent with this, the following objectives currently
influence policy in domestic market power development:
• Expand the EDL customer base through technically and financially
feasible extensions of the grids to incorporate un served population
centers.
• Create and expand industrial opportunities based on the availability of
low cost power.
69
• Augment the generating and transmission assets to satisfy demand
growth in the domestic grid. Domestic generation additions are typically
between 5 and 100 MW.
• Contract with IPP developers for the purchase of the local supply
entitlements (usually 5%) to provide least cost energy for domestic grids.
• Extend rural electrification through grid extension and off-grid supplies
to promote better socio-economic conditions within isolated rural
communities.
• Explore and exploit mutually beneficial power exchanges with
neighbouring countries for least cost supply to border areas.
• Reduce dependence on imported fuels for electricity generation by
substituting indigenous sources of energy.
• Reduce dependence on fossil fuels by promoting, where practicable,
renewable forms of electrical energy (solar, hydro, wind, biomass).
Transmission and Distribution parts:
- Transmission System: 115 kV transmission line is 3,313 km circuit. - Distribution System: 17,090 km circuits of medium distribution lines, and
13,722 km circuits of low voltage distribution lines/
- Substation: 115/22 kV substation is 30 sites. Total installed capacity is 1,044
MVA.
- Distribution transformers 780,188 sets, total installed capacity is 2,256
MVA.
Status of Power System
The status of Lao power sector development is summarized in Figure 5.1.
It is divided into four principal unconnected supply areas, and a number of smaller
supply areas. In addition, off-grid village and household systems provide electricity
to remote and isolated communities. Thus, electrification is provided through the
following six supply areas:
70
• Northern Supply Area (EDL) • Central C1 Supply Area (EDL) • Central C2 Supply Area (EDL) • Southern Supply Area (EDL) • Isolated Supplies (EDL/Provinces) • Off-grid electrification (Provinces/Private)
Northern Supply Area
No HV grid has yet been established in the northern part of Lao PDR. Two
of the main towns, Phongsaly and Luang Nam Tha, now have MV connections to
the Chinese grid. A more permanent solution will be provided by a 115 kV
transmission extension of the C1 grid from Luang Prabang to the three north-eastern
provinces of Oudomxai, Pongsaly and Luang Nam Tha. This line is being financed
by ADB under the second phase of its Power Transmission and Distribution Project
(PTD2) .
Sam Neua (Houphan Province) and Houay Xai (Bokeo Province) are
supplied as isolated supplies (refer (iv) below). Sam Neua are connected to the C1
grid at Xieng Khouang through the construction of a115 kV line under the third
stage of the ADB’s Power Transmission and Distribution Project
(PTD3).Electrification of the north by single circuit line from Luang Prabang . But
also connection to Muang La in Yunnan and Single circuit 115 kV line Xayaboury
– Hongsa – Bokeo (Houayxai) is included.
71
Figure 5.7
72
Central C1 Supply Area
Historically, the load in Lao PDR occurs predominantly in the Central C1
Grid which comprises a 115 kV transmission system connecting Vientiane, Luang
Prabang, Vangvieng, Pakxan, Xieng Khouang and Sayaburi. Single circuit 115 kV
reinforcements from Xayabury to Paklay to Non Hai and Single circuit 115 kV
reinforcements from Tha Lat to Non Hai.
115 kV interconnections link the C1 and EGAT grids at Phontong (Nam
Ngum 1), Thanaleng (Vientiane) and Pakxan. Hydropower generation for the C1
Grid is provided by Nam Ngum 1(150 MW, with Nam Song and Nam Leuk
diversions to augment energy),Nam Leuk (60 MW) and Nam Dong (1 MW).The
Nam Mang 3 hydropower project will contribute a further 35 MW when it is
completed in 2005.
Central C2 Supply Area
The Central C2 area includes two separate networks, eminating from Thakek
(C2.1) and Savannakhet (C2.2), each supplied by 115 kV interconnections with the
EGAT grid. Under successive World Bank projects, i.e. the Provincial Grid
Integration (PGI) and Southern Provinces Rural Electrification (SPRE 1) projects,
these networks are radiating out, electrifying villages and towns in rural areas of
Khammouane, and Savannakhet provinces. SPRE 1 includes about 52 km of 115
kV transmission line.
Reinforcement of domestic grid interconnection with Thailand at 115 kV
using existing river crossing Paksan – Bungkan and Thakhek – Nakhone phanom.
Under the current PPA between EdL and EGAT, EdL imports from Thailand at a
premium on its export price, effectively a transmission charge for wheeling energy
from the Nam Ngum/Nam Leuk plants through the EGAT system to the C2 grids.
Single circuit supply to XePon and nearby gold mine project .Double circuit
115 kV interconnection of the Central I, Central II and Southern grids as follows:
- Paksan – Nakha – Thakhek – Pakbo (Savannakhet)
73
- Champhone – Bangyo (Pakse)
Southern Supply Area
The Southern Grid services areas of Champassak,Saravane,Xekong and
Attapeu. The grid is supplied principally from three sources: from Xeset 1 (45 MW)
and Selabam (5 MW) (both run-of-river), and from imports from EGAT. Xeset 1 is
connected to Pakse and Ubon Ratchathani (Thailand) by a115 kV line and to
Saravane by a 22 kV line. The town of Attapeu (Attapeu Province) has an partial
supply with generation provided by the Houay Ho IPP project. As with the Central
Supply Area, the PGI and SPRE 1 projects have extended the Southern Grid further
into rural areas of Saravane and Champassak and this work will continue under the
new SPRE 2 loan.
Reinforcement of Central II and Southern grids by single circuit lines and
Extension of Southern grid south by single circuit from Banyo (Pakse) to Thakho
Isolated EdL Supplies
EdL is also responsible for the reticulation of electricity in a number of areas
isolated from the main supply grids. Some centers import supplies across
international borders through MV feeders. Sam Neua and Vieng Xai (Houphan
Province) are supplied by 35 MV feeders from Vietnam and Houay Xai (Bokeo
Province) is supplied at 22 kV from Thailand.
Other towns receiving isolated cross border supplies include Xe Pon
(Savannakhet) from Vietnam grid and Mouang Kenthao (Sayabury) from Thailand.
Whole sale import prices for these supplies vary; Thai imports are at the PEA price
for a large industrial customer while imports from EVN are charged at 6 ¢/kWh.
Retail sales in areas supplied from cross border connections are largely to domestic
customers and the EdL domestic tariff is currently below wholesale purchase prices.
The township of Attapeu is supplied partial from the Houay Ho IPP project.
Sometimes EdL is responsible for providing isolated supplies ,more cross border
connections are planned but in the majority of cases it is the relevant provincial,
district or village authority.
74
Off-Grid Supplies
Much of the country lies beyond the economic reach of the EDL’s grids and
off-grid development provides the only prospect of electrification form any isolated
rural communities. The Rural Electrification is responsible for a program of off-grid
electrification at a village and household level using micro- and pico-hydro, diesel
and solar technologies. Subsidy funding is mobilized from GOL and donor sources
and a Rural Electrification Fund to coordinate and channel contributions. A system
of licensing enterprises to provide off-grid services is being introduced.
Approximately 10,000 household installations have been completed or are
planned under this program. This is expected to grow to 150,000 by 2020. 5.3. Power Sector Policy
1. Maintain and expand affordable, reliable and sustainable electricity
supply to promote economic and social development. Electrification Ratio to exceed
90% by 2020;
2. Improve and expand transmission networks to support the
industrialization and modernization policy, and to integrate the power sector in the
ASEAN community through its power exchange programs;
3. Tap the country’s large hydropower potentials with the participation of
private developers;
4. Promotion of Renewable Energy to reach 30% by 2025 with reasonable
feed-in tariff.
5.4. Power Sector Strategy towards 2025
• Access to reliable modern power services: expand supply capacity,
enhance reliability and increase access;
• Explore all options: off-grid, cooperatives, pro-poor financing methods,
affordable life-line rates, sharply targeted subsidies;
• Sustainable Hydropower Development with focus on integrated water
resources management;
• Cross-border trade;
75
• Focus on areas with low access; • Improve affordability by improving supply efficiency & passing
efficiency gains to consumers;
• Access financing to make low-carbon alternatives affordable.
Figure 5.8.
76
Overall Strategy for Domestic Grid Development
At the intended Na Bong 500 kV substation, it is proposed that a 115 kV
substation also be constructed, with 230/115 kV step-down transformers . This
would be connected to the existing 115 kV grid, and will allow the transfer of the
5% of export power allocated from the Nam Ngum 2 and 3 projects to the domestic
grid near to the principal load centre of Vientiane.
The 230 kV double circuit export transmission lines from Nam Theun
Hinboun and Houay Ho Power Stations to Thailand pass close to the provincial
capitals of Thakhek and Pakse respectively. The establishing 230/115 kV
substations for reinforcing the future 115 kV grid is however expensive compared
to purchasing the modest energy requirement back over the 115 kV transmission
lines across the Mekong at both locations.
Similarly, part of the possible 500 kV grid developments for export – such as
the proposed 500 kV line from Savannakhet to Hatsan – could be used for domestic
grid reinforcement, although the substations would be expensive.
Interconnection between Areas
The power balances of the regions during peak based on the modified
generation plan have been considered to determine the requirement for
interconnections between the EdL Areas, this being a major objective of EDL’s
transmission line programme. Central I / Northern grid will be fairly well balanced,
with some export potential towards the end of the period over the period under
review.
Central II is an importer of power from Thailand, and Central I and the
Southern Areas net exporters. Even with the commissioning of Nam Theun 2, the
Central II grid will remain a net importer and the South remains both a net exporter
and the source of system reserves.
On the basis of the potential load flows alone it may be difficult to justify full
115 kV interconnections between the Central I, Central II and Southern grids in the
period up to 2020. However in terms of assuring the availability of reserve
77
generating capacity within the country (neglecting cross border links) the proposed
115 kV lines represent a logical development of the grid.
It should also not be forgotten that there is considerable uncertainty related to
the actual commissioning dates of IPP projects and the availability of their off-
takes. Under these circumstances an interconnected grid could also help mitigate the
effects on the domestic grid of any substantial delays or a north-south bias in the
actual implementation program achieved.
Regional Grid Development (GMS Interconnection )
Power trade among GMS countries has made significant advances in the last
decade or so. In 1990 the only significant international power exchange involved
the export of surplus power from the Nam Ngum 1 project to Thailand. Today, the
numbers of projects and interconnections have increased but, more significantly,
major power trade agreements are now in place committing Lao PDR, Thailand,
Vietnam, Cambodia, China, to exchanges of electricity with one or more of their
neighbors. A regional grid is emerging to facilitate this trade.
In the mid-nineties, the execution of bilateral inter-governmental power
trading agreements between GMS countries heralded an expansion in international
power exchanges within the region. Given the significant complementarities
between the power systems of the region, interest in the concept of system
integration has grown. Member governments have been cooperating in planning the
interconnection of their grids and in exploring regional power market possibilities. • For Lao PDR, the concept holds considerable promise. A regional grid would
provide the infrastructure to receive power from individual export projects and
deliver it to nominated power purchasers in neighboring countries. The length of
dedicated transmission lines would be reduced, boosting the economics of
projects, particularly those in the Se Kong basin.
• The large capital requirements for building the 500 kV system interconnections
are an obstacle. The implementation strategy is based to some degree on
78
coordinating transmission interconnections with the transmission infrastructure
of large export projects.
5.5. Recommendations
First, continue improve and secure of the stability politic climate, social
security because this is a very important to attract of the foreign direct investment.
To make sure that we can overcome this issues we have to increase role of party
leading in management, in the same time we have a open for democracy and
promote right of people and improve of the implementation of the government legal
set in to social and economic. We have to take care and solve all the social issues
particularly to the corruption, unemployment, poverty and labor conflict in all
business units that having foreign direct investment.
Second, improve and maintain the activities that can support of the
investment because development of the socio-economic there is a more need of
open investment into all sectors in higher. Therefore, all of the government agency,
concern sector in Lao PDR will have to contribute to improve and having a new
changing for each side thus this can catch up with the socio-economic development
both in Lao PDR and international, we need to open up a
communication/advertisement system, disseminate of information to investor on the
condition and opportunity of investment in Lao PDR, especially for the investors
that having a potential of financing and experience on the foreign investment aboard
for example: foreign investment company, international financing institute, business
investor group in each country. Improve capacity of the government agency and
sectors concerns that can support stronger on foreign investment, full set of system
and clear all of the obstructed to investment. Exploring of the experiences/lesson
learnt for promotion of the foreign investment in the region.
Third, improve management effectiveness to ODA and foreign direct
investment, make sure all instruction of the government are harmonized and fully
cooperation between central to local government, between ministries and sector
concerns with foreign direct investment, define clearly right, roles and
79
responsibility of all agencies, sector in resolve all issues that receive government
instruction, discussion and consultation between concerned ministry, sector from
central to local authority where the foreign direct investment projects are located
especially a mega projects.
Fourth, improve aid delivery and coordination in Laos. (i) a stronger
program based approach is necessary. This can be done through four criteria that
include responding to government priorities, implementation in partnership with
several donors to be involved and the effort to strengthen the government system
and using the system. (ii) a sector-wide-approach, should be implemented similar to
the program based approach but applied to a concrete sector. There is the example
of the Sectorial Working Groups that is currently ongoing but this is organized at a
Ministry level. For example, the World Bank agency is helping to prepare for its
first SWAP for the Ministry of Communications Transport Post and Construction in
the country. (iii) a direct budget support system is required. This is one component
being implemented which means ODA will go directly into the government budget.
The current example is the development of the Standard Operating Procedures and
Financial Management Manuals which are being prepared so that ODA funding
goes into this system with transparency. (iv) reduce the numbers of agencies
working in one sector to improve coordination of aid in Laos. There are currently
too many agencies involved which results in poor communication and high of
transaction costs. This is one frequently noted feature identified by many agencies
during field interviews. The government also suggests this to be one of the
important concepts to work well with agencies in order to improve important
decision making processes and clear communication between government and
donors.
Regarding the outlining of strategic Energy Development Plan undertook by
EDL takes into account the party’s socio-economic development plan, aiming at
reaching the expected national socio-economic outcome, with the expectation to
move this country away from being least-developed nation, keeping the macro-
economic growth steady with a good paste. Searching and researching for hidden
developmental resources and strengths in a greater detail, considering cooperation
80
with outsiders and taking advantages of all international facilitating factors in the
energy development mission. Layout methodology and measures for
implementation to eventually realized on the party’s strategic plan. All and all is to
supply the energy to the production sectors, businesses, the society and save the
energy up as a development capital through an environmentally friendly manner and
at the same time use natural resources, water and minerals in the most effective and
sustainable way.
The EDL’s energy development plan from now to 2020 is an amplification of
the energy development mission of the Ministry of Energy and Mines. It’s
objective is to expand hydropower production sources (dams), search for and use
other energy sources which are deemed to be friendly to the environment. Focus on
constructing planned transmission lines to meet the need of the people, to tightly
connect the electricity system to smoothen the socio-economic development for its
continuous growth. Keep attracting foreign investment, expedite and speed up the
agreed projects to lay ground for the future. EDL keeps the following policy in
mind:
1. EDL will invest in constructing some power plants 2. Buy energy from independent power producers whose production is for
domestic consumption (SPP/IPP) (d)
3. Buy energy from independent power producers whose production is for
export (IPP) (e)
4. EDL will continue to import energy in cases where tariff is affordable (the
best deal) and continue to exchange energy with neighboring countries.
5.6. Regional Coordination Effort
Apart from individual efforts by countries for aid effectiveness, the three
Mekong countries of Cambodia, Laos and Vietnam also coordinate amongst
themselves. The development triangle joint coordinating committee met for the
second time on 19th February 2008 in Cambodia. The representative Ministers
emphasized the need for development of the triangle area by giving the priority to
81
[63]:
1. Mobilizing internal resources of each country and to attract investment
into the development triangle.
2. Formulating special preferential policies for the development triangle.
3. Simplifying procedures to facilitate the flows of goods and people in the
triangle.
They pushed further to expedite concretization of the master plan for the
development triangle and further move to implement plans which Vietnam has the
coordinating for.
Electricity plays a crucial role in the national socio-economic development
agenda. Therefore, electricity sufficiency is seen to be a condition that smoothen the
socio-economic development. Energy exports have contributed enormously to the
national economy through the influx of foreign currencies.
Secretary committee of the Mekong River Commission (MRC) has estimated
that the possible capability in converting water resources into energy in the entire
country is about 18,000 MW (excluding the potentials from the mainstream
Mekong River) and some of these have been developed for use.
Because Lao PDR is located in the heart of the Greater Mekong Sub-Region,
it plays an important role through its land-linked nature as well as its high voltage
transmission lines development potentials. Therefore, the expansion of transmission
lines with the neighboring countries in the Asian sub-region is essential to develop
these potentials, in both domestic and sub-regional level, faster.
The Lao PDR national strategic plan states that Lao PDR will export
electricity to its neighboring countries such as Thailand, Vietnam and Cambodia:
Independent Power Producers’ (IPP) hydropower development plan for export
energy to Thailand from 2011 to 2020 has installed capacity of about 6,507 MW
and to Vietnam from 2011 to 2020 has total installed capacity of about 4,446 MW.
82
CONCLUSION
For Lao PDR, Official Development Assistance (ODA) is very important
mechanism to promote the potential of investment fund, technology, marketing,
management experiences, take part of job creation, increase of income level,
upgrade of country development level. Therefore, promotion and attraction of ODA
and FDI is become one of priority policy of party and government of Lao PDR.
Promotion of the ODA into Lao for development of important sectors; potential
sectors are essential necessary for current situation, especially for development of
energy sectors because this sector is an major part of country socio-economic
development; it is a necessary of living condition of the people, generate income
from export of surplus power from domestic use to neighboring country, creation
for income from job opportunity for workers. Together with those, it is also a factor
contribute to promote other sector development as well.
The purpose of this research is to find what is “effective aid coordination”
particularly drawing from the case study of Lao PDR and lessons from successful cases
and what possible recommendations for power sector development are. The study
explore extensive literature in aid effectiveness, with an in-depth interview with the
managers, leaders, practitioners etc. Information synthesis is used in to analyze the
data. It is proposed that a solution to the problem of poor delivery of ODA is that the
Lao PDR governement, in general and power sector, in particular must improve its
ODA spending systems and incorporate aid budgets into the national budget and
development plans. It is vital to encourage the Government of Lao PDR to lead their
own development agenda and support development according to local priorities.
The results suggest that it is not just a matter of coordinating aid effectively,
but the aid industry needs the right capacity and people to be involved. Capacity
building is much needed within the recipient national offices as well as many of the
international donor agencies. This would allow the local government to take the
lead and prioritize the commitments signed in the Paris Declaration, the Vientiane
83
Declaration and the Millennium Development Goals.
It is recommended by many practitioners that the number of agencies working
in decision making processes in the aid effectiveness agenda in Lao PDR should be
limited to reduce transaction costs and promote clear communication within the
development community. However different environments such as Timor L’Este,
suggests that civil society should be involved more and that donor agencies should
not take the lead in aid delivery.
The key point to be learnt is that ODA needs to enhance its efficiency through
the best use of limited resources, aligning with national planning, programming,
monitoring and reporting processes, strategic documents, and priorities. There
should be flexibility to establish and abolish donor coordination groups, avoiding
administrative overburden of public administration staff, while attempting to
comply with donor requirements, established systems and procedures for
programming of donor’s funds. The effective use of existing national planning,
monitoring structures, equipped with national leadership and ownership in aid
coordination should be taken into account.
For furthering the power sector, this dissertation suggests 4 solutions for the
Government of Lao PDR including (i) improve and secure of the stability politic
climate, social security; (ii) improve and maintain the activities that can support of
the investment; (iii) improve management effectiveness to ODA and foreign direct
investment; and (iv) improve aid delivery and coordination in Laos. Also, the
dissertation proposes some direct actions toward the neighbours in order to improve
potentials uses.
84
REFERENCES
1. A. McCarty and A.Julian (2009), Thematic study: The developmental
effectiveness of untied aid: evaluation of the implementation of the Paris
Declaration and of the 2001 DAC Recommendation on untying ODA to the LDCs,
Lao PDR country study, 12/2009 2. Abrahamsen, R. (2005). Blair's Africa: The Politics of Securitization and Fear.
Alternatives, 30 (1), 55-80. 3. ADB & UNIFEM. (2005). County Gender Assessment. Dili. 4. Aid Coordination and Aid Effectiveness, ECON Centre for Economic
Analysis, 1999 5. Aid Harmonisation & Alignment. (2003). Harmonization Initiatives. Retrieved
October 3rd, 2007, http://www.aidharmonisation.org/ 6. Aid Harmonization & Alignment. (2006). Joint Progress Toward Enhanced Aid
Effectiveness. Retrieved February 2nd, 2008, http://www.aid harmonization.org/. 7. Alesina, A. and Dollar, D. (2000), Who Gives Foreign Aid to Whom and
Why? Journal of Economic Growth, 5 (1), 33-63. 8. Arne Disch, Aid Coordination and Aid Effectiveness, Evaluation reports
8/1999, Norad 9. Aso, T. (2006). Speech by Minister for Foreign Affairs Taro Aso ODA:
Sympathy is Not Merely for Others' Sake, http://www.mofa.go.jp/ 10. Berthelemy, J.-C. (2005). Bilateral donor's interests vs. recipients'
development motives in aid allocation: do all donors behave the same? Hamburg:
University of Paris 1 Pantheon Sorbonne. 11. Boesen N, Dietvorst D. (2007). SWAps in motion: Sector wide approaches:
from an aid delivery to a sector development perspective. TRAIN DEV.NET. 12. BOND. (2006). Conflict Security, and official Development Assistance
(ODA): Issues for NGO advocacy, http://www.bond.org.uk/
85
13. Brzoska, M. (2008). Extending ODA or Creating a New Reporting Instrument
for Security-related Expenditures for Development? Development Policy Review, 26
(2), 1331-150. 14. Buiter, W. (2007). ‘Country ownership’: aterm whose time has gone.
Development Practice, 17. Pg 4-5. 15. Burnside, C. and Dollar, D. (2000). Aid, Policies, and Growth. American
Economic Review, 90 (4), 847-868. 16. Carlson, Somolekae, van de Walle, Foreign aid in Africa, 2004 17. CGD. Development Commitment (2007). to Index 2007,
http://www.cgdev.org/ 18. CIEM & JICA. (2003). Study on Donor Practice in Vietnam, Grant Aid and
Transaction Costs. Vietnam: JICA. 19. Committee for Planning and Investment (2007). Achievements, Constraints
and Future Direction with in the Implementation of the National Socio-Economic
DevelopmentPlan2006-2010. Vientiane: Committee for Planning and Investment. 20. Committee for Planning and Investment (2012), Lao PDR. 21. Cornell University Law School. (2002). U.S. Code collection.
http://www4.law.cornell.edu/ 22. Cox, A., John Healey, Hoebink, P. and Voipio, T. (2000). European
Development Cooperation and the Poor. London: MacMillan Press. 23. Duffield, M. (2001). Global Governance and the New Wars: The Merging of
Development and Security. London: Zed Books. 24. Dunkly, G.(2007). The Reality of Aid. London: Zed Books. 25. Easterly, W. (2006). The White Man’s Burden. USA: Penguin Books. 26. Embassy of Sweden. (2007). Sida’s comments to there view of SMGs
Mechanism. Vientiane: Sida. 27. Eyben, R. (2007). Harmonization: how is the orchestra conducted?
Development Practice, 17 (4-5.). pg 640-646.
86
28. Gasper, D. (2004). The Ethics of Development. From Econonomism to Human
Development. Edinburgh: Edinburgh University Press. 29. Geib, A. (2006). Making Aid Work. Finance and Development, Volume 43
(4),14- 17. 30. Gommes,R. (2006). Socio-Economic Snapshot. Dili: UNDP. 31. Government of Lao PDR & United Nations Country Team. (2006). United
Nations Common Country Assessment CCA Lao PDR. Vientiane. 32. Government of Lao PDR. (2000). The National Round Table Process.
Retrieved February, 29, 2008, fromhttp://www.rtm.org.la/index.php. 33. Government of Lao PDR. (2003). National Growth and Poverty Eradication
Strategy.Vientiane. 34. Government of Lao PDR. (2007) The National Round Table Process.
Retrieved March 3,2008, from http://www.rtm.org.la/SectorWG.php. 35. Government of Lao PDR. (2007). Foreign Aid Report 2005-2006. Vientiane:
Committee for Planning and Investment. 36. Government of Lao PDR. (2007). Support the Round Table Process.
Vientiane: Ministry of Foreign Affairs. 37. Hall, A. and Midgley, J. (2004). Social Policy for Development. London:
Sage. 38. Hjertholm, P. and White, H. (2000). Foreign aid in historical perspective. In:
Tarp, F. and Hjertholm, P. eds. Foreign Aid and Development: Lessons Learnt and
Directions for the Future. London: Routledge.
(2007). Destinations. Retrieved March3rd 2008, 39. Lonely Planet.
www.lonelyplanet.com/ 40. M 2 Presswire. (2000). Donors pledge support as Vietnam enters the
21stcentury, Dec15.pg 1-3. 41. M2Presswire. (2001). Foreign aid can promo teen during growth and reduce
poverty when countries ‘drive’ their own development strategies ‘çonditionality’
can not replace national commitment tore form process, Mar 28. pg 1-4.
87
42. Manning, R. (2007). Development Co-operation Report 2007. OECD Journal
on Development,9,1,pg.1. 43. Matt Waldman, Aid Effectiveness in Afghanistan, Oxfam International,
Afghanistan, 2008 44. McKay, J. (2004). Re-assesing Development Theory: Modernization and
Beyond. In: Kingsbury, D., Remenyi, J., Mckay, J. and Hunt, J. eds. Key Issues in
Development New York: Palgrave MacMillan. 45. Ministry of Foreign Affairs. (2007). Comments on Pre-Zero Draft Review of
government Sector Working Groups (SWGs) Mechanism. Vientiane: Department of
International Cooperation. 46. Ministry of Planning and Investment (2004) Harmonization, Alignment for
Greater Effectiveness. Hanoi. 47. Ministry of Planning and Investment. (2002). Ministry of Planning and
Investment: Official Development Assistance. Retrieved February 2nd 2008),
http://www.mpi.gov.vn/ 48. Ministry of Planning and Investment. (2005). Hanoi Core Statement on Aid
Effectiveness. 2008, http://www. aid harmonization.org/ 49. Ministry of Planning and Investment. (2005). Update note on Harmonization
and Aid Effectiveness for the Mid-Term consultative Group Meeting 2-3/06/2005.
Hanoi: Ministry of Planning and Investment. 50. Ministry of Planning and Investment. (2006). Development Assistance Data
Base Vietnam: Building Partnership through Information. Hanoi: Ministry of
Planning and Investment. 51. Norad. (2007). Review of Development Cooperation in Timor L’Este, Oslo:
Norad. OECD& World Bank. (2005). Harmonization Alignment, Results, Progress
report on aid Effectiveness. Paris: OECD Publishing. 52. OECD (1998b), United States. Development Co-operation Review,
http://www.oecd.org/ 53. OECD (1999). Japan: Development Co-operation Review. Paris: OECD.
88
54. OECD (2008), Survey on monitoring the Paris Declaration: Making aid more
effective by 2010, OECD 2008 55. OECD. (1996). Key points emerging from the DAC review of development
Challenges and the role of development cooperation in the three Mekong countries
in transition: Laos, Vietnam, and Cambodia: Paris: OECD Publishing. 56. OECD. (2003). DAC-OECD Working Party on Aid effectiveness and Donor
Practices. Retrieved October 3rd, 2007, http://www.aidharmonization. org/ 57. OECD. (2005). Next Steps: Paris Declaration on aid effectiveness, 2007,
http://www.oecd.org/ 58. OECD. (2005). Paris Declaration Aid Effectiveness. Retrieved February 2nd
2008, http://www.oecd.org/ 59. OECD. (2005). The Paris Declaration. Retrieved October 3rd, 2007,
http://www.oecd.org/ 60. OECD. (2006). Harmonizing Donor Practice for Effective Aid Delivery. Paris:
OECD Publishing. 61. OECD. (2006). Operational Indicators of Aid Effectiveness. Retrieved
October 12th, 2007, http://www.oecd. org/ 62. OECD. (2007). Preliminary Findings from the 2006 Base line Survey on
Monitoring the Paris Declaration. The DAC Journal.8.1.pg59-128(3). 63. OECD. (2008). Overview of ODA. Retrieved March, 31 sr, 2008,
http://oda.mpi.gov.vn/ 64. OECDDAC. (2004). Harmonization and Alignment for Greater Aid
in Vietnam Report 2004. Retrieved March 2nd, 2008, Effectiveness
http://www.oecd. org/ 65. OECDDAC. (2007). OECDDAC Survey Monitoring the Paris Declaration on
Aid Effectiveness. Vientiane: OECD Publishing. 66. Otter, M. (2003). Domestic public support for foreign aid: does it matter?
Third World Quarterly, 24 (1), 115-125.
89
67. Paris, R. (2001). Human Security: Paradigm Shift or Hot Air? International
(2005).Vietnam Implemented the Paris declaration on Aid Security, 26 (2), 87-102. 68. PGAE.
Effectiveness. Retrieved March21st, 2008, http://oda.mpi.gov.vn./ 69. Results report 2007: Norwegian aid works – but not well enough, January 2008,
Norad. 70. Rita Abrahamsen, Blair's Africa: The Politics of Securitization and Fear,
Alternatives: Global, Local, Political January 2005 30: 55-80, 71. Robinson, S. and Tarp, F. (2000). Foreign aid and development: Lessons
Learnt and Directions for the Future (In: Tarp, F. and Hjertholm, P. eds. Foreign
Aid and Development. London: Routledge). 72. Roger Riddell, Does Foreign Aid Really Work? Oxford University Press, UK,
2007 73. Rostow, W. (1960). The Stages of Economic Growth: A non-communist
manifesto. London: Cambridge University Press. 74. S.Lister, M.Stevens (1992), Aid Coordination and Management, World Bank 75. Saches, J. (2005). The End of Poverty. USA: Penguin Books. 76. Sachs, J. (2006). Foreign Aid Skeptics Thrive on Pessimism. Retrieved August
5th, 2007, http://www.latime.com.news.opinion.commentary 77. Sachs, W. (1992). The Development Dictionary: A Guide to Knowledge as
Power. London: Zed Books. 78. Sen, A. (1999). Development as Freedom, Oxford: Oxford University Press. 79. Shah, A. (2008). US and Foreign Aid, 27th April, http://www.globalissues.org/ 80. Shaw,J. (2007). UN Coordination in the context of Integrated Mission. Dili:
UN. 81. Socialist Republic of Vietnam. (2001). Decision of The Prime Minister of the
Government on the Issuance of the Regulation on the Management and Utilization
of Aid from International Non-governmental Organization. Hanoi: Ministry of
Planning and Investment.
90
82. Socialist Republic of Vietnam (2005) Hanoi core Statement on Aid
Effectiveness. Hanoi: Ministry of Planning and Investment. 83. Socialist Republic of Vietnam. (2005). DAD Vietnam. Retrieved March31st
2008, http://oda.mpi.gov.vn/dad/. 84. Soudalie Silaphet (2008), Effective aid coordination a case study of Lao
People’s Democratic Republic, 2008. 85. Subramanian, A. (2007). A Farewell to Aims. Wall Street Journal, Aug 22. (Pg
15-17).. 86. Thorbecke, E. (2000). The evolution of the development doctrine and the role
of foreign aid, 1950-2000. (In: Tarp, F. and Hjertholm, P. eds. Foreign Aid and
Development: Lessons Learnt and Directions for the Future. London: Routledge). 87. Travis Harvey (2010), Strengthening Aid Management in Lao PDR,
http://www.developmentgateway.org 88. Truman, H. S. (1949). Inaugural Address. http://www.trumanlibrary.org/ 89. UNDP, ADB, East Timor & World Bank. (2002). Participatory Potential
Assessment. Dili: UNDP. 90. UNDP. (2005). Working together to improve aid effectiveness for supporting
sustainable development in Vietnam. Vietnam: UNDP. 91. UNDP. (2006). Human Development Report: The path out of Poverty,
Integrated Rural Development. Dili: UNDP. 92. United Nations (2004) Millennium Development Goals Report Lao PDR.
Vientiane: UN. 93. United Nations Development Programme & Government of the Socialist
Republic of Vietnam. (2005). Support to the Implementation of a government -
Owned Development Assistance Database (DAD). Hanoi: UNDP. 94. United Nations Development Programme. (1999). ODA and Aid Coordination.
Hanoi: UNDP. 95. United Nations Trust Fund for Human Security. (2005). Guidelines for the
United Nations Trust Fund for Human Security. Dili: UNDP.
91
96. United Nations. (1970). UN General Assembly Resolution 2626.
http://daccessdds.un.org/ 97. United Nations. (2008). Millennium Development Goals. Retrieved January 11th 2008, http://www.un.org/millenniumgoals/. 98. United Nations. (2008). UN Millennium Development Goals. Retrieved January 20th 2008, http://www.un.org/millenniumgoals/. 99. Ursula Grant, Karen Moore, David Hulme and Andrew Shepherd, Very poor,
for a long time, in many ways…:Defining ‘the poorest’ for policymakers, Brooks
World Poverty Institute, UK, December 2008 100. USAID. (2008). About USAID. 27th January, http://www.usaid.gov/ 101. W.W. Rostow, The Stages of Economic Growth: A Non-Communist
Manifesto, Cambridge: Cambridge University Press, 1960. 102. Wæver, O. (1995). Securitization and De-securitization. In: Lipschutz, R. D.
eds. On Security. New York: Columbia University Press. 103. WHO (2009). Review of Coordination Mechanisms for Development
Cooperation in Tajikistan. 104. Wijkström, Filip (1998) “Different Faces of Civil Society,” Stockholm: EFI 105. World Bank. (2006). Progress and Plans on the Aid Effectiveness Agenda in
the Lao-PDR. Vientiane: World Bank. 106. World Bank. (2007). Brief Overview. Retrieved May 19,2008,
http://web.worldbank.org/ 107. World Bank. (2007). Increase Effectiveness of Aid for Better Results.
Vientiane: World Bank. 108. World Bank.(2008).World Bank List of Economies. Retrieved January 21st
2008, http://siteresources.worldbank.org/
92
APPENDIX
Appendix 1
VIENTIANE DECLARATION ON AID EFFECTIVENESS
Introduction
We, the government of the Lao People’s Democratic Republic (the
Government) and the Partners in Development (the Partners), seek to take
appropriate monitorable actions to make aid more effective and assist the country
in achieving the Millennium Development Goals (MDGs) by 2015 and the long-
term development goal of exiting the status of least developed country by 2020
(the2020goal). We recognize that while increased volumes of aid and other
development resource scare devoted to achieving the MDGs, aid effectiveness
also needs to increase significantly to support the efforts to strengthen
governance, improve development performance, and enhance development
outcomes. At this Ninth Round Table Meeting, we seek to localize the "The Paris
Declaration" that emerged at the conclusion of the Second High Level Forum on
Aid Effectiveness held in Paris in March 2005 to fit the circumstances of the Lao
People’s Democratic Republic (Lao PDR).We seek to enhance the impact to aid in
reducing poverty, increasing growth, building the capacity of human resources and
institutions, and accelerating the achievement of the MDG sand the 2020 goal.
Partnership Declarations
The following Partnership Declaration share developed in a spirit of mutual
respect, support and accountability. They reflect the ambitions and structure of the
Paris Declaration and build on the ongoing development efforts and experiences in
the Lao PDR. They represent share recognition between the Government and the
Partners to enhance the effectiveness of aid in the Lao PDR. They will be
93
implemented to the extent possible.
Although this Declaration does not constitute a legally binding instrument, it
represents a shared recognition between the Government and the Partners on
enhancing aid effectiveness in the Lao PDR. The Government and the Partners,
when and where possible, will make available appropriate resources, knowledge and
capacity to implement the Declarations.
1. OWNERSHIP
Government exercises effective leadership over the development policies, strategies
and coordinates development actions
1. The Government leads in developing and implementing its five-year National Socio
Economic Development Plan or NSEDP (2006-2010) through abroad consultative
process that integrates the official development assistance in to main stream
planning.
2. The Government continues to translate the NSEDP in to priorities dandy results-
oriented operational programs in the Public Investment Programs (PIPs) and the
annual plan sand budgets.
3. The Government exercises an effective leadership role in coordinating aid at the
macro and sector all levels though a substantive and on going process of dialogue
with relevant stakeholders in clouding the Partners in development; through such
mechanisms as the Round Table Meeting sand the Sector Working Groups.
4. The Partners will support the leadership of the Government and strengthen the
Government’s capacity to exercise its leadership.
94
2. ALIGNMENT
Partners align with the Government's strategies and use strengthened
Government regulations and procedures
Partners align with Government’s strategies
5. The Partners base their dialogue with and support to the Lao PDR on the NSEDP
and related national and external strategies and plans and periodic reviews of
progress in implementing the strategies.
Government strengthens
Government regulations and procedures with support from Partners, with
Partners increasingly using the strengthened Government regulations and
procedures
6. The Government and the Partners will establish mutually acceptable frameworks
that provide reliable assessments of Government regulations and procedures, their
performance, and work together to strengthen the seas necessary and appropriate.
The Partners seek to adopt harmonized performance assessment frameworks for
Government regulations and procedures so as to avoid presenting the
Government with an excessive number of potentially conflicting targets.
7. The Government will seek to ensure, as appropriate, that the legal framework,
national regulations and procedures, institutions and procedures for managing aid
and other development resources are effective, accountable and transparent
8. The Partners use the regulations and procedures of the Government to the
maximum extent possible, including through integrating project implementation
arrangements in to line ministries. Where use of the country’s regulations and
procedures is not feasible, the Partners seek to establish additional measures
95
acceptable to the Government and the Partners that strengthen the country’s
regulations and procedures.
9. The Partners will seek to avoid creating parallel structures that are not well
integrated with the regular Government regulations and procedures, such as parallel
Project Implementation Units (PIUs) or parallel Project Management Units
(PMUs), for the day-to-day management and implementation of aid- financed
projects and programs.
Government strengthens development capacity with support from Partners
10. The Government will seek to integrate the capacity building objectives in the
NSEDP in to related national and sectoral strategies and plans and work with the
Partners to develop a comprehensive, long-term capacity building program.
11. The Partners will seek to align their analytic and financial support with the
Government’s capacity development objectives, strategies and long-term
capacity building program; make effective use of existing capacities; and coordinate
and harmonize support for capacity development accordingly.
Strengthening financial management
12. The Government will continue to ensure timely reporting on and publication of
budget planning and execution, and take leadership in the financial management
improvement process.
13.The Partners will seek to enhance the predict ability of future aid to the maximum
extent possible through transparent decision making processes, provide
96
indicative commitment soft aid overall multi-year framework (including aid
commitments covering multi-year expenditures of projects)and release aid funds in
a timely and predict table fashion.
14. The Partners will seek to progressively rely on the Government’s financial
management system, once mutually acceptable standards have been attained.
Strengthening national procurement regulations and procedures
15. The Government and the Partners will seek to commit sufficient resources to
support and sustain the improvements and capacity building in public
procurement.
16. The Partners will seek to progressively rely on the Government’s procurement
system, once mutually acceptable standards have been attained.
Strengthening environmental and social assessments
17. With the Partners’ support, the Government will seek to develop specialized
technical and policy capacity for social and environmental impact analysis and
enforcement of legislation.
3. HARMONISATION AND SIMPLIFICATION
Partners’ action share more harmonized, transparent and collectively effective
Partners will seek to implement common arrangements and simplify
procedures
18.The Government and the Partners will seek to jointly conduct and use core
diagnostic reviews (such as Public Expenditure Reviews); carry out other reviews
97
jointly wherever possible (e.g. sector reviews); and systematically share the results
of all reviews undertaken.
19. The Partners will seek to work together to reduce the number of separate and
duplicative missions to the field; and promote joint training to share the lessons
learned.
20. The Partners will seek to rationalize their regulations and procedures by
implementing common arrangements for planning, design, funding, disbursement,
implementing, monitoring, evaluating, and reporting to the Government on the
Partners’ activities and aid flows.
21. The Government and the Partners will seek to explore the feasibility of using
increasingly program-base approaches.
22. The Partners will seek to pursued centralization and delegation of authority to their
country offices to the maximum extent feasible.
Complementarily: more effective division of labor
23. The Government provides its views on the comparative advantages of the Partners
and on the ways to increase Partner complementarily at country and sectoral levels.
24. The Partners will seek to make full use of their respective comparative advantages
at sectoral level by aligning support.
Incentives focal abortive behavior
25. The Government and the Partners will seek to improve their procedures and
98
strengthen incentives– including recruitment, appraisal and training–for their
managers and staff to work towards harmonization, alignment and managing for
results.
4. MANAGING FOR RESULTS
Managing resources and improving decision-making for results
26. The Government and the Partners will seek to work together through a participatory
process to strengthen the Government’s capacities towards results- based
management. They will establish results-oriented reporting and assessment
frameworks that monitor progress on national and sectoral development
strategies and the effectiveness of Partner in puts/support based on agreed key
indicators.
27. The Government will seek to strengthen the linkages between national
development strategies and annual and multi-annual budget processes.
28. The Partners will seek to harmonize their monitoring and reporting requirements,
and - until they can rely more extensively on the Lao PDR’s statistical,
monitoring and evaluation regulations and procedures - work with the
Government to the maximum extent possible on joint formats for periodic reporting.
5. MUTUAL ACCOUNTABILITY
Both Government and Partner share accountable for development results
29. The Government and the Partners will jointly carry out annual reviews on progress
in implementing the commitments on aid effectiveness and improved development
99
out comes through existing and increasingly objective country level mechanisms.
They will seek to formulate appropriate indicators and (indicative) targets on aid
effectiveness.
30. The Government will seek to involve the Partners in formulating and assessing
progress on implementation of the national development plans.
31. The Partners will seek to provide in a timely manner an accurate and
comprehensive information on aid flows and programme intentions to enable the
Government to present budget reports to the National Assembly and citizens, and
coordinate aid more effectively.
6. THE WAY FORWARD
32. The Government and the Partners will seek to work together to define an Action
Plan and associated Indicators to guide the implementation of this Declaration. The
Indicators, reflecting those defined in the Paris Declaration, will be tailored to the
context of the Lao PDR. They will include time-bound targets, as appropriate. The
Indicators will be incorporated in the Action Plan that will also include a frame
work for monitoring progress both on implementation of the Action Plan and the
outcomes. A task force comprising representatives of the Government and the
Partners will prepare the Action Plan and associated Indicators, which will be
reviewed and finalized with the involvement of the stakeholders including all the
Partners. This is targeted to be accomplished by 31 May 2007.
33. We, the Government of the Lao People’s Democratic Republic and the Partners in
Development, hereby confirm our willingness to implement the above Partnership
Declarations and enhance aid effectiveness in the Lao PDR.
100
Signed at this Ninth Round Table Meeting on 29 November 2006, in Vientiane, Lao
People’s Democratic Republic.
*****
The Declaration was signed by the government of the Lao People’s Democratic
Republic and representatives of the following 22 partner countries and
organizations on the occasion of the Ninth Round Table Meeting in Vientiane on 29
November
2006:
1. Australia
2. Austria
3. Belgium
4. China
5. Cuba
6. Finland
7. France
8. Germany
9. Indonesia
10. Japan
11.Luxembourg
12. NewZealand
13. Poland
14. The Republic of Korea
15. Singapore
16. Sweden
17. Switzerland
18. The United States of America
19. The European Commission
20. Asian Development Bank
101
21. World Bank
22.The United Nations
The Declaration has subsequently been signed by Thailand the Philippines.
(Ministry of Foreign Affairs, 2007)
102
Appendix 2 COUNTRYACTIONPLAN
OF THE VIENTIANE DECLARATION ON AID EFFECTIVENESS 2007-2010
Includes Annex1: Implementation, Monitoring, Reporting and Updating Arrangements, Annex 2: Definitions, Annex3: Acronyms
GoLLead
Target
Goal
Action
Baseline 2005/06LaoFY
PerformanceMilestones
VD§
Agency
2010/11 LaoFY
& DPFocalPoint
1.Ownership:GoLexerciseseffectiveleadershipovertheirdevelopmentpolicies,andstrategiesandco-ordinatedevelopmentactions
GoL leads in
Line Ministries
6 sector strategies:
Time table decided by
NSEDPVI:implementation
-Transport
October 2007.
9(sub) sectorplans prepared.
1. (VD 1,2,30)
-Trade(Integrated
with support from SWGs (actioni,ii)
Framework)
i) GoL uses SWGs where appropriate to decide on a timetable for introducing costed sector plans and build consensus around sectoral priorities;
-UXO
Developing and implementing the NSEDP through a broad consultative process that integrates ODA
ii) As per decided time table, develop
3(sub)sector plans developed by end 2008 (Education, Health, and Agriculture).
-PEMSP -AI
103
Goal
Action
Performance Milestones
VD§
Baselin e 2005/06LaoFY
Target 2010/11 Lao FY
Go L Lead Agency & DP Focal Point
Into main stream
Prioritized and costed sector/or sub-
-HIV/AIDS
sector plans;
planning and translates the
Main stream gender concerns in all sector
iii) Sectoral plans main stream crosscutting
plans & related monitoring in place.
Lao NCAW, LWU,UN [UNFPA]
Gender Main streaming Tool is developed/endorsed by GoL’s Line Ministries by
issues, beginning with gender;
(action iii)
2008.
NSEDP in to prioritized and sequenced PIPs, and annual budgets.
iv) Prepare costed Kumban development
47 kumban development plans
plans for each of the 47 poorest districts
37Kumbandevelop mentplans developed but not
CPI,UN [UNDP](action iv)
and incorporate the min to Annual NSEDP;
By end of 2007 all Kumban development plans developed.
incorporated in to the NSEDP and funds mobilized for
implementation.
v) Develop/implement plan to strengthen
Mobilisation of resources by
linked to annual NSED Paid funding sources not identified.
2008.
Budget Law
CPI,(MoF), Japan(actions v, vi, vii)
coordination between ministries, central and local governments in the preparation
implemented by 2010.
of sector plans and the move towards programme based approaches;
New Budget Law Decreeand Instructions prepared and
104
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 Lao FY
GoL Lead Agency & DP Focal Point
Disseminated by 2008.
vi) Develop prioritized and well-costed PIPs, disaggregated by sector where
Rules or guide lines for program
Rules or guide lines for
available;
formulation process are implemented by FY2010.
program formulation process are drafted and approved by FY2008.
vii) Identify domestic resources to finance
MTEF full integration to
PIPs and incorporate in medium term expenditure frame works and annual budgets;
Costed and prioritized PIPs, including 2 sectoral PIPs by
2008(Education,Transport),
CPI,UN [UNDP]
national budget system by 2010.
viii) Remaining financing gaps identified and
Including identification of over-funded and under-
funded.
discussed with DPs through the SWGs where appropriate and RTM.
X% of PIPs are clarified under the
CPI
MTEF pilot by2008. Planned Evaluation findings shared
NSEDPVII
NSEDPVII: formulation
ix) Evaluate the process for formulating the
UN[UNDP WHO (Health)]
Priorities and costings approved
NSEDP;
For comments and adopted 2008.
105
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 Lao FY
GoL Lead Agency & DP Focal Point
x) Develop/implement a consultation plan
By National
Consultation Findings
that facilitates consultation between central policy
Assembly and
Report shared at RTIM
ministries (CPI, MoF, MoFA), Line Ministries, local
2008/2009.
government, private sector, DPs and NGOs;
endorsed by DPs.
xi) Through SWGs where appropriate, identify
diagnostic/analytical work required to formulate the
NSEDP;
Research Plan prepared
by end 2007, and
xii) Undertake costing of recurrent and
capital expenditures drawing on the PIP/ MTEF process;
research conducted by mid 2009.
xiii) Prepare NSEDPVII based on evaluations, analytical work, consultations and other experiences identified above.
i) GoL convenes annual Round Table
Implementation Meetings;
MoFA ,UN [UNDP]
2.(VD 3,7)
ii) GoL leads are view of the Sector Working Groups, and
RTIM held in Nov 2007 SWG Review Report shared and recommendations discussed May2007.
AllSWGs prepare Annual work plans and budgets (where agreed in TORs).
recommendations implemented accordingly. The roles of the SWG in this CAP are considered and decided upon;
8SWG search Meeting only once or twice from March 2006-March 2007, and zero had work plans.
iii) GoL communicates policies and strategies on ODA including VD and ODA Decree 168 to line ministries and local authorities;
GoL exercises Effective leadersh ip role in coordina ting aid at macro and sectoral levels.
iv) ODA regulations and procedures, such as MoUs, are developed and strengthened with support from DPs;
Man date and minimum performance expectations for each SWG decided and roles in implementing CAP confirmed by October 2007. INGO and wider Membership to SWG sis promoted.
All SWGs oversee effective sector dialog that: 1.Builds consensus around clear priorities; 2.Aligns & harmonizes DP support around these priorities ;and 3.Monitors
4SWG work plans incorporating simple Joint Monitoring Indicators (that
106
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 Lao FY
GoL Lead Agency & DP Focal Point
v) GoL identifies specific capacity
All SWGs meet their own standards.
Allows measurement of their Own progress) developed by Nov 2007and progress reported at RTIM 2007
constraints to its leadership of the aid effectiveness agenda at the macro levels and decides with DPs on a program of support to remedy this.
VD and CAP translated in to Lao and distributed to GoL agencies through workshops
i) GoL prepares CDFs in key cross cutting
areas and sectors of NSEDP.
A further 2-3 CDF Finalized by 2010.
3.(VD 4)
PACSA WB,UN [UNDP]
4CDF (Transport, Education, Health and Agriculture) finalized by end 2008.
DPs support Leadership of GoL and strengthen GoL's capacity to exercise leadership.
Transport, Education and Public Health in process of developing CDF.
Line Ministries with support from SWGs, where appropriate.
1. Alignment: Donors base their overall support on partner countries' national development strategies,
institutions and procedures
DPs Align with the GoL's Strategies
1. Through the SWGs, DPs broadly align
CPI,UN [UNDP]
1. (VD 5)
And harmonize their assistance strategies to sector strategies and the NSEDP;
Unfunded parts of the PIP Reduced from X to Y [note: data to be taken from the Ownership sections].
DP policies, Activities and aid flows are aligned with GoL strategies and plans.
72% of ODA is Recorded on national budget (ODA Report2005).
By 2010 all DPs Have broadly aligned their assistance strategies to the NSEDP and sector strategies.
Line Ministries with support from SWGs.
ODA flows are aligned with the prioritized investments contained in sector strategies and PIPs with particular attention to the over-and under-funded sections of the PIP.
85% of ODA is recorded on national budget (Global target:85%).
107
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 LaoFY
GoL Lead Agency & DP Focal Point
GoL Strengthens Regulations and Procedures with support from DPs, which DPs Increasingly Use
i) GoL and DPs carry out a joint review of
DIC, MoFA UN [UNDP]
2.(VD 8,9)
66% of projects use PMUs/PIUs in 2005 (OECD-DAC survey).
Review of current implementation structures and lessons learned by end 2007.
ODA-funded implementation structures in order to a) classify them according to the agreed matrix (refer Definitions), and b) summarise lessons learned in integrating project implementation structures to date;
No new parallel implementation structures created after 2010, unless endorsed by relevant GoL agencies.
Line Ministries with support from SWGs.
DPs do not create structures for implementing ODA-funded projects that are parallel to GoL structures.
MCTPC has no PMUs/PIUs.
ii)SWGs build on lessons learned above to
All SWGs agree on guidance for integrating project implementation functions within their sector by mid 2008.
guide progress towards integrating project implementation functions within their sector and monitor progress towards this.
Education has made progress in reducing parallel project structures.
GoL strengthens development capacity with support from DPs
i) DPs provide technical cooperation and
CPI, PACSA, WB
3.(VD 10,11)
DPs align their technical cooperation behind GoL CDFs.
other capacity building interventions in alignment with GoL developed sector CDFs.
For those sectors with CDF, 50% of new capacity building interventions align with CDFs by mid 2009.
<10% of total capacity building interventions aligned with CDFs (only MCTPC).
50%oftotal capacity development interventions aligned with CDFs.
108
Strengthening Financial Management
Goal
Action
Performance Milestones
Baseline 2005/06 Lao FY
VD§
GoL Lead Agency & DP Focal Point
Target 2010/11 LaoFY
MoF, WB, ADB No functional
Strengthening national PFM systems: i) GoL and DPs jointly review and decide
4.(VD 6,8,12, 14)
classification of the budget currently exists.
Budget classification aligns with IMF-GFS and functional classification of budget implemented.
on acceptable criteria for PFM regulations and procedures;
Revised Chart of Accounts and functional classification system implemented in FY
2008/09 Budget.
ii) GoL strengthens budget execution by
TSA established and centralized treasury structure implemented.
GoL implements reforms to strengthen PFM to enable DPs to increasingly use GoL financial management procedures and systems for their ODA.
More than 2,000 bank accounts operating outside the control of the MoF.
implementing the budgeting law/centralization of treasury; aligning budget execution with plan; and integrating ODA financing and other revenues into the budget;
iii) GoL produces quarterly financial reports on
Budget norms developed for health and education sectors
Consolidation of GoL accounts within a unified TSA structure is able to show consolidated GoL position in real time.
Budget planning is not based on a normative system.
consolidated GoL expenditure, and makes these compatible with GoL financial statistics standards over time;
GoL Financial Information System fully established.
iv) GoL strengthens internal control
Budgeting for health and education sector done based on a system of budget norms.
framework by establishing internal audit functions and associated enforcement mechanisms;
Current reporting is on an annual basis, with the report published more than 5 months after end of fiscal year.
v) GoL strengthens the State Audit
Quality budget execution reports produced for
2008/2009.
Organization so that it can provide independent audit opinions to INTOSAI standards in a timely manner;
New Audit Law is implemented.
Budget Audit s carried out to INTOSAI standards by 2010.
vi) GoL introduces a comprehensive intergovernmental fiscal transfer framework in order to better align policy priorities with the budget.
109
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 LaoFY
GoL Lead Agency & DP Focal Point MoF,WB, ADB
DPs supporting national PFM systems: vii) DPs clarify and share with GoL and other DPs their respective legal and
34% of ODA to the public sector uses GoL PFM systems [OECD-DAC] -45% ODA used Budget
policy regulations for the use of national PFM systems and standards to deliver ODA;
54% of ODA to the public sector uses GoL PFM systems (Global: 33% increase from baseline).
Execution Procedures-30
% ODA used Financial
viii) DPs increasingly align PFM support to
Reporting procedures
GoL priorities;
-28% ODA used State
Audit procedures:
ix) DPs increasingly adopt GoL procedures,
rules and regulations;
33% of total ODA disbursed through PBAs (including direct budget) [OECD-DAC].
x) DPs increase ODA delivered through aid
5% of total ODA disbursed through PBAs (including direct budget) [OECD-DAC].
90% of ODA is untied (desk review DAC Survey).
modalities, such as direct budget support, that best support PBAs and reduce transaction costs;
xi) DPs increase the percentage of untied aid
executed by GoL as encouraged by the
75-80% of ODA is untied (ODA Report 2005).
2001 DAC Recommendation Untying Official Development Assistance to Least Developed Countries.
i) DPs and GoL develop a common format
MoFA,UN [UNDP]
Common format decided by end 2008.
5.(VD 13,31)
for reporting total, sectoral and project level aid flows over a multi-year period, compatible with revised ODA database;
Gap between DPs’ disbursed ODA and amount recorded by GoL as disbursed is
Aid is more Transparent and predictable.
15%.
Gap between DPs’ disbursed ODA and GoL recorded as disbursed is 30% (OECD-DAC survey).
ii) DPs strive to make indicative and
transparent commitments of ODA over annual or multi-year period, in line with Lao Financial Year where possible;
All DPs use common format for either annual or multi-year period.
110
Goal
Action
Performance Milestones
Baseline 2005/06 Lao FY
VD§
Target 2010/11 Lao FY
GoL Lead Agency & DPFocalPoint
iii) DPs aid is predictable and released on
time, where mutually agreed conditions have been met;
iv) DPs work with GoL to strengthen
absorptive capacity of GoL to effectively follow upon/use ODA pledges;
v) GoL to present annual budget reports to
the National Assembly & citizens, which include ODA.
Strengthening National Procurement Regulations and Procedures
MoF,WB
Recommendations from joint review shared with GoL and DPs by 2008.
6.(VD 6,8,15, 16)
i) DPs clarify and share with GoL and other DPs their respective legal and policy regulations for the use of national procurement systems and standards to deliver ODA;
[X%] of public procurements through competitive procedures (PrMO).
ii) GoL and DPs jointly review and decide
[X%] of public procurements through competitive procedures (note: data from PrMO end 2007).
on acceptable criteria on procurement regulations and procedures;
Procurement website developed by end 2007 (PrMO currently in process of developing).
iii) GoL Procurement Manual and Standard
GoL and DPs commit sufficient resources to strengthening procurement regulations and procedures and enhance their efficiency, transparency and utilization.
Bidding Documents are distributed to DPs;
[X%] of public procurements through Standard Bidding Documents (PrMO).
iv) GoL fully implements new procurement
decree;
[X%] of public procurements through Standard Bidding Documents (Note: data from PrMO end 2007).
Procurement Manual and Standard Bidding Documents updated and made publicly accessible by 2008.
v) GoL recruits and trains sufficient number of staff at the PrMO; vi) Systematic collection of procurement
40% of DPs use GoLs procurement procedures (OECD-DAC).
17% of DPs use GoLs procurement procedures (OECD- DAC).
111
Goal
Action
Performance Milestones
Baseline 2005/06 Lao FY
VD§
Target 2010/11 LaoFY
GoLLead Agency & DPFocalPoint
information and monitoring of performance and outcomes (through PrMO);
vii) DPs increasingly adopt GoL procedures,
rules and regulations to manage ODA- related procurement.
Strengthening Environmental and Social Standards for ODA-Funded Projects
Guidelines implemented.
Assessment completed by mid 2008.
7.(VD 17)
STEA, UN [FAO], Sweden / SIDA
i) DPs clarify and share with GoL and other DPs their respective legal and policy regulations for the use of national environmental and social standards in ODA projects and programs;
Revised guidelines / standards drafted and approved by end
Social impact assessments include gender assessment.
ii) Review current guide lines, standards and
2008.
With DP support, GoL develops technical & policy capacity for social, gender & environmental impact analysis & enforcement legislation.
Use of Joint Monitoring indicators
legislation for conducting social (including gender, HIV/AIDS and Employment, etc) and environmental impact analysis for ODA projects, and identify/implement areas that need improvement;
Development of joint monitoring indicators.
iii) Discussion and approval of new
guidelines/monitoring indicators for environmental and social impact analysis;
iv) Strengthen the capacity of relevant GoL
agencies to enforce the above regulations.
Adoption of harmonised environmental and social standards at all levels of government. All applicable ODA projects adhere to social and environmental legislation that is
112
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 LaoFY
GoLLead Agency & DPFocalPoint
monitored and enforced by GoL
3. Harmonisation and Simplification: DPs’Actions are more Harmonized, Transparent and Collectively Effective
EC UN [UNDP]
30% of CAW is joint (OECD/DAC)
66% of CAWis joint.
1.(VD 18)
Consolidated list developed, disaggregated by sector/programme on annual or multi-annual basis.
[global: 66%]
i) Through the SWGs where appropriate, GoL and DPs share list of planned country analytical work; identify priority research gaps and areas for joint country analytical work;
GoL & DPs conduct & use core diagnostic reviews, carryout joint reviews & share results.
ii) GoL and DPs conduct joint analytical
work wherever possible;
[Global: 30% of country analytic work is joint (2004)]
Line Ministries with support from SWGs, where appropriate.
Joint research programme decided for 2 sectors by 2008 (Health, Education).
iii) Mechanisms identified and implemented to share research/review results to DPs, line ministries and provincial GoL (eg. RTM website or global CAW site).
i)
DIC, MoFA, EC
Best practices identified by December2007.
50% of missions are joint.
2.(VD 19,22)
DPs pursue decentralization & delegation of authority to country offices;
550 Missions in 2005/06 (OECD/DAC).
Line Ministries with support from SWGs, where appropriate.
DPs harmonise training and reduce administrative burden of GoL related to the number of duplicative missions.
12% of missions are joint (OECD/DAC).
ii) GoL and DPs decide on, and document coreprinciples/goodpractices regarding missions and training scheduling, including consideration of mission freeperiod(s)(eg.April to June -annual plan formulation);
Harmonised and/or joint mission and training schedules introduced for pilot sectors (Transport, Education&Health) by 2008.
113
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 LaoFY
GoLLead Agency & DPFocalPoint
iii) GoL and DPs (through the SWGs, where appropriate) share their training and mission plans and organize harmonized and/or joint training and missions where applicable;
iv) DPs increasingly share findings from
missions among DPs and GoL (eg.RTM
i) GoL and DPs decide on which DP
PACSA,MoF, EC
Identification of procedures and time table by end 2007.
3.(VD 20,25)
regulations and procedures should use common arrangements and timetable for implementation;
- DSA, salaries;
GoL Guidelines gradually introduced and, where possible, applied to on-going projects/ programmes.
ii) DPs carry out an overall review of above
DSA and salaries of GoL staff on ODA projects harmonized by 2008.
GoL & DPs rationalize regulations, procedures & incentives by implementing common arrangements.
Line Ministries with support from SWGs, where appropriate.
identified current practices and recommend policy/ practice to harmonize DP procedures & incentives;
iii) Common procedures implemented
(beginning in PBA sectors: Transport, Education, and Health).
i) GoL reviews and improves (where
4.(VD 21)
DPs coordinate programs in Health, Education and Transport sectors.
ADB (Transport)& MoF, Line Ministries with support from SWGs.
33% of ODA disbursed to PBAs (including direct budget support).
necessary) national financial systems to channel budget support and pooled funding identified for PBA to relevant sector;
5%ofODA disbursed to PBAs (including direct budget support). (OECD-DAC)
ii) DPs expand use of coordinated approaches
GoL and DPs increase aid effectiveness through coordinated approaches e.g. PBAs.
to programming and resource mobilisation through SWG framework.
114
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
GoLLead Agency &
Target 2010/11 LaoFY
4. Managing For Results: Managing Resources and Improving Decision-Making For Results
i)
1.(26, 28)
Further strengthen the national statistical system by implementing the National Statistics Strategy 2006-10;
CPI, UN [UNDP], Sweden/ SIDA
National Statistical Strategy for 2006- 10 has been completed.
Results Frameworks well advanced by
Develop & implement Master Plan. Statistical needs assessment by end 2007. National and sectoral indicators decided.
2010.
Results orientated frameworks, that both GoL and DPs use, enable monitoring of development results and of
ii) Develop a set of indicators to monitor progress at national and sectoral levels, and decide on surveys/studies to collect data for these indicators and their periodicity;
progress toward aid effectiveness.
iii) Develop, train on and implement results
Lao Info is used by GoL as a monitoring tool for implementation of NSEDP. 2007 MDG Progress Report published.
All DPs use common formats for monitoring and reporting.
orientated frameworks to monitor and evaluate the 1) implementation and 2) impact of the NSEDP and sector programmes, using strengthened national statistical systems and other tools such as the Lao Info database and MDG Report;
iv) DPs work with GoL to prepare joint
ODA Database fully operational, data reliable and transparently available to GoL and DPs by 2010.
formats for periodic reporting and align to above results oriented frame works; v) Review progress of SWGs against their own Joint Monitoring Indicators
Results Frameworks for general NSEDP prepared ands hared by end 2007: Sector Specific Results Frameworks for Transport by end 2007, and for Education and Health by end 2008.
vi) Develop and implement mechanism to
monitor progress against aid- effectiveness commitments set out in CAP;
General simple joint format for monitoring and reporting endorsed by DPs by mid 2008.
115
Goal
Action
Performance Milestones
Baseline 2005/06LaoFY
VD§
Target 2010/11 LaoFY
GoLLead Agency & DPFocalPoint
vii) Continue to participate in the OECD-
DAC Survey;
viii) Revise the ODA Database to provide
transparent and accurate reports on ODA-financed projects and programmes showing financial inputs (commitments
OECD-DAC Country Worksheet April2009. Proposal for revised ODA database shared and endorsed by GoL and DPs by 2008.
& disbursements) and output progress. Information is shared across MoFA, MoF,CPI and line ministries and with DPs.
5. Mutual Accountability: Both GoL and DPs are Accountable for Development Results
i) GoL and DPs report on and assess
First CAP Review Meeting held in October/November
Regular mutual assessments shared.
1.(VD 29)
progress in CAP implementation at CAP Review Meetings, and outcomes of which are presented at RTIM;
Progress over decided commitments on aid effectiveness is assessed.
ii) GoL and DPs undertake independent evaluations/assessments of particular aid-effectiveness issues.
2007 CAP implementation reported at RTIM2007. Identify topics and timetable for evaluations and funding arrangements by end 2007.
DIC, MoFA, UN [UNDP]
(Ministry of Foreign Affairs, 2007
116
APENDIX 3 "QUESTIONS FOR DEEP PERSONAL INTERVIEW": Self Introduction: My Name is Khammany Inthirath; I am now doing my PhD
Dissertation on “Effective Aid Coordination in Lao PDR: Policy Implications for
Power Sector Development”. I would like to have your assistance in answering my
questions.
Section I: Overview about ODA Coordination System
1. What do you know about external assistance coordination for Lao PDR, about ODA
using in Lao PDR?
2. What do you think about/ assess the current situation of external assistance
coordination and ODA using in Lao PDR in general and in power sector in particular?
Do you know any model of effective use of it?
3. Do you know any country in the world where ODA is used effectively most? What
lessons Lao PDR can learn from them?
4. How do you think about power sector development situation? What do you expect
from the sector development in the next ten to fifteen years ahead?
5. What do you suggest for the government of Lao PDR to make the external assistance/
ODA effectively used and to further the power sector?
6. Do you have any other recommendation regarding the mentioned subject? 7. What is the aid effectiveness agenda in Lao PDR? Who are the involving institutions? 8. What is the local effort from international agencies and donor communities for aid
effectiveness in Laos?
9. Does the local development community support the local government in aid
coordination?
Section 2: Purpose of Development Partner Coordination Units 10. What kinds of activities does the donor coordination unit carry out?
Section 3: Roles and Responsibilities of Development Partner Coordination Units 11. Who manages the Development Partner Coordination Units?
117
12. What is the role of the Development Partner Coordination Units? 13. Who makes decisions in the Development Partner Coordination Units?
Section 4: Organization of Development Partner Coordination Units 14. Is the donor coordination unit a standalone unit or is part of a larger unit? 15. What is the name of the department under which the Development Partner
Coordination Units exists?
16. How many coordination units do you have? 17. How many non-governmental organizations (NGOs) are working in the energy sector? 18. How many international NGOs (INGOs) are working in the your sector? 19. How many people work in the Development Partner Coordination Units? 20. Who makes up the Development Partner Coordination Units? 21. How many development partners are active in your institution?
Section 5: Financing 22. How is the Development Partner Coordination Units supported? 23. How are the Development Partners’ Funds channeled through your institution? 24. What type of budget support are the Development Partners providing? 25. What are the contractual arrangements that govern the relationship with the
Development Partners in your institute?
26. How do you make decisions in terms of funds allocation and reallocation? 27. Do you monitor the expenditures by different donors/NGOs? 28. For what kind of donor/NGO projects/activities do you monitor the expenditures? 29. Please specify how you link donor/NGO expenditure monitoring with your donor
coordination?
30. Who pays for the donor coordination unit activities?
Section 6: Strengths and Accomplishments 31. What do you consider to be the strengths of Development Partner Coordination Units? 32. How would you rate the efficiency (time/money/outputs) of the donor coordination
activities?
118
33. How do you monitor the activities that have to be accomplished by different
donors/NGOs?
34. Do you have a comprehensive energy sector plan which comprises most of the
donors/NGOs activities?
35. Does the plan have output and/or outcomes indicators? 36. How did you establish the indicators? 37. Are there certain elements of your donor coordination activities that you would like to
highlight or describe further?
Section 7: Challenges 38. What do you consider to be the weaknesses of the Development Partner Coordination
Units?
39. What do you consider to be the major/important internal challenges for the unit? 40. Do you monitor the flow of funds (incoming) from donors/ NGO activities? 41. Are the funds entering regularly (as scheduled)? 42. Do you know when different donors’ and international and national NGOs’ support
will expire?
43. Do you map the duration and expiration of donors’ and NGOs’ support? 44. How is the Ministry of Energy and Mines planning to respond to the phasing
out/expiration of donors’ and NGOs’ support?
119
APENDIX 4 The List of Interviewees (Full name, capacity, name of organization, Contact number).
1. Prime Mister’s office, National Committee For Business Development 01 People 1. Mr. Phayvanh CHANHDAVONG Deputy Director General Executive Secretary to
the Minister, President of NCBD. Mobile Phone: 8520 55527829. Email:
chandavong@yahoo.com
2. Ministry of Planning and Investment 5 People 1. Dr. Bounthavy SYSOUPHANHTHONG, Vice-Minister of Ministry of Planning and
Investment. Office Tel : 85621 217020
2. Dr. Kikeo, Director General of Ministry of Planning and Investment Office. Office
Tel : 85621 217010
3. Mr. Phesai PHIATHEP, Director General of Planning Department. Office Tel : 85621
217009
4. Mr. Achong LAOMAO, Acting Director General of Investment Promotion
Department. Office Tel : 85621 223002
5. Ms. Sisoumboun AONAVONG, Acting Director General of Internal Corporation
Department. Office Tel : 85621 216755
1 People
3. Ministry of Justice 1. Mr. Vilath PHEWON Director General of Ministry of Justice Office Mobile Phone :
85620 99801552
2 People
4. Ministry of Education and Sport 1. Dr. Saikhong SAINASIN, Vice Dean of National University of Lao Office Tel :
85621 770381
2. Dr. Phosy CHANHMING, Deputy Director Research Office of National University of
Lao. Mobile phone: 85620 23300555. E-mail : phosyc@gmail.com
5. Ministry of Energy and Mines (MEM) 9 People
120
1. Mr Viraphonh VIRAVONG, Vice-Minister of Ministry of Energy and Mines Office
Tel: 85621 413000/454614
2. Dr. Sinava SOUPHANOUVONG, Vice-Minister of Ministry of Energy and Mines
Office Tel: 85621 413000
3. Dr. Bountheung PHENGVONGSA, Director General of Ministry of Energy and
Mines Office. Mobile Phone : 85620 55519338
4. Dr. Daovong PHONKEO, Director General of Power Policy and Planning Department
Mobile Phone : 85620 99801592 E-mail daovongph@yahoo.com
5. Dr. Xayphone BOUNSOU, Vice Minister Assistant, Deputy Manager of Planning
Division. Mobile phone: 85620 22435770. E-mail: xayphone3000@yahoo.co.jp 6. Mr. Saypaseuth PHOMSOUPHA, Director General of Business Department Mobile
phone : 85620 45253940 E-mail: xayphaseuth@deb.gov.la
7. Mr. Sisoukan SAYARATH, Director General of Energy Management Department
Mobile phone :85620 99801583 E-mail: sisoukansayarath@yahoo.com
8. Mr. Hatsady SISOURAYH, Director General of Institute of Renewable Energy
Promotion. Mobile: 85620 55511537 E-mail: hatsady@demem.org
9. Mr. Stuart GLAUBERMAN, Public Relations Advisor (America) to the Department
of Energy Policy and Planning Mobile phone : 85620 28121844
E-mail: stuxb808@gmail.com
1 People
6. World Bank (WB) 1. Mr. Veasna BUN, WB Team Leader for Rural Electrification Phase II Project. Office
Tel : 85621 266200. E-mail : vbun@worldbank.org
2 People
7. International Finance Corporation (IFC) 1. Mr. Almilion CHATZINIKOLAOU ADB Representative to Lao PDR, Office Tel:
85621 266300. Website : www.ifc.org/Mekong
2. Ms. Sisomsouk SAIMOUNKHOUN, Office Administrator of IFC
Mobile Phone: 85620 55518670. E-mail: tsaimoungkhoun@ifc.org
2 People
8. Asian Development Bank (ADB) 1. Mr. Takafumi Kadono, Energy Special Vietnam Resident Mission Position, Office
Tel: +844 39331374. E-mail: tkadono@adb.org
121
2. Mr. Phosay PHOMMACHANH, Project Officer ADB-Lao PDR Mission. Office
Tel: 85621 250444
9 People
9. Electricity of Laos (EDL) 1. Mr. Sisavath THIRAVONG, Managing Director & CEO of Electricity of Laos
Mobile: 85620 55512749 E-mail: sisavth_th@yahoo.com
2. Mr. Thongphet DOUANGNGEUNE, Deputy Managing Director of Electricity of
Laos Mobile: 85620 22223687 E-mail: dthongphet@YAHOO.COM
3. Mr. Bountham SENEPHANSIRI, Deputy Managing Director of Electricity of Laos
Mobile: 85620 55570021 E-mail: bounthamsp@yahoo.com
4. Mr. Vongmany SONEKETSOULINH, Deputy Managing Director of Electricity of
Laos Mobile: 85620 22223799 E-mail: vongmany-s@hotmail.com
5. Mr. Duangsy PHARAYOK, Deputy Managing Director of Electricity of Laos
Mobile: 85620 22333000 E-mail: duangsy@yahoo.com
6. Mr. Komonchanh PHETASA, Manager of Business Department, Mobile Phone :
85620 55555868 E-mail: komon128@hotmail.com
7. Mr. Bounma MANIVONG, Manager of Finance Department Mobile Phone : 85620
555506739 E-mail: bm.mani09@gmail.com
8. Mr. Ken THEPVONGSA, Manager of Transmission Line and Substation Department,
Mobile Phone: 85620 22805666.
9. Mr. Khamsing PHOSARATH, Manager of Technical Department, Mobile Phone:
85620 55530849.
10. EDL Generation Public Company (EDL-GEN) 3 People 1. Mr. BounOum SYVANPHENG, Managing Director & CEO Mobile Phone :
8562022223899 E-mail bounoum_syv@yahoo.com / edlgenhq@edlgen.com.la 2. Ms. Rattana PRATHOUMVAN , Deputy Managing Director, COO Mobile Phone :
(856-20) 96966555 & 22205084 E-mail: lattana2005@yahoo.com /
rettanadmd@edlgen.com.la
3. Mr Dr. Bounsalong SOUTHIDARA, Deputy Managing Director, CFO. Mobile
Phone : (856-20) 96964555 / Office: (856-21) 316140
E-mail : bounsalong@gmail.com / bounsalong@edlgen.com.la 11. Japan International Cooperation Agency (JICA) 2 People
122
1. Mr. Takayuki Niimura, Expert Policy advisor of Department of Energy Policy and
2. Mr. Nobuo HASHIMOTO, Expert Policy advisor of Department of Energy Policy and
Planning. Office Tel : 85621 415038 Email:hashisan2001@yahoo.com.co.jp
Planning. Office Tel : 85621 415038 Email: takayuki.niimura@gmail.com
2 People
12. National IT Promotion Agency (NIPA) from Korea 1. Dr. Dok-Han Kim, Expert Finance of Electricity of Laos. Tel : 85620 96590680
Email: kdh0567@yahoo.com
2. Mr. Tai Dong Lee, Expert Hydropower of Electricity of Laos. Tel: 85620 95329494
Email: tdlee0502@naver.com
123
APPENDIX 5 Energy Development Plan 5.2. Projection of Investment on Northern Region Power Development Sources from
2010-2020
Location (Province)
Capacity (MW)
EDL contribution
No.
Project Names
Phant Factor
Project Period
Completion Year
Project Types
Province
MW
%
Energy/ year GWh p.a.
EDL Loan Mill. US$
Mill. US$
Project Value Mill. US$
11.5
Nam Nhon
Bokeo
55%
2006-10
4.50
BOT
2010
2.4
1
8
Nam Tha 3
Luangnamtha
70%
2010-11
1.50
BOT
2011
1.3
2
Nam Ngum 5
Vientiane
500
48%
2001-11
BOT
200.00
6
3.0%
2011
120
3
38
Nam Long
Luangnamtha
87%
2009-12
BOT
12.90
0.78
6.0%
2012
5
4
30
Nam Sim
Huaphanh
43%
2011-13
19.40
BOT
2013
8
5
15
Nam Ham 2
Sayaboury
34%
2011-13
8.00
BOT
2013
5
6
Nam Khan 2
Luangprabang
126.9
568
51%
2010-14
314.60
298.87
15.73
5.0%
BT
2014
7
96
Nam Boun 2
Phongsaly
73%
2011-14
30.00
27
3
10.0%
BT
2014
15
8
Nam Ngiew
9
63
36%
2010-14
BOT
38.00
2014
20
Xieng Khuang
200
Nam Beng
Oudomxai
67%
2010-14
BOT
65.00
2014
34
10
721
Nam Tha 1
Luangnamtha
168
49%
2009-14
BOT
350.00
2014
11
Luangnamtha
200
1401.6
80%
2011-14
2014
BOT
420.00
12
Viengphoukha (Lignite)
13
Nam Pot
87.6
50%
2010-14
2014
BOT
44.00
20
Nam Chein
390
56%
2010-15
165.00
148.5
16.5
10.0%
BT
2015
80
14
Xieng Khuang Xieng Khuang
Nam Phak
Oudomxai
165
63%
2009-15
BT
43.60
43.56
2015
30
15
Hongsa (Lignite)
Sayaboury
700.8
80%
2008-15
BOT
3,728.00
2015
100
16
Nam Ngiep 2
1170
74%
2010-15
BOT
345.40
2015
180
17
Xieng Khuang
Nam Phak
Luangnamtha
750
66%
2010-15
BOT
208.00
2015
130
18
1100
57%
2010-15
BOT
696.00
Nam Ngum 4
2015
220
19
Xieng Khuang
545.8
Luangprabang
52%
2008-16
BOT
226.00
Nam Ou 2
2016
120
20
417.9
Phongsaly
53%
2008-16
BOT
290.00
Nam Ou 6
2016
90
21
222
Nam Khan 3
Luangprabang
54%
2011-16
BT
117.00
111.15
6
5.1%
2016
47
22
214
Huaphanh
41%
2009-16
2016
BOT
117.00
60
23
Sayaboury
420
80%
2008-19
2017
BOT
2,497.50
60
24
Luangprabang
150
660
50%
2008-17
2017
BOT
2,794.00
25
Nam Xam 1 (Off take) Mekong (Sayaboury, (Off take) Mekong Luangprabang, (Off take)
26 Mekong Pakbeng
Luangprabang
754
57%
2010-20
BOT
2,994.00
2019
150
Phongsaly
1156.3
55%
2011-16
BOT
291.00
Nam Ou 5
2016
240
27
Luangprabang
798.9
57%
2010-18
BOT
256.00
Nam Ou 1
2018
160
28
Luangprabang
709.6
54%
2010-18
BOT
244.00
Nam Ou 3
2018
150
29
Phongsaly
569
56%
2010-18
BOT
251.00
Nam Ou 4
2018
116
30
Phongsaly
915.4
55%
2010-18
BOT
373.00
Nam Ou 7
2018
190
31
Total (2010-2015)
1466
8016
62%
100%
17,144.40
629.1
48
EDL
252
1219
55%
17.20%
670.20
629.1
48
124
IPP(d)
1114
6096
62%
76.00%
2,638.70
IPP(e)
100
701
80%
6.80%
12,420.50
Total (2016-2020)
1533
7383
55%
100%
692
52.8
18,858.80
EDL
47
222
54%
3.10%
692
52.8
737.20
IPP(d)
976
4695
55%
63.70%
2,902.60
IPP(e)
510
2466
55%
33.30%
13,662.60
Total (2010-2020)
2999
15398
59%
100%
36,003.20
1321.1
100.8
EDL
299
1441
55%
10.00%
1,407.30
1321.1
100.8
IPP(d)
2090
10791
59%
69.70%
5,541.30
IPP(e)
610
3167
59%
20.30%
26,083.10
125
Location (Province)
Capacity (MW)
Project Names
No.
Owner
Completion Year
Project Period
Phant Factor
Province
MW
%
5.3. Projection of Investment on Central Region Power Development Sources 2010-2020 EDL Loan Mill. US$
Project Value Project Types Mill. US$
Energy/ year GWh p.a.
EDL contribution Mill. US$
100
1 Nam Lik 1/2
Vientiane
435
50%
2008-10
2010 BOT
150
IPP(d)
615
Vientiane
2218
41%
2006-10
2010 BOT
60
790
IPP(e)
2 Nam Ngum 2 Nam Song (Extension)
3
Vientiane
11
6
28
53%
2008-11
2011 BT
2.3
17% EDL
13.3
1.5
4 Nam Phao
Bolikhamxai
3.3
25%
2008-11
2011 BOT
3.5
IPP(d)
Theunhinboun (Extension)
946
220
5
Bolikhamxai
49%
2008-12
2012 BOT
86.4
17%
IPP(e)
498
316
60
6 Nam Gnuang 8
Bolikhamxai
60%
2009-12
2012 BOT
120
IPP(d)
10
43.8
50%
2010-13
2013 BT
31.37
31.37
7 Nam Sana
Vientiane
EDL
Nam Ngum 1 (Extension)
40
88
25%
2010-14
2014 BT
70
63
7
10% EDL
8
Vientiane
50
9 Nam Mang 1
Bolikhamxai
235
54%
2010-14
2014 BOT
196.6
IPP(d)
60
248.7
47%
2010-14
2014 BOT
10 Nam Lik 1
Vientiane
130
IPP(d)
5
19.7
45%
2010-14
2014 BOT
11 Nam Kan
Vientiane
5.5
IPP(d)
200
45
12 Kengseuaten
Bolikhamxai
51%
2009-15
2015 BT
90
EDL
740
160
13 Nam Bak
Vientiane
53%
2010-15
2015 BOT
260
15.6
IPP(d)
60
14 Nam Phai
Vientiane
280
53%
2010-15
2015 BOT
110.5
IPP(d)
50
250
57%
2008-17
2017 BOT
695
Nam Theun 1 (Off take)
15
Bolikhamxai
IPP(e)
16 Nam Mouan
105
472.1
51%
2010-17
2017 BOT
271.4
IPP(d)
30
17 Nam San 3 (Down)
120
46%
2010-18
2018 BOT
76
IPP(d)
Bolikhamxai Xieng Khuang Vientiane Capital
60
18 Nam Ngum (Down)
300
57%
2010-18
2018 BOT
122
IPP(d)
18
Nam Ngeip 1 (Off take)
19
Bolikhamxai
102
65%
2010-18
2018 BOT
344
IPP(e)
60
20 Nam Phouan
Vientiane
280
53%
2010-19
2019 BOT
115
IPP(d
Total (2010-2015)
1433
5801
46%
100%
181
95.7
4092.2
101
EDL
360
41%
7.1%
181
95.7
204.7
497
IPP(d)
2278
52%
34.7%
1560.5
835
IPP(e)
3164
43%
58.3%
2327
323
Total (2016-2020)
1524
54%
100%
4501.4
199.1
105.3
EDL
225.1
199.1
105.3
IPP(d)
255
1172
52%
78.9%
1716.6
IPP(e)
68
352
59%
21.1%
2559.7
380
201
Total (2010-2020)
1756
7326
48%
100%
8593.6
EDL
101
360
41%
5.8%
380
201
429.8
IPP(d)
752
3450
52%
42.8%
3277.1
IPP(e)
903
3516
44%
51.4%
4886.7
126
APPENDIX 6 Projection of Investment on Power Development Sources from 2010-2020 (Whole Country)
Energy/ year Project Value
EDL Loan
Project Names
Total (2010-2015) EDL IPP(d) IPP(e) Total (2016-2020) EDL IPP(d) IPP(e) Total (2010-2020) EDL IPP(d) IPP(e)
GWh p.a. 20,321 2,693 13,427 4,201 13,636 372 10,168 3,096 33,957 3,065 23,595 7,297
Capacity (MW) MW 3,945 548 2,373 1,024 2,761 103 2,010 648 6,706 650 4,383 1,672
Mill. US$ 25,939.70 1,450.90 6,955.30 16,118.50 28,533.70 1,596.00 7,650.80 17,730.40 54,473.40 3,047.00 14,606.10 33,848.90
Mill. US$ 1,204.2 1,204.2 1,324.6 1,324.6 2,528.8 2,528.8
EDL contribution Mill. US$ 175.7 175.7 193.2 193.2 368.9 368.9
d = domestic e = export IPP = Independent Power Producer EDL = Electricity Due Laos. The table above shows the projection of power development plan between 2010 and
2020. During the period, the target of development plan is to install production facility
with the capacity of 6,706 MW, with energy production of 33,957 GWh per annum. The
total investment cost will be 54,573.4 million US$. Among these, EDL will invest 3
billion US$, while IPP for domestic will invest 14.6 billion US$ and IPP for export will
invest 33.8 billion US$. The EDL plans to borrow 2,528.8 million US$, perhaps through
ODA as low interest loan if possible, or commercial loan. EDL will invest its own fund
of 368.9 million US$ during the period of 2010 and 2020.
127
APPENDIX 7
Detail estimate of energy sector projection
1. Existing Production Facility
Name of Project
Location
Status
Installed Capacity
Investors (Sponsors)
No.
Planned Market
Remarks
Province
(MW)
Equity share
Progress of project
Owner- ships
1
Commercial Operation Date In Operation
1970
Nam Dong (H)
Luangprabang
• EdL (Laos) 100%
Laos
EdL
1
5
Selabam (H)
Champasak
In Operation
1970
• EdL (Laos) 100%
Laos
EdL
2
Nam Ngum 1 (H)
Vientiane
155
In Operation
1971
• EdL (Laos) 100%
Laos/ Thailand
EdL
3
45
Xeset 1 (H)
Saravane
In Operation
1990
• EdL (Laos) 100%
Laos/ Thailand
EdL
4
1.5
Nam Ko (H)
Oudomxay
In Operation
1996
• EdL (Laos) 100%
Laos
EdL
5
• EdL (Laos) 60%
6
Theun-Hinboun (H)
Bolikhamxay
210
In Operation
1998
IPP(e)
Laos/ Thailand
• Nordic 20%
• GMS 20%
• EdL (Laos) 20%
7
Houay Ho (H)
Champasak/ Attapeu
152.1
In Operation
1999
Laos/ Thailand
150MW (Export) and 2.1MW (Domestic)
60
Nam Leuk (H)
Vientiane
In Operation
2000
• EdL (Laos) 100%
Laos/ Thailand
IPP(e) • Suez Energy (Belgium) 60% • HHTC (Thailand) 20% EdL
8
1.2
Nam Ngay (H)
Phongsaly
In Operation
2003
• EdL(Laos) 100%
Laos
EdL
9
40
10
Nam Mang3 (H)
Vientiane
In Operation
2004
• EdL (Laos) 100%
Laos/ Thailand
EdL
76
11
Xeset 2 (H)
Saravane
In Operation
2009
• EdL (Laos) 100%
Laos
EdL
12
Nam Theun 2
Khammuane
1088
In Operation
2009
IPP(e)
Laos/ Thailand
Off take 75 MW (Domestic)
LHSE (Laos) 25%, EDF (France) 35%, EGCO (Thailand) 25%, ITD (Thailand) 15%
13
Nam Lik 1/2
2010
IPP(e)
100
Prov.
• Prov. (Laos) 100%
Laos
Micro-hydro
1.405
In Operation
Prov.
• Prov. (Laos) 100%
Laos
Solar
0.214
In Operation
Prov.
• Prov. (Laos) 100%
Laos
Diesel
0.74
In Operation
Total
1937.2
EdL
384.7
IPP(e)
1550.1
Prov.
2.36
Feasibility Study
Independent Power Producer
(H): Hydropower plant EdL: Electricité du Laos (EdL) IPP: IPP(e): Exporting IPP IPP(d): Domestic IPP
FS: HOA: Head of Agreement MOU: Memorandum of Understanding PDA: Project Development Agreement PPA: Power Purchase Agreement TBD: To Be Determined SIOD: Start Initial Operation Date
128
2. Demand Forecast
Descriptions
2010
2011
2012
2013
2014
2015
Sub-Total
- -
- -
- -
- -
2.3 11.8
13
Northern Area Phongsaly
1
2
Copper Mining 1 at Yot Ou District Copper Mining 2 at Yot Ou District
3
Total Load during Construction of Hydro Power Plants
Sub-Total
- -
- - - -
- - - -
2 12
Bokeo
Dokngiewkham
1
12
Sub-Total
- -
0.2 0.9
53
Luangnamtha
1
10.9 61.8 10.0 56.9
Copper Mining at Houay Mo, Long District Economic Spacial Zone (Boten)
2
3
- - 0.2 1.2 0.2 1.2 15.8 87.6 10.1 57.4 5.0 26.3 0.8 3.9
2.3 11.8 0.2 1.2 0.2 1.2 65.9 350.6 10.2 57.8 8.0 42.0 47.7 250.7
35
0.2 0.9
0.9 4.9
Total Load during Construction of Hydro Power Plants
4
5
Railway station Train running
Sub-Total
52.0 273.3
- -
30
Oudomxai
1
62.0 330.2 10.0 56.9
62.1 330.7 10.1 57.4
67.3 357.9 10.2 57.8
Cement Factory at Thong Na Village, Namo District Copper Mining at Kiew Chep Village-, Namo District
2
11
3
4
5
Iron melting factory, at Phu Phan Village, La District Lead- Zinc Factory at Nam Pheng Village, Namo District Total Load during Construction of Hydro Power Plants
6
- - 52.0 273.3
- - 52.0 273.3
- - 52.0 273.3
5.1 26.8 52.0 273.3
7
Total Load during Construction of Railway Railway station
Sub-Total
- -
18.0 94.6
18.0 94.6
- -
6.0 31.5
52
Xiengkhuang
1
2
3
41
Iron melting factory, at Nator Village, Khoun District Iron melting factory, at Yot Pieng Village, Pek District Total Load during Construction of Hydro Power Plants
Sub-Total
- -
Huaphanh
1
Total Load during Construction of Hydro Power Plants
Sub-Total
- -
38
Luangprabang
1
18.0 94.6 - - - - 46.6 247.6 7.0 39.4
2
Cement factory at Many Village, Nambak District Gold Mining at Phapon Village, Pak Ou District
3
32
Total Load during Construction of Hydro Power Plants
4
- - 39.6 208.1
18.0 94.6 - - - - 47.7 253.6 7.1 39.7 1.0 5.7 - - 39.6 208.1
- - 1.2 6.3 1.2 6.3 47.7 253.9 7.1 40.1 1.0 5.7 - - 39.6 208.1
6.0 31.5 1.2 6.3 1.2 6.3 90.7 479.7 7.2 40.4 1.0 5.7 42.9 225.4 39.6 208.1
5
Total Load during Construction of Railway Railway station
Sub-Total
- -
0.5 2.8
10
- -
- -
0.5 2.8
Sayaboury
1
2
Copper Mining at Pang Kham Village, Paklay District Total Load during Construction of Hydro Power Plants
Total (Northern)
Units (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)
- -
- - 116.8 616.4
- - 138.6 740.2
0.5 2.8 127.5 682.4
0.5 2.8 234.0 1,241.8
390.4 2,127.0
129
Descriptions
Units
2010
2011
2012
2013
2014
2015
2
Central Area
Sub-Total
Vientiane Province
Phubia Gold/copper Mining 1
32.0 210.2 32.0 210.2
59.3 355.0 33.0 216.8
2
Phubia Gold/copper Mining( Hoayxai )
146.6 926.0 43.0 282.5 20.0 131.4
3
Iron melting factory, at Vangvieng District
179.4 1,128.9 43.3 284.8 20.2 132.5 12.0 84.0
4
Iron melting factory, at Namchan Village, Saysomboon District
6
220.8 1,358.0 43.7 287.0 20.3 133.5 12.1 84.7 25.0 142.3 27.3 203.1 50.0 284.7
387.9 2,164.5 44.0 289.3 20.5 134.6 12.2 85.3 25.2 143.4 27.3 203.1 200.0 1,000.0
27.3 203.1 30.0 170.8
27.3 203.1 50.0 284.7
7
8
5 Cement Factory at Vangvieng (Extension) Iron melting factory, at Vangvieng District (sinhouang) Gold/Copper Mining at Maipakphoun Village, Sanakham District Total Load during Construction of Hydro Power Plants
17.0 89.2 25.4 133.5
0.9 4.7 25.4 133.5
0.9 4.7 25.4 133.5
1.2 6.5 25.4 133.5
Total Load during Construction of Railway 9 Railway station
10
(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)
48.8 256.2 - - 10.0 52.6
Sub-Total
- -
10.9 71.2
Vientiane Capital
1
2
3
95.4 354.2 5.1 35.8 80.0 250.0 8.3 57.8
4
8.0 56.0
47.0 203.6 5.0 35.0 31.0 96.9 8.1 56.4
96.1 357.4 5.0 35.3 80.0 250.0 8.1 56.9
96.2 358.2 5.1 35.6 80.0 250.0 8.2 57.4
5
Gold Mining at Khok Pheung Village, Sangthong District Iron melting factory, at Ban Hai Village (Tha Ngon), Xaythany District Kea Potash Factory at Thongmang Village, Saythany District Kea Potash Factory at Nathom Village, Saythany District Total Load during Construction of Hydro Power Plants
- - 2.9 15.2
- - 2.9 15.2
- - 2.9 15.2
- - 2.9 15.2
6 Total Load during Construction of Railway Railway station 7
(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)
- - - - 2.0 10.5
Sub-Total
- -
Bolikhamxai
1
Total Load during Construction of Hydro Power Plants
Total (Central)
(MW) (GWh) (MW) (GWh) (MW) (GWh)
32.0 210.2
0.2 1.3 0.2 1.3 70.4 427.5
9.2 48.6 9.2 48.6 202.8 1,178.1
9.0 47.3 9.0 47.3 284.5 1,533.7
7.5 39.4 7.5 39.4 324.4 1,755.6
14.3 74.9 14.3 74.9 497.6 2,593.6
Descriptions
2010
2011
2012
2013
2014
Sub-Total
17.0 52.0
17.0 52.0
17.0 52.0
17.0 52.0
2015 70 304
Southern Area Khammouane
1
37.0 127.0 20.0 75.0
Potassium at Yang Koung Village (Ngom Ma Lat) Thakhek District
2
Jiaxi Mining at Thakhek District
20.0 75.0 22.0 124.0
3
4
17.0 52.0
17.0 52.0
17.0 52.0
17.0 52.0
17.0 52.0
17.0 52.0
5
Metal Melting Factory at Nong Cheun-Borneng Village, Hinboon District Cement Factory at Nakham Village, Thakhek District (Existing) Cement Factory at Nakham Village, Thakhek District (Extension)
Economic Spacial Zone
6
7
- -
- -
- -
- -
5.0 21.9 6.0 31.5
Units (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)
Total Load during Construction of Hydro Power Plants
Sub-Total
93 605
Savannakhet
43.0 317.6 43.0 317.6
44.0 323.8 43.5 321.2
1 Xepon Gold/Copper Mining at Vilabury District Economic Spacial Zone (Nongdeun) 2
43.5 321.2 50.0 284.7
3
Total Load during Construction of Hydro Power Plants
- - - -
Saravan Champasak
Sub-Total
- -
0.5 2.5 12.6 - 71.7 - 12.6 71.7 - - - -
93.5 605.9 43.5 321.2 50.0 284.7 - - 13.4 63.5 75.6 428.0 12.6 30.0 71.7 223.4 0.8 8.0 3.9 30.7 22.8 20.0 119.8 145.0
54.0 380.7 43.5 321.2 10.0 56.9 0.5 2.5 12.6 35.5 71.7 175.7 12.6 7.5 71.7 - 8.0 - 30.7 - 20.0 - 145.0
73.5 492.1 43.5 321.2 30.0 170.8 - - 12.6 47.7 71.7 312.4 12.6 15.0 71.7 111.7 - 8.0 - 30.7 9.6 20.0 50.5 145.0
Sekong
2 5
28. 142 154 991 12.6 100.0 71.7 744.6 15.8 8.0 82.8 30.7 58. 20.0 305 145.0 5.0 21.9 58.2 9.5 305.9 49.7
9.6 4.7 50.5 25.0
22.8 5.5 119.8 28.9
- - - -
- - - -
(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (MW) (GWh) (GWh) (MW) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (GWh)
Sub-Total Sub-Total Cement Factory at Ta Leo Village, Saravane District 1 Aluminium at Paksong District(SLACO)for the 1 entire mine Total Load during Construction of Hydro Power 2 Aluminium at Paksong District(SINOMA) for the Plants 2 entire mine Aluminium at Paksong District(SINOMA) for 3 Alumina refinery Aluminium at Daklan Village, Dakjung District 1 Economic Spacial Zone (Bolaven plateau) 4 Total Load during Construction of Hydro Power Total Load during Construction of Hydro Power Plants Plants
130
Sub-Total
- -
3.8 19.7
3.8 19.7
- -
- -
Attapeu
1
2
3
- - - -
Gold/Copper Mining at Vangtun Village, Xanxai District Aluminium at Paksong District(SLACO) for Alumina refinery Total Load during Construction of Hydro Power Plants
Total (Southern)
Whole Country
3.8 19.7 77.3 467.2 264.6 1,511.2
3.8 19.7 122.8 699.8 464.2 2,618.2
60.0 369.6 92.0 579.8
- - 160.4 978.6 572.5 3,194.7
230.1 1,356.4 788.5 4,353.8
392 2,362 1,280.5 7,083.2
(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)
131
LIST OF AUTHOR’S PUBLICATIONS
1.
Khammany INTHIRATH, Power sector status of Lao PDR and Lao–Vietnam
cooperation on power project development, Lao-Vietnam international Economic
2.
Seminar In Vietiane Capital 26/10/2012, Book III, Pages 104.
Khammany INTHIRATH, Promotion of Foreign Direct Investments for the
development of Energy sector in Lao PDR, Lao Magazine ALOUNMAI, Date
3.
October 2011, Page 53.
Khammany Inthirath, Investments in Hydropower Development in Lao PDR,
Scientific Seminar Lao PDR – SR of Vietnam, Vientiane Capital, Lao PDR, 2011,
Book II, Pages 53