MINISTRY OF EDUCATION

MINISTRY OF EDUCATION AND TRAINING

LAO NATIONALUNIVERSITY

NATIONAL ECONOMICS UNIVERSITY

Khammany INTHIRATH Khammany INTHIRATH Khammany INTHIRATH Khammany INTHIRATH

EFFECTIVE AID COORDINATION IN LAO PDR:

POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT

Specialty : Investment Economics (Development Economics)

Code : 62.31.05.01 Supervisor: Assoc.Prof.Dr. Nguyen Thanh Ha

A dissertation submitted to the National Economics University in

fulfillment of requirements for the Degree of

Doctor of Philosophy in Economics

Vientiane, 2013

ii

DECLARATION I hereby declare that this dissertation is my own work and effort. The dissertation has not been submitted anywhere for any award. All the sources of information used

have been well acknowledged.

Date:

Signature:

Khammany INTHIRATH

iii

ACKNOWLEDGMENT

I would like to sincerely thank many people whom provided much support into

producing this thesis and paving the way for the research topic to be one of the

significant findings. I wish to express my profound gratitude to my supervisor

Associate Professor Dr. NGUYEN Thanh Ha, National Economics University

(Vietnam), for his great support and guidance throughout my study. His

encouragement and constant attention contributed significantly to the outcome of

this research.

I am grateful to my sponsors such as the Ministry of Energy and Mining and

the National University of Laos in enabling me to achieve a higher education at

National Economics University, Vietnam.

Many thanks to all interviewees whom shared knowledge and ideas. My

sincere thanks out to the Lao Government officers from the Government Office,

Ministry of Energy and Mines, H.E Mr. Soulivong DARAVONG, Minister of

Energy and Mines, etc and many other officers whom were involved in my research.

The European Commission Lao PDR Office international staff, the World Bank

residential office and United Nations Development Programme staff who are

involved in the aid effectiveness agenda in Laos and friends from development

communities were all of assistance in this reseach.

Last but not least, many thanks are due to my wife and my family who

provided me endless love with support and strength through out of my life.

iv

TABLE OF CONTENTS

DECLARATION...................................................................................................... ii

ACKNOWLEDGMENT......................................................................................... iii

TABLE OF CONTENTS........................................................................................ iv

ABBREVIATION ................................................................................................... vi

ABSTRACT .................................................................Error! Bookmark not defined.

RATIONALE........................................................................................................... xi

CHAPTER 1. LITERATURE REVIEW ................................................................1

CHAPTER 2. THEORETICAL FRAMEWORK ON ODA COORDINATION EFFECTIVENESS ....................................................................................................6

2.1. Development Theory..........................................................................................6

2.2. Development Aid ................................................................................................7

2.2.1. Donor Motives ..................................................................................................7

2.2.2. Defining Official Development Assistance (ODA) ..........................................9

2.3. Aid coordination and its effectiveness ............................................................10

2.4. Dimensions of Development Assistance Coordination .................................13

2.5. Sector Wide Approach and Programme Based Approach ..........................14

2.6. Principles of Effective Aid Coordination .......................................................15

CHAPTER 3. KEY LESSONS LEARNT FOR LAO PDR ................................16

3.1. Lesson from Vietnam ......................................................................................16

3.2. Lesson from Timor L’Este..............................................................................20

3.3. Comparative Lessons.......................................................................................23

CHAPTER 4. HOW ODA COORDINATION IMPLEMENTED IN LAO......26

4.1. Millennium Development Goals (MDGs)......................................................26

4.2. Paris Declaration..............................................................................................28

4.3. Vientiane Declaration and Country Action Plan (CAP) .............................28

4.4. The Round Table Meeting/Process (RTM/RTP)..........................................30

v

4.5. Sector Working Groups (SWGs) ...................................................................31

4.6. Critiques............................................................................................................34

4.7. Current ODA in Lao P.D.R. ...........................................................................39

4.8. Effort of Government of Lao PDR.................................................................44

4.9. Coordination in Practice .................................................................................45

4.10. Sectorial Working Groups (SWGs) .............................................................46

4.11. Evolution of Current Coordination System................................................47

4.12. OECD DAC Survey .......................................................................................49

4.13. International Development Agencies...........................................................51

CHAPTER 5. POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT ...................................................................................................55

5.3. Power Sector Policy..........................................................................................74

5.4. Power Sector Strategy towards 2025..............................................................74

5.5. Recommendations ............................................................................................78

5.6. Regional Coordination Effort.........................................................................80

CONCLUSION........................................................................................................82

REFERENCES ........................................................................................................84

vi

ABBREVIATION

Asian Development Bank

ADB

Avian Influenza

AI

Acquired Immune Deficiency Syndrome

AIDS

Action Plan

AP

Country Action Plan

CAP

Country Analytic Work

CAW

Capacity Development Framework

CDF

Committee for Planning and Investment

CPI

Development Assistance Committee

DAC

Department of International Cooperation (MoFA)

DIC

Development Partner

DP

Daily Subsistence Allowance

DSA

European Commission

EC

Food and Agriculture Organization

FAO

Fiscal Year

FY

Framework

FW

Government of Lao PDR

GoL

Hanoi Core Statement

HCS

Human Immunodeficiency Virus

HIV

INTOSAI

International Organization of Supreme Audit Institution

Lao NCAW

Lao National Commission for the Advancement ofWomen

LWU

Lao Women’s Union

MAF

Ministry of Agriculture and Forestry

vii

MCTPC

Ministry of Construction, Transport, Post and Communications

Millennium Development Goals

MDG

Ministry of Education

MoE

Ministry of Finance

MoF

MoFA

Ministry of Foreign Affairs

Ministry of Health

MoH

Memorandum of Understanding

MoU

Medium Term Expenditure Framework

MTEF

Non-Government Organization

NGO

NSEDP

National Socio-Economic Development Plan

Official Development Assistance

ODA

Organization for Economic Cooperation and Development

OECD

PACSA

Public Administration and Civil Service Authority

PBA

Program Based Approach

PEMSP

Public Expenditure Management Strengthening Program

Public Financial Management

PFM

Partnership Group on Aid Effectiveness

PGAE

Public Investment Program

PIP

Project Implementation Unit

PIU

Project Management Unit

PMU

Procurement Monitoring Office

PrMO

Round Table Information/Implementation Meeting

RTIM

Round Table Meeting

RTM

Swedish International Development Agency

SIDA

viii

Science, Technology and Environment Association

STEA

Sector Working Group

SWG

Technical Cooperation

TC

Treasury Single Account

TSA

United Nations Country Team

UNCT

United Nations Development Program

UNDP

UNFPA

United National Population Fund

Unexploded Ordinance

UXO

Vientiane Declaration (on Aid Effectiveness)

VD

World Bank

WB

WHO

World Health Organization

ix

ABSTRACT

Lao PDR has a lengthy history, abundant and natural-resource-rich country

with plenty of minerals, rivers and creeks which are seen to be hidden strengths for

the development of power, particularly hydropower, thermal, wind power, and solar

energy.

Total energy demand of the Lao People's Democratic Republic was 2.4

million tons of oil equivalent (Mtoe) in 2010, with an annual increment of 3 to 4% in

parallel.with stable economic growth. Therefore, it is estimated that total energy

demand in 2025 will be 6.4 million tons, approximately 2.6 times current demand. In

terms of sector-wise demand, the industrial sector accounts for about 31%, the

transportation sector for about 29%, the residential sector for about 29%, the

commercial sector for about 10%, and the agricultural sector for about 1%. Among

these, the industrial sector and the transportation sector, in particular, show higher

annual increases of l5% and 8%, respectively. These are sectors where remarkable

growth of demand is expected.

Currently, the major energy supply sources are firewood/charcoal (about

47%), petroleum (about l9%), and hydropower (about 19%). However, in view of a

sharp rise in energy consumption in the transportation and the industrial sectors, it is

thought that the petroleum contribution of overall energy sources will be about 60%

in 2025. In addition, the share of electricity is expected to grow substantially as the

electrification rate increases from the current level of abofi 70% to 90% in 2020, and

electricity consumption will increase sharply due to increasing use of home

appliances.

The Government of Lao PDR is expected to establish institutions to secure

energy efficiently by making reliable energy demand forecasts and formulating an

appropriate energy policy and supply pian.

The purpose of this research is to find what is “effective aid coordination”

particularly drawing from the case study of Lao PDR and lessons from successful cases

x

and what possible recommendations for power sector development are. The study

explore extensive literature in aid effectiveness, with an in-depth interview with the

managers, leaders, practitioners etc. Information synthesis is used in to analyze the

data. It is proposed that a solution to the problem of poor delivery of ODA is that the

Lao PDR governement, in general and power sector, in particular must improve its

ODA spending systems and incorporate aid budgets into the national budget and

development plans. It is vital to encourage the Government of Lao PDR to lead their

own development agenda and support development according to local priorities.

The results suggest that it is not just a matter of coordinating aid effectively,

but the aid industry needs the right capacity and people to be involved. Capacity

building is much needed within the recipient national offices as well as many of the

international donor agencies. This would allow the local government to take the

lead and prioritize the commitments signed in the Paris Declaration, the Vientiane

Declaration and the Millennium Development Goals.

It is recommended by many practitioners that the number of agencies working

in decision making processes in the aid effectiveness agenda in Lao PDR should be

limited to reduce transaction costs and promote clear communication within the

development community. However different environments such as Timor L’Este,

suggests that civil society should be involved more and that donor agencies should

not take the lead in aid delivery.

The key point to be learnt is that ODA needs to enhance its efficiency through

the best use of limited resources, aligning with national planning, programming,

monitoring and reporting processes, strategic documents, and priorities. There

should be flexibility to establish and abolish donor coordination groups, avoiding

administrative overburden of public administration staff, while attempting to comply

with donor requirements, established systems and procedures for programming of

donor’s funds. The effective use of existing national planning, monitoring

structures, equipped with national leadership and ownership in aid coordination

should be taken into account.

xi

RATIONALE

As a country condition of mountainously and rich of water resources, Lao

PDR is having 23,000 MW exploitable hydro power potential. With a quick

development of economic and government policy on attraction of the foreign

investment, those hydropower potential has been step to step developed for both

domestic consumption and export for country income generation. Continue of

economic growth is needed to alleviate poverty and achieve social development

goals but the policy options for achieving this are constrained by the small domestic

economy and limited trade opportunities. Therefore, hydropower projects are a

development opportunity for both local and central of Lao PDR in overall

development. The power policy of Lao government aim to establish a priority policy

of developing the country’s potential energy resources to provide a low cost source

of energy that can meet export and domestic policy objectives and promotion of

sustainable development.

The country now has installed power generation capacity of over 3,000 MW,

of more than 13 hydro power projects or about 6,000 MW are under construction

and more than 6,000 MW are under various stages of development by 2025, it is

expected that export would be 80-85% of developed capacities. To transmit of those

power there are a strategy of domestic and international grid development where it

can be divided into domestic interconnection (connection of Northern to Southern

part of Lao PDR) and regional interconnection (connection of Lao PDR to

neighboring countries for power exporting). The Memorandum Of Understanding

(MOU) was signed for supply of power between Lao and Thailand are 7,000 MW

and 5,000 MW between Lao and Vietnam by 2020.

For Lao PDR, Official Development Assistance (ODA) is very important

mechanism to promote the potential of investment fund, technology, marketing,

management experiences, take part of job creation, increase of income level,

upgrade of country development level. Therefore, promotion and attraction of ODA

xii

and FDI is become one of priority policy of party and government of Lao PDR.

Promotion of the ODA into Lao for development of important sectors; potential

sectors are essential necessary for current situation, especially for development of

energy sectors because this sector is an major part of country socio-economic

development; it is a necessary of living condition of the people, generate income

from export of surplus power from domestic use to neighboring country, creation for

income from job opportunity for workers. Together with those, it is also a factor

contribute to promote other sector development as well.

Currently in the world, there are many type of energy; for Law PDR, with

geographic condition, we are having of river which is potential of hydropower

development. According to survey, Lao PDR is potentially of 23,000 MW of energy

can be developed, in there; 13,000 MW could be generate from development of

potential from Mekong river tributary and another 8,000 MW are from Mekong river

tributary and 2,000 MW is from the other type of energy potential. At the moment,

Lao is having 14 officially hydropower plants with generating of 2,558 MW, in their

Electricite Du Laos (EDL) is direct managed of 9 hydropower plants with 385 MW

installed capacity and there could generate of 1,700-1,800 million KWh. Now; every

provincial city; district are already electrified and more than 72% of households are

also electrified. EDL is also supply power to irrigation project for more than 24,000

projects which is further supply of water to production area of 200,000 hector and

supply of power to heavy and light industries of more than 30,000 Unit. In the past

five years, revenue of EDL business operation could reached 1,600-1,800 Billion

Kip; where increased 20-36%. From 1988-2007 Foreign Investment is approved of

1,800 projects with total fund of 9.2 Billion US Dollars, particularly in year 2006 is

a year that development of hydropower is highest with 13 projects and 1.7 Billion

US Dollars fund. In the past 20 years from 1988 to present implementation of

foreign investment policy in Lao PDR were approved from more than 9.2 Billion US

Dollars and in there total investment of energy sector are 4 Billion US Dollars

covered very high proportion compare to the other investment sectors. From 2007-

xiii

2010 EDL are working with other foreign business investment partners of 5 projects

with total capital investment cost of 1.8 Billion US Dollars.

However, for promotion of the ODA are still having several limitation for

example: understanding of the ODA is still different, recent year Lao PRD is

announced for use of the Investment Promotion Law and many other legal

documents concerning ODA and how to use such aid effectively. In the same time

management, selection, approval and opening of the investment form, investment

form of the government into different sectors in particular for the join investment of

the government into energy sector is not yet having a proper package system, thus

this make a difficult to prepare a policy, policy and detail implementation, this

become a limitation of the research on ODA, therefore it make an investment

environment is complicated, legal system, policy is not yet in a one full set system.

There are many policies concern with ODA are regularly adjusted, not clear and thus

this impact to business operation. Further to that policy system on the ODA, foreign

direct investment, etc. between government, ministries and local authority is still not

harmonized and break through, This make difficulty to donors and investors. Those

limitations are making investment climate and environment are liquidity.

Official Development Assistance (ODA) has a long history, yet its

effectiveness and efficiency has always been a concern of both the donor and the

recipients. In order to enhance the efficiency and effectiveness of ODA, the Paris

Declaration has been identified as the key development frame work in leading the

aid effectiveness agenda. It is a contract between members from various developed

and developing countries in an effort to reduce poverty. This dissertation draws

attention on the aid effectiveness agenda and the search for better ways to use such

aid most effectively.

Effective Aid Coordination, as the topic suggests, is all about how to bring

development communities together as one and propose that poverty reduction work

should be incorporated into one master plan. When development institutions work

independently, projects are duplicated and already limited resources are wasted.

With aid coordination, the local government can monitor and outline the priorities

xiv

needed for Lao PDR and allow interested parties to contribute to the government

plan. However the aid coordination system in Laos is not working well at present.

Examples from case studies drawn from Vietnam and Timor L’Este may provide

some useful lessons.

The author has been working in the energy sector for a long time. Through

out the working live, from being a provincial staff on electricity supply

management, to being the Director of Electricity Du Laos State Enterprises, and

currently the Deputy Minister of the Ministry of Energy and Mines, I have seen

and dealt with several aid programs through out the country. The author also has

an extensive network in the ODA administrators and the receipient organizations.

Therefore, the inspiration for this topic was driven by personal experiences. During

my work life, I was overwhelm by the enormous amount of ODA in flows in to Laos.

Observing the aid industry I can see the benefits that aid does for the local people, at

both the central government and provincial government levels, as well as for

expatriates working in development agencies, donors, NGOs and particularly the poor

whom ideally are beneficiaries, which is the prettier side of aid.

The down side of aid is “the operation of aid.” Within the UN agencies

themselves, aid money is not entirely spent for its best use. There are duplications of

projects within the UN system, as well as the entire aid industry. Some projects

adversely affected the beneficiaries more than benefited them. The capacity of

development experts locally and internationally are not always competent to deliver.

The local government is often puzzled but takes aid with open arms.

Since the Millennium Development Goals (MDGs) were set for the year

2015, Laos has signed up to commit to meeting the deadline. There is however, very

little optimism regarding meeting the commitment to aid coordination in Laos. If

only aid could be coordinated and allocated correctly the output of aid could yield

favorable outcome.

Research Aims and Objectives

The aim of this dissertation is to investigate a working model of aid

coordination for Lao PDR with a focus of the country’s ODA status. This will

provide a better understanding of how the aid environment system operates within

xv

the country. In addition to Lao PDR, lessons from Timor L’Este and Vietnam will

be discussed to briefly outline what these countries are doing with regards to

harmonizing ODA and what best practices could be suggested for Lao PDR. It is

assumed that coordination is the key approach for aid effectiveness. The

dissertation objectives are:

1. To evaluate the current working model for aid coordination efforts in Lao

PDR. With this model it can be analyzed whether the current existing approach is

effective or not.

2. To find alternatives for aid coordination for Lao PDR for improvement.

3. To recommend possible policies and solutions to promote effective use

of external aid in the field of power sector development.

Research Questions

1. What is the aid effectiveness agenda in Lao PDR? Which institutions are

involved?

2. What are the local efforts from international agencies and donor

communities for aid effectiveness efforts in Laos?

3. Does the local development community support the local government in

aid coordination?

4. What lessons Lao PDR could learn from successful cases of ODA

harmonization and coordination?

5. What are the alternatives for Laos to improve aid coordination and

harmonization in order to promote power sector development?

Research Methodology

To achieve the above objectives this dissertation follows three steps of

research:

Collecting data. (i) Primary data were collected from different aspects

regarding power sector. The samples from each view were taken from different

sides of the sector. The author had deep personal interviews with different

managers, leaders, practitioners of related institutions/ organizations within the

Ministry of Energy and Mines, MPI, international offices, etc.

(ii) Secondary data were obtained from different sources (Office of the

xvi

government of Lao PDR, international sources, etc) but mostly from research work

done by international offices from which I myself had been involved to some

extent. Some relevant literature were also reviewed.

Data and information analysis. Data and information obtained are used to

analyze current situation of ODA use in Lao PDR.

Recommendations. Possible policies and solutions regarding the

development of the power sector of Lao PDR in years to come will be outlined in

the last chapter based on previous analysis.

1

CHAPTER 1. LITERATURE REVIEW

Official Development Assistance (ODA) has a long history, yet its

effectiveness and efficiency has always been a concern of both the donor and the

recipients. In order to enhance the efficiency and effectiveness of ODA, the Paris

Declaration has been identified as the key development frame work in leading the

aid effectiveness agenda. It is a contract between members from various developed

and developing countries in an effort to reduce poverty. This thesis draws attention

the aid effectiveness agenda and the search for better ways to work in the

development field, including governments and development professionals.

1.1. According to A. McCarty and A.Julian [1], (Bilateral) ODA to Lao

PDR originated in the early 1960s, and multilateral ODA was first recorded in the

late 1970s. Since then, total ODA has shown a strong increasing trend up to the

present, although there has been some fluctuation year on year, with bilateral donors

traditionally contributing the larger proportion of ODA. Total ODA in 2007 stood at

US$ 280 million, which is approximately 7% of GDP - a large percentage relative

to other aid recipients. Japan, France, and Sweden are Lao PDR’s largest bilateral

donors, contributing respectively 40.1%, 16.8% and 11.8% of total bilateral aid

between 2005 and 2007.

Lao PDR is classified as an LDC and is, therefore, covered by the 2001 DAC

Recommendation to untie aid. Between 2005 and 2007 DAC donor countries

formally untied over 70% of their ODA commitments to Lao PDR (CRS).

Meanwhile, for the same period, 22% of bilateral ODA remained unreported with

regard to tying status. The process of untying aid has improved over the last decade,

despite the hesitation of some donors to move to non-project based aid modalities,

such as budget support and pooled funding, which are often associated with

untying. Lao PDR receives largely grant aid as an instrument (98% of DAC ODA in

2007) and project based aid modalities. Several donors also provide project based or

free-standing technical co-operation, in many cases alongside grant funding for

projects, which is often tied. For example, grants which involved no free-standing

technical cooperation (FTC) reported a 96.8% untied share, whereas grants which

2

had a whole FTC component reported an untied share of just 27.8% (CRS, 2005-

07). The three largest DAC donors to Lao PDR; Japan, France and Sweden, all

reported a high proportion of their ODA as untied for 2007: 68.9%, 62.3% and

98.5% respectively. Lao PDR also receives substantial aid from non-DAC donors

that is considered to be largely tied and not necessarily conforming to OECD

definitions of ODA.

The aim of the econometric analysis is to determine whether ODA, the tying

status and the instruments by which aid is provided (loans and grants) have any

significant impact on aggregate donor export flows to the recipient, in this case to

Lao PDR. Overall, the results show that aggregate ODA, and grants in particular,

have significant trade distorting effects through the increase in donor-recipient

exports. This empirical evidence suggests that aid flows could be informally or de

facto tied, when analysis of data from a cross section of donors to Lao PDR is

performed. However, as outlined in the econometrics investigations this analysis

has some caveats.

1.2. Soudalie Silaphet [81] conducted a study to find out solution to the

problem of poor delivery of ODA is that the development industry must improve its

ODA spending systems and incorporate aid budgets into the national budget and

development plans. It is vital to encourage national governments to lead their own

development agenda and support development according to local priorities. He

found that it is not just a matter of coordinating aid effectively, but the aid industry

needs the right capacity and people to be involved. Capacity building is much

needed within the recipient national offices as well as many of the international

donor agencies. This would allow the local government to take the lead and

prioritise the commitments signed in the Paris Declaration, the Vientiane

Declaration and the Millennium Development Goals.

He also recommended that the number of agencies It is recommended by

many practitioners that the number of agencies working in decision making

processes in the aid effectiveness agenda in Laos should be limited to reduce

transaction costs and promote clear communication within the development

community. However different environments such as Timor L’Este, suggests that

3

civil society should be involved more and that donor agencies should not take the

lead in aid delivery.

1.3. According to OECD [61], Lao PDR, in 2006, had a gross national

income (GNI) per capita of USD 2050 (in purchasing power parity terms). Lao PDR

is a low-income country with high poverty rates. The most recent poverty survey,

conducted in 2002, estimated that 27% of the population lived below the dollar-per-

day international poverty line, with 74% living below the two-dollars-per-day line.

The country is on track to meet three of the eight Millennium Development Goals

(MDGs): MDG 2 on universal primary education; MDG 4 on reducing child mortality;

and MDG 5 on improving maternal health. In 2006, total net official development

assistance (ODA) amounted to USD 364 million, with the Asian Development Fund

(ADF), Japan and the World Bank were the top three donors for 2005-06. Lao PDR

was not included in the 2006 Baseline Survey for the Paris Declaration. Thus, the

country’s 2010 targets will be based on the results of the 2008 Survey.

Sixteen donors responded to the 2008 Survey, with their aid constituting

75% of total ODA provided by members of the OECD Development Assistance

Committee (OECD-DAC). Aid accounts for some 12% of GNI in Lao PDR; thus, it

is vital that government and donors work together to enhance aid effectiveness.

In order for aid to be effective, it must be aligned with national development

strategies, institutions and procedures. The Paris Declaration envisions donors

basing their support fully on country partner aims and objectives. Indicators will

examine several dimensions of aid to assess the degree to which partner countries

and donors achieve alignment. The data for Lao PDR suggest that there is

substantial room for progress for most indicators, especially with regards to

improving the reliability and use of country systems, for which the baseline is very

low. Although reforms are being made, there is a lack of financial and human

capacity to implement and reinforce these reforms, which calls for long-term

commitment from donors. The limited use of these systems also contributes to low

levels of aid reliability which further lowers aid effectiveness.

Capacity constraints significantly undermine the ability of partner countries

to capture, co-ordinate and utilise aid flows more effectively. Under the Paris

4

Declaration, donors committed to providing technical co-operation in a manner that

is co-ordinated with partner country strategies and programmes. This approach aims

to strengthen capacities while also responding to the needs of partner countries.

Likewise, there is greater recognition that successful capacity building is

endogenous – e.g. is led by the partner country.

To this end, the partner country defines clear objectives to ensure that

existing capacities are used effectively and that external support is harmonised

within this framework. Some indicator focuses on the extent to which donor

technical co-operation – an important input into capacity development – is moving

towards this country-led model. It measures the degree of alignment between donor

technical co-operation and the partner country’s capacity development needs and

strategies. The Paris Declaration 2010 target is that 50% of technical co-operation

flows are implemented through co-ordinated programmes that are consistent with

national development strategies. Data for 2007 shows that 54% of technical co-

operation to Lao PDR was co-ordinated with country programmes. This is

encouraging. The remaining gap may be the result of the NSEDP’s overall lack of

an articulated strategy for dealing with capacity bottlenecks. The Vientiane

Declaration has given attention to this issue and has formulated capacity

development frameworks for the NSEDP’s priority sectors. Co-ordination of

technical co-operation is now taking place in the education sector and is an

important component of the PFMSP.

The Paris Declaration 2010 target is that 50% of technical co-operation be co-

ordinated with country programmes. The data suggest that Lao PDR has already

exceeded this target although further progress can be made. A government-

commissioned report on the impact of technical co-operation was recently conducted:

the lessons learned from this report will provide a platform for further improvement.

On aggregate, 38% of scheduled disbursements in 2007 were accurately

recorded by the government, although only 65% of scheduled aid was actually

disbursed. For the average donor, the ratio was an even less encouraging 24%.

These gaps can result from several factors: inconsistencies and gaps in the legal and

institutional framework for managing ODA; weak co-ordination between donors

5

and the government in preparing realistic disbursement plans; and donors and

government using different PFM and procurement systems. The government is

taking steps to improve the predictability of aid by establishing a comprehensive

ODA database and by working with donors to develop ways to improve overall

project and financial management.

1.4. According to Travis Harvey [84], the government of Lao PDR and donor

counterparts have a good understanding of the steps required for success and

ownership of the process. DG’s experiences have taught us to adopt a collaborative

approach in designing and implementing processes for aid management, and to

ensure they build on existing ones rather than seeking to replace them. Regular

introductory and refresher user training for key staff has proven critical, as has the

identification of advanced users who can play a role in supporting others in the

future. During this mission the team conducted group training for desk officers and

one-on-one training for senior government officers.

Connectivity between government offices and the AMP server has been an

issue over the past few months because the government data center was being

moved into a new building. During this time DG hosted the system off-site to

maintain access for users. This issue was resolved during the mission by re-

establishing a stable hosting arrangement and fiber-optic connection to the Ministry.

Development partners will access the system via the internet when they begin using

it later this year.

Broad stakeholder buy-in is key to success in AMP country programs. During

this mission the team held a workshop to sensitize other government agencies and

development partners to the program and the workplan. This will be especially

important in the lead up to the national Round Table Meeting (RTM) to be held in

October. The RTM will be a major opportunity to raise awareness of the program, and

DG will be there to support MPI in preparing and demonstrating the AMP system.

6

CHAPTER 2. THEORETICAL FRAMEWORK ON ODA COORDINATION EFFECTIVENESS

2.1. Development Theory

There are many arguments regarding development. Roger Riddell [68] notes

that foreign aid is often defined by its purpose; however, to understand the purpose,

of development aid, it is first necessary to understand what development is.

President Truman’s 1949 inauguration speech is often credited as the

commencement point of the modern-day development era [70]. President Truman

(1949) perceived development in economic terms but recognised that “their

[developing countries] poverty is a handicap and a threat both to them and to more

prosperous areas”; in essence, linking United States (US) development and stability

to the economic and democratic development of the wider world.

Development has a connection with poverty reduction. The early focus of

development concentrated on the reduction of poverty primarily through the

promotion of economic growth [21]. Development, in this sense, or otherwise

known as Modernisation Theory, was seen as developing countries following the

same growth path as pioneered by Western nations [41]. Proponents of this view,

for example Walt Rostow (1960) [98], understood development in a linear

economic fashion that was measured through such narrow indicators as Gross

Domestic Product (GDP). Des Gasper [26] notes that in its crudest form,

development equates to economic growth. However, this narrow understanding of

development raised criticisms from other academics. David Hulme and Andrew

Shepherd [96] noted that it understood “the poor as a single homogeneous group

whose primary problem is low monetary income and has led policymakers and their

advisors to search for ‘the policy’ that increases the income of ‘the poor’”. John

McKay [41] remarks that new theories on development emerged in the 1960s due to

the persistent failure of developing countries to actually develop. These theories

looked at wider development issues such as the structure of the international system

in dependency theory; or the expansion on this idea in World Systems theory; or

proponents of ‘wider development’ posit the expansion of liberty to the individual .

7

Nevertheless, new theories developed over time, with two of them being

prominent today; Neo-Liberalism and Human Development. The former emerged in

the 1980s and can be seen as a resurgence of modernization theory. It proposes the

liberalization of international trade and sees development in economic terms that

occurs through market and private investment. It requires developing nations to

undergo structural adjustment programmes to configure their economies to the

western formats [41] [21] [35]. Conversely, Human Development posits that

“development can be seen... as a process of expanding the real freedoms that people

enjoy...focusing on human freedom” [76]. This approach emphasizes the

improvement in individual capabilities [68]. It considers other factors beyond the

economic progress such as the ability to attain education, health and security.

Moreover, security, in this sense, is the concern of the individual; human security. It

is measured by the Human Development Index from the United Nations (UN), with

the 1994 report being a turning point in linking development and (human) security.

Human security came to prominence in the mid 1990s, owning to it being

seen as an alternative to the narrow economic growth models of the International

Monetary Fund (IMF). It was developed along with many other security theories as

academics began to analyse security beyond the traditional state centric military

approach that was dominant, and rarely challenged, during the Cold War [66] [96].

One such theory, developed primarily by Barry Buzan and Ole Wæver at the

Copenhagen Peace Research Institute (COPRI), is securitization theory. This theory

has sought to ‘broaden’ and ‘deepen’ the security concept, however, the state

remaining as the primary object; a fundamental disparity from human security.

2.2. Development Aid

2.2.1. Donor Motives

Despite of aid had existed long ago, President Truman’s speech is considered

to be the commencement of the modern era in development and consequently,

development aid. Riddell [68] notes that the United Kingdom (UK) and France

both provided aid to their colonies in the 1920s and 1940s. Therefore, while

President Truman’s speech was not a revolution in designing a new concept, it did

shape the existing concept. It conveyed the idea more broadly to the developed

8

world and beyond aid solely to colonial territories. The principal that underpins

foreign aid, according to Riddell [68], is “[t]hose who can should help those who

are in extreme need”. The underlying assumption of this principal is that it is the

donor’s responsibility to selflessly help. Initially, US aid cannot be seen in this

light. President Truman (1949) stated that the motives for US assistance lay in

helping poor people “realize their aspirations for a better life”. Additionally,

President Truman [84] linked the success of these developing countries to the

success and security of the US. Consequently, any aid that was provided went to

nations supporting US views [82]. As aid is rarely given solely for altruistic reasons

[9], when examining aid, it is essential to understand the motives of the donor as

they can often conflict with the altruistic principal Riddell proposes. Riddell [68]

outlines eight motives in donor decisions to give aid; (1) to help address emergency

needs; (2) to assist recipients achieve their development goals; (3) to show

solidarity; (4) to further the donor national political and strategic interests; (5) to

help promote donor-country commercial interests; (6) historical/colonial ties; (7) to

strengthen global public goods; (8) aid based on human rights decisions. While

simultaneously appeasing to many motives, most donors have strong tenets to a

few. The UK and France have traditionally been large sponsors to their former

colonies; in 2006, eight of their top ten recipients of aid were former colonies [62].

Scandinavian aid is focused towards reaching the poverty goals of their target

countries [20]. In this regard, Scandinavian aid is often rated highly for its

effectiveness by the Commitment to Development Index [16] while other countries

receive an unfavourable review; US, Italy and Japan. Aid from these countries is

often criticised for being highly tied , with a principal focus on developing donor

commercial interests and/or dependent on national, political and strategic interests

[75] [68] [65]. Unsurprisingly, these motives can be recognized in the donor’s

public discourse and delivery of aid. Taro Aso [8], the then Japanese Minister of

Foreign Affairs, stated that aid was given to enhance the Japanese national interests and

that the first use of the Japanese people’s money was to benefit the Japanese later on.

US aid is also explicit in stating that its purpose is to “furthering America's foreign

policy interests” [95]. This discourse is reflected in the delivery of their respective aid.

9

Japanese aid is highly concentrated around East Asia and highly tied to Japanese

companies and interests [49]. During the 1980s and 1990s US aid was greatly linked to

the promotion of the Washington Consensus. With the exception of US special interest

in Egypt and Israel, Alberto Alesina and David Dollar [7] note that US aid in the 1990s

was focused on poverty, democracy promotion and encouraging economic openness. In

addition, over 70% of US aid has been tied to promoting US commercial interests to

the extent that this practice was formalised in US law in 2002 [68].

2.2.2. Defining Official Development Assistance (ODA)

Craig Burnside and David Dollar [14] stated that when aid is given with a

high regard for donor self-interest then it is often ineffective in achieving

development. Accordingly, in such incidents, aid can be seen as a foreign policy

tool of donors. Jean-Claude Berthelemy [9] concurs and in his study notes that all

donors, with the possible exception of Switzerland, are egoistic in the delivery of

their aid to differing degrees. Riddell [68] remarks that definitions of aid are driven

and shaped by those (invariably donors) who have an interest in particular types and

forms of aid. Therefore, any definition of aid is dependent on the motives of donors

and will have a self-interested edge to it. Consequently, in defining development

aid, this dissertation seeks to utilise the Organisation for Economic Co-operation

and Development (OECD) definition. The definition is not absolute, as it is

formulated by the members of the 30 developed countries in the Development

Assistance Committee (DAC) of the OECD and, therefore, donor driven. However,

it is widely cited, reached by consensus by the major donors and utilised by the UN.

OECD defines Overseas Development Assistance (ODA) as: “Grants or Loans to

countries and territories on Part I of the DAC List of Aid Recipients (developing

countries) which are: (a) undertaken by the official sector; (b) with promotion of

economic development and welfare as the main objective; (c) at concessional

financial terms [if a loan, having a Grant Element (q.v.) of at least 25 per cent]. In

addition to financial flows, Technical Co-operation (q.v.) is included in aid. Grants,

Loans and credits for military purposes are excluded ... Transfer payments to private

individuals (e.g. pensions, reparations or insurance payouts) are in general not

counted.”(OECD, No Date)

10

This definition is still contested by certain members of the OECD. Non-

Governmental Organisations (NGO) are concerned as some OECD member states seek

to expand the definition to incorporate additional donor security spending [11]. Since

all OECD members are committed to meeting the UN Resolution 2626 in 1970 of

providing 0.7% of their Gross National Income (GNI), and currently, as many states

are failing, any expansion of ODA would facilitate donors in achieving this goal [92]

[68] [12]. By linking development aid to conflict, some donors want to include

spending on the removal of landmines, prevention of child soldiers and even

international peacekeeping. British Overseas NGOs for Development [11] is concerned

that the inclusion of military/security costs into ODA would permit a diversion of funds

away from non-strategic countries. Riddell [68] affirms that aid is a tool used by the

donor to promote development. During the Cold War the different sides of the

ideological divide used aid as a self-serving tool to promote their conception of

development, establish commercial interests and/or as a coercive instrument [69]. The

fall of the Berlin Wall did not change this [36]. Donors focused their aid toward either

the Washington Consensus (USA, IMF and World Bank), thereby instilling the neo-

liberal model upon developing states, or, to a lesser degree, Human

Development/Security strategy (Canada, Norway and United Nations).

2.3. Aid coordination and its effectiveness

Aid coordination comprises activities of two or more development partners

that are intended to mobilize aid resources or to harmonize their policies, programs,

procedures and practices so as to maximize the development effectiveness of aid

resources.

This definition focuses on the two long-standing goals of aid coordination:

resource mobilization and increased development effectiveness. The literature

distinguishes several levels of aid coordination:

- Information sharing and consultation, to understand the activities, plans,

and perspectives of other actors

- Strategic coordination, to reach a consensus on policies, strategic

objectives, and key procedures and practices

11

- Operational coordination, to reach agreement on a common program or

project to be carried out and financed jointly.

While level one can be viewed as the precursor to aid coordination, it lacks

the active harmonization element embodied in the definition adopted above. A key

distinction between the second and the third levels of aid is that under strategic

coordination, projects continue to be financed by separate donors (although in a

manner better integrated with national priorities), while under the latter, donors and

the recipient country pool resources to carry out a joint set of activities or programs.

Not surprisingly, the literature indicates that aid coordination becomes more

difficult for participants as they try to move from one level to the next.

According to Arne Disch [8], the so-called “Pearson Commission” presented

its report entitled Partners in Development. Report of the Commission on

International Development 30 years ago. Key themes in that report remain valid

today: the recipient must be responsible for its own development policies but donors

have a right to be consulted; the interaction between the parties should be based on

a partnership where predictability and performance based resource flows are

integral parts. Aid coordination has subsequently become a key dimension in the

operation of the partnership concept. Donors and recipients alike are allocating

increasing resources for aid coordination activities, with the understanding that

efficient aid coordination generates efficiency gains. It is not clear, however, how to

measure these efficiency gains, nor is there a good understanding of what a “least

cost” strategy for aid coordination improvements should look like.

Two kinds of aid coordination take place at the international level. Focused

events such as the international conferences help generate consensus on overarching

policy issues, largely on specific issues like the environment (Rio), education

(Jomtien) etc. On the other hand, more permanent institutions like OECD/DAC or

process-oriented force like the SPA work with systemic and implementation

problems. Most of the latter institutions are donor-driven, however, with recipient

countries having limited influence. Coordination at the recipient country level

usually includes overarching development issues and financing of national priorities

through Roundtable or Consultative Group meetings, held abroad or in-country.

12

There are often a variety of inter-donor coordination mechanisms in place as well as

government-donor force, both at macroeconomic and sector levels. The number of

such coordination activities has grown rapidly over the last years without clarity as

to what the outcomes of them have been. There thus seems to be a lack of focus and

results-orientation regarding the aid coordination activities themselves, which

represents a major challenge both to donors and recipients.

Aid coordination can be de-composed along several dimensions: geographic

(international coordination on general issues versus recipient country-specific);

content (policies, principles and priorities versus procedures versus practices);

degrees of intensity/commitment (general consultation versus cooperation at the

strategic level versus collaboration at implementation level); national issues versus

sector and sub-sector issues; at geographic/regional level within a given country;

and along functional lines (technical assistance versus general balance of payments

support, for example). By de-composing aid coordination efforts along these

various dimensions it may be possible to identify which cells in the multi-

dimensional coordination matrix yield the higher pay-off to effort.

Regarding mechanisms for aid coordination, the most common one – infor-

mation meetings – may also be the least efficient and could be streamlined/

downsized. At the other extreme, formal contracts often represent cost-efficient

coordination because while they may be costly to establish – investment costs are

high – they generate lasting and potentially substantial reductions in recurrent

transaction cost, and these are the real problems for local administration.

Successful aid coordination implies structural changes to resource flows – in

particular that central agencies like ministries of finance take on a coordinating and

thus a stronger role. This may often generate resistance from those within the local

administration that feel they will lose out, such as aid-favored units in line

ministries – a problem that should not be underestimated. Understanding the politics

of aid coordination is therefore as important as understanding the economics of it.

If there is no coherent government development program and strategy in

place, donors cannot substitute for this by coordinating their own strategy processes,

but should rather support government’s efforts at developing a credible program.

13

This position arrived at for example in the context of a Mozambique survey, is not

accepted by all donors, who believe that many recipient governments are not serious

about addressing key structural issues and that donor conditionality is still required.

Recent studies note the failure of conditionality as a means for attaining policy

changes, however, and this points to the need for more imaginative and constructive

support for recipient-managed strategies.

2.4. Dimensions of Development Assistance Coordination

International community recognizes different dimensions of development

assistance coordination:

• Donor coordination refers to the specific mechanisms and arrangements

agreed within the community of development partners to improve their effectiveness

as partners in the development process. It is a subset of aid coordination.

• Aid coordination refers to the established mechanisms and arrangements

that country governments and their development partners have agreed on in order to

maximize the effectiveness of external aid for development at national or sector

levels. It is a subset of development coordination.

• Development coordination (at national or sector levels) refers to the

combination of aid coordination and the national government systems (policy-

making and implementation, governance, accountability, etc.) that ultimately deliver

development results.

The integration between the receipient national plan and donor coordination is

necessary. Donor or aid coordination efforts alone will not achieve significant

development results unless they are effectively integrated within national

development planning and governance structures and systems. In other words, the

aim of coordination is not just “aid effectiveness” but “development effectiveness”.

The above definitions are useful because the three dimensions of coordination

can be seen as three “stages” with different characteristics. Stage one is donor

coordination. In this stage, the main drive usually comes from the development

partners, while government usually plays a passive role at this stage (lack of systems to

deal with aid or to engage with the donors in policy dialogue, etc.). Stage two is aid

coordination. This stage deals with more proactive engagement of government

14

counterparts and setting up of the foundations of improved aid forecasting, accounting

and aid management systems on the government side. Stage three is development

coordination. In this stage, the government increasingly takes the lead in policy design

and implementation, employing effective mechanisms for management of all

government resources. There are efficient mechanisms of cooperation between the

government and the community of development partners integrated with government

mechanisms and systems. All three types of coordination use different instruments and

at different level (national, cross-sector, sector, local, programme, etc.). Major

challenge lies in adequate definition of sectors and appropriate levels of coordination.

2.5. Sector Wide Approach and Programme Based Approach

Programme-based approaches (PBAs) and a sector-wide approach (SWAp)

differs in its forms and targets. PBAs have been defined as a way of engaging in

development co-operation based on the principle of coordinated support for a locally

owned programme of development. SWAp is a programme-based approach

operating at the level of an entire sector. It is a method of working that brings

together governments, donors and other stakeholders within any sector. It is

characterized by a set of operating principles rather than a specific package of

policies or activities. The approach involves:

• Government leadership • Developing a single sector policy (ideally a policy that addresses private

and public sector issues) and a common realistic expenditure program (budget

framework);

• Formalized process for donor co-ordination and harmonization of donor

procedures for reporting, budgeting, financial management and procurement

• Efforts to increase the use of local systems for programme design and

implementation, financial management, monitoring and evaluation .

A sector-wide approach (SWAp) is an increasingly widespread approach to

development assistance in low-income countries. The SWAp model is seen as an

important approach to enhancing aid effectiveness, mostly through improved

efficiency that would result from better aid coordination where the focus is put on

15

developing and strengthening sector policies and institutional arrangements.

However, it is important to keep in mind that a SWAp and programme-based

approach can be implemented without any external funding at all, with the purpose

of strengthening coordination, coherence and efficiency in relation to desired results

in a certain area.

2.6. Principles of Effective Aid Coordination

OECD monitoring survey 2006 [42] reported that for aid to be effective, each

country needs to determine its own priorities, pace and sequencing of reform. The

monitoring identified that transaction costs of managing foreign aid and the place of

change is slow in donor practices. There is a strong disconnect between headquarters

policies and in-country practices. It is recommended that demonstrating tangible

changes in practices is fundamental in sustaining momentum and achieving further

progress.

The main principles that serve as basis for defining improved aid coordination

mechanism are:

1. Efficiency which refers to the best use of limited resources, 2. Alignment with national planning, programming, monitoring and

reporting processes, strategic documents and priorities,

3. Flexibility to establish and abolish donor coordination groups per need

and avoiding administrative overburden of public administration staff,

4. Complying with donor requirements and established systems and

procedures for programming of donor’s funds,

5. Using existing national planning, programming and monitoring structures

and procedures,

6. National leadership and ownership in aid coordination, 7. Improved harmonization and coordination among donors activities and

priorities in each sector.

16

CHAPTER 3. KEY LESSONS LEARNT FOR LAO PDR

This chapter will detail lessons for the aid effectiveness agenda from two

neigbour countries, namely Vietnam and Timor L’Este. Vietnam has been selected

as a case simply because it has been an important template for the improvement of

aid effectiveness in other nations in the region. Vietnam has a model for Laos to be

learnt since both of the countries have political similarities and are neighboring

countries with special relationship agreement.

While Timor L’Este is different from Lao PDR, in terms of context, political

situation and it said coordination model, it offers some important lessons from a

different environment. The lessons to be learnt from international agencies based in

Timor L’Este are essential. It shows that it is not just a matter of government taking

ownership in the aid effectiveness agenda but also how the international

development community can work together for good aid delivery outcomes.

The chapter will illustrate how aid coordination is pursued in both ways. The

Vietnam section will examine how the Paris Declaration is localized at the country

level, and analyses how the overall aid effectiveness agenda is organized. It will be

shown why many international development agencies recommend that Vietnam is

an example for region to follow. Timor L’Este will be looked at in terms of

reviewing aid reports from the existing literature that is currently accessible through

the internet.

The case is drawn from multiple sources on aid effectiveness monitoring

reports and Soudalie Silaphet [81] .

3.1. Lesson from Vietnam

Before the Paris Declaration, UN agencies were fully involved with the

Vietnamese government in coordinating aid. A good partnership has been illustrated

since 1993 with improved aid management. Vietnam has under gone a remarkable

transition from a closed economy oriented toward the former Eastern Bloc countries

to a market oriented economy with rapidly growing trade and aid relationships with

17

its Asian neighbors and Western donors. The growing influx of foreign capital, both

private investment and Official Development Assistance (ODA), has helped fuel

high rates of economic growth but also created a series of challenges for the

government. In the past several years, the government has taken a series of steps to

strengthen its ability to define priorities for development assistance, coordinated on

or support, and manage aid more effectively.

Since the Paris Declaration, the Vietnamese government has realized that localization of this agreement is essential. The Prime Minister’s Decree on the

issuance of the regulation on the management and utilization of aid from international non-governmental organizations has been effective since April 26,

2001. This resulted in the Ministry of Planning and Investment (MPI) and Ministry of Finance (MOF) becoming the sole aid coordinators [79]. MOF has the role of

organizing public expenditures and managing budgets while MPI has had the overall role in aid coordination and management.

The Ministry of Planning and Investment has a department which is

responsible for aid coordination. MPI helped to establish the Partnership Group on

Aid Effectiveness (PGAE) and is a core member of the ‘Friends of the Co-Chair’

group who produced the Hanoi Core Statement (HCS) which consists of

representative of government and donors. PGAE act as a forum for partnership

groups and donor groupings and provides frequent opportunities to discuss and

monitor implementation of the HCS.

Although the Task Force that is the PGAE for aid effectiveness working

group is organized, it has a weakness in practical use because the concept of it is

lost. The HCS spells out in the local context the implications of the Paris

Declaration. The success factors resulted from strong leadership of the Vietnamese

government, a continuous effort to ensure that the donor community commit on the

agenda with a balance of a competent group of visionaries and strategic thinkers.

This is important because, if these involving representatives do not have the right

capacity to be involved in the aid coordination agenda; it is unlikely that

coordination process will be successful. The PGAE continue dominating the

processes in aid effectiveness agenda in Vietnam and putting the Hanoi Core

18

Statements in to implementations.

The Hanoi Core Statement became effective on 28th September 2005.

Vietnam became the first partner country in the world to localize the Paris

Declaration on Aid Effectiveness in the Vietnamese Context.

The Hanoi Core Statement scents reason the following principles which

includes 14 indicators and targets that have been agreed by the Government and the

donors. These indicators are used to monitor the progress achieved in improving aid

effectiveness in summary [46].

1. Ownership: The government is the leader and owner of the development

agenda.

2. Alignment: Donors use government plans and government systems.

3. Harmonization: Donors and government harmonize ways to deliver aid.

4. Managing for Results: The government manages for results and donors use

the government’s results framework where possible to measure success.

5. Mutual Accountability: donors and government share accountability for

aid effectiveness.

In order to translate commitments in to concrete practices, the PGAE

continues being the focal point. The group meets on a monthly basis under the co-

chair of the Ministry of Planning and Investment with the European Commission. A

base line survey was conducted twice to measure progress towards meeting the

Hanoi Core Statement and to compare data for accuracy.

To make the HCS practical the Vietnam Harmonization Action Plan 2005-

2006 (V- HAP) was established to support the implementation. The V-HAP

contains a large number of activities to be implemented by arrangement of

government agencies and donor. Figure 3.1.1 below illustrates how ODA is

distributed once the process of Paris Declaration is localized and implementation is

outlined. The right-hand column shows how aid effectiveness agenda is localized.

Mean while the ODA resources (middle column) support Vietnam’s development

agenda, that is through a strategic framework administered by the PRGS/CPRGS

through a short term plan of 5 year Socio Economic Development Plan which

19

complements the 10 year Socio Economic Development Plan (SEDP), illustrated in

left hand column.

Figure 3.1: Relationships between Vietnam Development & Aid Effectiveness Agenda

(Ministry of Planning and Investment & UNDP, 2005)

Figure 3.2: Improving Aid Effectiveness to Support Vietnam’s Development

(Ministry of Planning and Investment & UNDP,2005)

The 10 highlights of the current status of Aid effectiveness in Vietnam

20

includes [47] from adopting the HCS which the government recognizes the Paris

High level forum as one of global leader. The SEDP detail sectorial and

provincial plans with consultation with donors. The development of the ODA

Strategic Framework has been done. An ongoing process to strengthening the

legal framework for public investment and ODA, including drafting the

Procurement and Public Investment Decree and revising the Environment Law.

The Joint Government and donor for the Public expenditure Review was

launched to create awareness, along with the launch of the Targeted budget

Support Programs for Education for all as well as continuous promotion for

increasing number of donors joining the poverty reduction support credit. This

common reporting system tool was successfully piloted. The problem-solving

efforts have been undertaken by the inter-Ministerial Taskforce which is handled by

the PGAE.

3.2. Lesson from Timor L’Este

Unlike Vietnam or Laos, Timor L’Este was not one of the original

signatories of the Paris Declarations. Therefore their agenda does not include any

commitment to localization of the Declaration. They also have a different

environment and vulnerable political situation in comparison with other countries.

A vulnerable country like Timor L’Este receives aid 3.6 billion US dollars of

international assistance between 1999-2006 (Norad, 2007) where a majority of

ODA are for emergency relief and long term state building efforts. Included in this,

half of the amount was made up from contributions from the UN missions and the

other half was from 28 bilateral donors as well as multilateral donors.

The major challenge in working in Timor L’Este is the availability of

statistics. Many development practitioners struggle to find indicators because of

limited existence of important documentations. Giving the circumstances of being a

young an unstable political situation, it is difficult for Timor to get into coordination

effort to make their abundance of aid received effective.

The local aid environment is entirely dominated by development agencies

particularly the massive UN mission based in Dili, the capital city. There is limited

economic activity within the country and aid dominates the economic growth.

21

Timor is chosen as a lesson to be learnt for aid coordination because it has

demonstrated good joint aid delivery within the development community.

Financial assistance is not the only aspect of the ODA portfolio. The

international community has provided more than the real value. These are combined

packages of military and police force support, UN missions from transition mission

to current state building mission, and humanitarian technical assistance [68].

COMPACT was the only mechanism to coordinate how a development community

comes together and talk about the needs for the country and what donors can do to

meet such requests. The challenge was working with a transition government that

could mean any decisions made in that day would later not have future values. The

COMPACT meeting consists of officers from government and development

agencies and representative of civil society and head of local communities.

Although the outcomes of the meeting held were not effective, given that was the

first coordination initiative.

The unique development practices from Timor L’Este were the development

community coordinates aid within themselves. Because of the transition situation

and that the country is still in a weak position to lead development agenda. The

donor community has approached aid coordination amongst themselves. Within the

UN missions and UN agencies there are coordination within themselves, while

other donors and the rest of the community try to come together and work on joint

programs in order to share the limited available resources that the country has.

Following the post conflict reconstruction, many external partners particularly

bilateral donors such as Japan, Norway, US, Australia and international banks

(World Bank, ADB) have moved toward establishing a presence in the country and

have geared toward long term day-to-day engagement. Under the previous

government leadership, external partners have supported the development in

National Development Plan (NDP). Most of the development agencies are aligning

their assistance with the NDP. The World Bank’s Country Assistance Strategy

(CAS) for FY06-FY08 includes a result framework to support NDP implementation

and supports all development partners (Development Gateway, 2006). This became

an agreement obtained by both development partners and the Government of Timor

22

L’Este. A join trust fund was created (Trust Fund for East Timor) in 1999 to support

the reconstruction and development activities. The World Bank has been playing the

central role in supporting the government in capacity development, coordinating all

partnerships within the country. For Analytic and Sector Work in reconstructing

Timor L’Este several major donors created Joint Assessment Mission (JAM) to

identify the priorities for Macroeconomic development. This is a great example of

effective aid practice, namely having agencies join together with one objective and

contribute each specialized resources into one program or project.

Many development agencies understand that in order to achieve the

Millennium Development Goals (MDGs), their development practices need change

to improve development practices and expedite the effort of MDGs. UN agencies

‘programs have been jointly organized through channels of funding, with one

objective. Many of their specialized agencies do not have independent projects and

have moved to new programs with join initiatives. Even fund raising efforts have

been jointly organized which is much different from UN agencies in Laos. The UN

Trust Fund for Human Security (UNTFHS) was a great example of joint effort in

Timor, where UN agencies got together and have designed program and propose a

one of financial support to the Japanese donor. This task is managed and led by a

unit called Poverty Reductions Unit, within UNDP. This new proposed project also

involves many agencies through combined resources to explore how human security

could be addressed in Timor L’Este. That includes senior management team

representatives from: UNICEF, World Food Program, UNDP and UN Habitat. The

project will be involving several activities ranging from, micro-finance support by

UNDP, WFP will support children and family for food security, while UNICEF

overlooks at child health care and UN Habitat overlooks are providing homes for

families who were internally displaced during the internal crises.

Although Timor L’Este is a young country, many challenges lie ahead for its

people. The development community has set a great example in working together in

one common agenda. It realized that the local government needed to improve local

capacity to manage aid. Nonetheless, development agencies have been working

together in joint programs and projects to ensure efficient output. By doing so it

23

allows for development agencies to realize the current activities within the country

and avoid project duplications. They rely on working together in order to come up

with non-existing recorded statistics. This is the best development partnership

displayed in which other countries could learn from. From personal work

experience in Laos, much of the development community duplicates one another’s

projects simply because of poor communication and lack of awareness. With

lessons learnt from both countries Vietnam and Timor L’Este, Laos could look at

their model or practices for better aid delivery. This is relevant for both developing

country governments and applies well to development agencies.

3.3. Comparative Lessons

Vietnam has the advantage of having put its aid effectiveness portfolio

together much faster than Laos. Laos only started their agenda recently and

finalized their work plans late in 2007. Much of the Lao agenda still needs to be

improved because of local conditions. While Vietnam has a relatively good balance

of competent people working on the agenda, Laos needs to improve the local

capacity. Funding for training such as English language training, report writing and

basic specialized trainings in order to support the coordination effort from the

central level are also needed. That involves not just the local government’s ability to

coordinate aid, but the development community’s willingness and commitment to

support the agenda with the right capacity.

The development community seems confused and rather weak in making

good aid practice work. The important aspect of Vietnam’s successful model is that

the government has taken strong leadership within the development community.

The success factors also involve pushing the development community to cooperate

with the government’s agenda. Vietnam even has provincial plans beside sectoral

plans and consulting with donors to align. This is one of the components of aid

delivery that still needs improvement from the local Lao government situation.

Although two provinces have been identified to monitor the projects, the capacity of

provincial governments lags far behind and coordination is difficult to implement.

This is one of the reasons why aid coordination is still done entirely at the central

level. Thus, in Laos, capacity still needs to be significantly improved.

24

Vietnam is one of the first countries to get a head start with the localization

of the Paris Declaration. It became a model, particularly in South East Asia, for how

development communities in the region could coordinate aid effectively.

Accordingly, Laos has recently attempted to localize their version of the Paris

Declaration, and the development community there has drawn on the Vietnamese

aid effectiveness agenda as a leading model. Both countries are similar in terms of

their systems but Laos needs to catch up on more details, especially decentralizing

the coordination and monitoring down to provincial level.

Timor L’Este has particular characteristics in its development efforts and

draws much attention to the role of development practitioners. The unique

geographical location as well as its history has led to a situation where government

capacity in severely limited. Aid inflows are much higher in comparison to Laos

and coordination is essential. However, Timor L’Este has a weak state sector and,

as a result, has to bring civil society much more into its development agenda. At

present, Laos to be in a rather similar situation but shows few signs of involving

civil society effectively.

The Lao UN agencies have struggled to put joint programs together because

they have their own mandates to operate aid. Although they have been trying to

move from independent programmes to working together amongst themselves, it

has been really difficult for them to do so. Within UN agencies, they find it much

more difficult to coordinate aid and organize joint programmes, in comparison to

UN agencies in Timor L’Este. Timor L’Este has not yet signed up for the Paris

Declaration and therefore, the government is little concerned with localizing aid

effectiveness. However, the international is and development communities have

realized the importance of coordination and they have taken the approach through

the community themselves. With or without the government, they have realized the

instability of the political situation and the need to take actions for the people of

Timor L’Este. They have moved into joint programmes although their existence in

Timor has only been recent, since independence in 1999.

UN agencies in Laos often do not operate successful joint projects and there

are concerns regarding power and the management system, because some UN

25

agencies operate their programmes from headquarters rather than in country, such

as United Nations Conference for Trade And Development (UNCTAD). They have

their own mandates and different funding systems that are different from resident

agencies. Agencies like UNICEF have their own appear to operation system as well,

with independent funds disbursement system and operate independently. Some

smaller UN agencies that are resident and some non resident agencies had to

incorporate their funding mechanism into the UNDP system. This is one of the

reasons why joint programmes are so difficult. The unusual side of UN agencies is

the question of why coordination works well in some countries and others don’t

when they are basically the same type of organization. Due to these problems, aid

coordination is difficult when even the UN can’t coordinate its own agencies

properly to work together.

The lessons from both countries yield significant differences, yet both types

of governments and development partners agreed that the declarations are good

although the declaration were taken at higher level and they are difficult to

implement at ground level. There are concerns amongst smaller agencies that they

do not have a place in development roles because they could lose recognition in

flagging the name of their agency and its contributions into the pool funding

system.

26

CHAPTER 4. HOW ODA COORDINATION IMPLEMENTED IN LAO

Lao PDR is a landlocked country categorized as a Least Developed Country

(LCD) located in the heart of South East Asia, bordered by Cambodia, China,

Myanmar, Thailand and Vietnam (see Figure 5.8). It has a population of 6.1 million

(UNDP, 2011) most of whom live in rural areas. The official language is Lao,

though there are 49 officially recognised ethnic minorities divided into three major

groups: Lao Lum (low landers), Lao Theung (high landers) and Lao Soung

(Hmongs). The growth rate of Growth Domestic Product (GDP) is one of the

highest in the region at 6% but there is approximately 32% of the population living

under the poverty line of the $US 1.50 per day in 2002 (UNDP, 2011). Some 73%

live under $2 per day, and 25% less than $1 per day.

4.1. Millennium Development Goals (MDGs)

The Millennium Development Goals are a global commitment set by many

countries, both developed and developing. Faced with rising world poverty levels,

many donors and recipient countries gathered to set eight goals for the year 2015.

These eight goals break down in to 18 quantifiable targets that are measured by 48

indicators. The MDGs therefore represent broad agreement on the goal of poverty

reduction. Setting key objectives for aid, they help focus aid delivery. The overall

MDGs include the following:

Goal 1 is to eradicate extreme poverty and hunger by setting a target in

halving proportion of people living on less than a dollar a day and those who suffer

from hunger. Goal 2 is to achieve universal primary education by setting high target

to ensure that all boys and girls complete primary schools. Goal 3 is to promote

gender equality and empower women. The target set is to eliminate gender

disparities in primary and secondary education preferably by 2005, and at all levels

by 2015. Goal 4 is to reduce child mortality by setting a target to reduce by two

thirds the mortality rate among child under five. Goal 5 is to improve maternal

health targeting to reduce by three quarters the maternal mortality ratio. Goal 6 is to

combat HIV/AIDS, malaria and other diseases, the target halt and begin to reverse

27

the spread of HIV/AIDS by halting and beginning to reverse the incidence of

malaria and other major diseases. Goal 7 is to ensure environmental sustainability

with very intense targets. This target aims is to integrate the principles of

sustainable development into country policies and programs and reverse loss of

environmental resources. In addition, the target is to reduce by half the proportion

of people without sustainable access to safe drinking water, as well as achieve

significant improvement in lives of at least 100 million slum dwellers, by 2020. The

last, Goal 8, is to develop a Global Partnership for Development.

This is a donor driven approach set by many developed countries. The idea is

ambitious to reduce world poverty significantly. Accordingly, with targets set for

the year 2015, the MDGs have been set a apriority for many countries. The

importance of these goals requires an abundance of financial support and many

developed country’s donors have pooled their aid in the hope that poverty will be

alleviated. Since the year 2000 it has been noted that there has been an enormous

increase in the amount of ODA in order to meet the coming dead line. For many

countries, 2015 seem a distant future that is difficult to reach. Many reasons came

to be involved in the lack of government capacity in developing countries, lacking

the natural resources, limited financial supports, war, natural disaster, etc. Aid

effectiveness is essential for the development of poor countries. Since the MDGs

have been signed by many countries, more effort needs to be made so that the

deadline of 2015 is to be met. The MDGs reflects how aid effectiveness is

important so that the distribution of funds can be achieved those Millennium Goals.

However, since the adoption of the MDGs many development in situations and

donors still operate their aid programs in their original forms inhibiting the

coordination effort of the local government.

The MDGs have been adopted in Lao PDR. The United Nations

Development Program (UNDP) resident office in Vientiane has been the leading

agency for Lao PDR and support the localization of the global contract set by world

leaders in 2000. The UNDP has been supporting the Lao Government on the

localization and has promoted a number of tools to measure whether Laos has been

making progress on the MDGs. The tools used for supporting the work on MDG

28

commitments includes the Common Country Assessment (CCA) which details the

overall development environment of Laos before drafting the practical plans to

achieve localized MDGs goals (Government of Lao PDR & UN Country Team,

2006). The United Nations Development Framework (UNDAF) is another tool that

outlines how the MDGs could be met with coordinated contributions from the

entire development community. This as well is drawn from the local development

effort, the National Growth and Poverty Eradication Strategy (NGPES) has been

produced by the Lao Government to set out the coming period of the country’s

poverty alleviation strategies.

4.2. Paris Declaration

The Paris Declaration was endorsed on March 2, 2005 by many countries,

including hundreds of Ministers, Heads of Agencies, Senior Officers, to commit to

aid delivery efforts through harmonization, alignment, and management of aid for

better results with a set of monitorable actions and indicators (World Bank, 2006).

The Paris Declaration goes beyond other agreements such as the consensus reached

at Rome in 2003 to what is now a practical blue print for donors and developing

countries to monitor each other’s progresses. It strongly commits donors to

increasing the impact of aid in reducing poverty, increasing growth, building

capacity and acceleration achievement of the MDGs. It is a donor driven approach

in development that is organized by the rich member countries of the OECD. It is

very much the focus of how development should be dealt with from a donor’s

perspective.

The commitment for aid effectiveness includes a call (World Bank, 2007) for

developing country partners to exercise effective leadership over their development

policies, strategies, and to coordinate development actions. Donor countries will

then plan their overall support after a recipient country’s endorsed the Paris

Declaration. A survey was later carried out early 2008 where only 56 countries

responded to be surveyed (OECD, 2008).

4.3. Vientiane Declaration and Country Action Plan (CAP)

The Vientiane Declaration (The National Round Table Process, 2007)

spelled out a local commitment and decentralization on localization of the actual

29

Paris Declaration. The government of Lao PDR and its donor partners in

development have taken actions to make aid more effective and assist the Lao

government in achieving the Millennium Development Goals. They have set long-

term development goal of exiting the status of least developed country by 2020. Laos signed this Vientiane Declaration on November 2006 during the 9th Round

Table Processing Lao PDR. There were 22 countries and organization partners and

afterwards two more countries joined the signatories (Thailand and the Philippines).

Lateral Country Action Plan (CAP) was prepared between February and May 2007

to accompany the Vientiane Declarations. The reason for the CAP is to detail

implementable actions for the six indicators to be approached data country level.

The Vientiane Declaration reflects a mutual accountability and respect for

the ambitious structure of the Paris Declaration. However the Declaration does not

constitute legally binding commitment between governments and agencies. They

are another step in making aid work at a country level which the Lao government

will make available appropriate resources, knowledge and capacity to make the

Declaration effective. The five indicators of Ownership Harmonization Alignment

Managing for Result and Accountability (OHARMA) aim to improve aid

effectiveness in five different areas:

1. Increased country Ownership over policy and development plan,

implementation and aid coordination. This is in hand with the National Growth and

Poverty Eradication Strategy (NGPES) 2006-2010 to integrate with official

development assistance main stream planning.

2. Better Alignment of Development Partner's support to national policies and

plans, and increased support to use the national systems. A single Project

Implementation Unit (PIUs) or Project Management Unit (PMUs) for day-to-day

management and implementation of aid-financed projects and programs. This will avoid

the creation of parallel structures so that it can be fully integrated with the government.

3. Harmonization involves taking simplification of development partner's

procedures and activities.

4. Managing for Results in order to ensure effective use of resources. The

DIC will monitor actions.

30

5. Implementation is a responsibility of all signatories, and Government and

Development Partners will be Mutually Accountable for reporting on progress.

4.4. The Round Table Meeting/Process (RTM/RTP)

The Round Table Meeting (Ministry of Foreign Affairs & UNDP, 2007) has

been in operation in Lao PDR since 1983 with the support of the United Nations

Development Program (UNDP). Until 1993 the meeting focused on donator-annual

meeting in Geneva and for the first time in 2000 and is now organized locally in the

country. Rather than a three year initiative the local government has made it a

continuing dynamic process. The Round Table Process (RTP) focuses on

strengthening national and sartorial aid coordination mechanisms. The actual Round

Table Meetings (RTM) themselves being one component of a comprehensive

approach to aid effectiveness.

The RTM objective is to facilitate the consolidation of the Round Table

Process so that effective forms of aid integration, coordination and management are

established. It also requires building sustainable technical capacities for aid

coordination, integration and management in the country. Through this, UNDP has

been supporting the Government in ensuring sufficient resource mobilization.

UNDP has been providing ongoing support to the RTM, because it relates

directly to the United Nations Development Assistance Frame work goals of

poverty eradication. This is one part of the UNDP project that aims to support the

national development goals including the Millennium Development Goals and the

National Growth and Poverty Eradication Strategy (NGPES). It helps the

formulations of the Vientiane Declaration and the Country Action Plan on aid

effectiveness as mentioned previously.

Below is an outline of the Round Table Process (Figure 4.1). The nature of

the RTM is to meet on a three year basis which is a high level forum where high

ranking government representatives gather to discuss development of Lao PDR. The

annual meeting was also organized to follow up with development communities on

implementation of development agendas and preparation of the next RTM forum.

31

RTM (3 year basis)

Annual Round Table Implementation Meetings

Sector Working Groups Meetings

Sector Working Groups Meetings

Sector Working Groups Meetings

Figure 4.1: The Round Table Meeting Structure [104]

4.5. Sector Working Groups (SWGs)

Under the RTM, Lao PDR currently has 8 Sector Working Groups that bring

together representatives from government and donor agencies, and NGOs. The SWGs

are forums to discuss and build consensus about development priorities, and to improve

sectorial aid coordination and effectiveness setting out the Vientiane Declaration and

the Country Action Plan. Under the common frame work of the Round Table Process,

these groups commit to Lao PDR's development efforts in the areas of their expertise

under the leadership of the Government of Lao PDR. These groups are similarly

known in broader term, Sector-Wide-Approach (SWP) which is implemented by sector

as the SWGs in the case for Laos. It is a program-based operating at the level of an

entire sector through sector strategy as listed in Table 4.1 [58].

These groups were formed in June 2007 by the Ministry of Foreign Affairs at

the Round Table Information Meeting. The Department of International Cooperation

was located in the Ministry of Foreign Affairs which is currently the Committee for

Planning and Investment. It is the overall coordinating agency of the SWGs

mechanism. The current groups are illustrated in Figure 4.2 [104].

The RTM has always been a forum where government could call development

agencies to join and discuss development issues for Laos. The MDGs is another

32

component that is coordinated with in the RTM as well which discusses how the MDGs could be achieved through this high level forum. Since the Paris commitment it has been added in to the work of RTM and coordinated by the

government as one agenda, rather than having a separate operation although they are separate contracts. The MDGs and the Vientiane Declaration are components of the RTM but the differences between the Vientiane Declaration and the RTM is that the RTM acts as forum and it sets out criteria for ODA effectiveness. It is rather difficult processes in practice because it follows the objectives of RTM and donors do not always support the agenda.

Table 4.1: The Round Table Meeting Structure

Sector Working Group

Chairing Ministry and Co-Chairing Development Partner(s)

Health

Ministry of Health Japan WHO

Education

Ministry of Education Australia/Aus AID UNICEF

Infrastructure

Agriculture, Rural Development and Natural Resource Management

Ministry of Communication, Transport, Post and Construction Japan ADB Ministry of Agriculture and Forestry France/ADF Sweden/Sida ADB

Governance

Prime Minister’s Office (PACSA) Sweden/Sida UNDP

Macroeconomic Issues and Private Sector Development

Committee for Planning and Investment World Bank International Monetary Fund

Drug Prevention(Mini-Dublin)

Lao National Commission for Drug Control and Supervision Australia/Aus AID

33

[104]

34

Figure 4.2: RTM with Sectorial Working Groups (SWGs, 2007)

4.6. Critiques

There are many critiques around the Paris Declaration that focus on many

development practitioners, donors as well as recipients themselves. There are

several assumptions that the Declaration is fully designed to support the developed

country’s policy toward said distributions rather beneficiary countries. There has

been criticism that the Declaration is just another agreement that won’t fully support

aid just like the Rome Agreement, rather just another donor driven approach on the

development agenda.

It can be seen that the commitment to “country ownership” relies on donor

alignment with partner governments’ national development strategies. This

alignment is usually the result of highly unequal and donor-directed policy

dialogue, focusing on implementing World Bank/IMF-mandated Poverty Reduction

Strategy Papers (PRSPs). On the other hand the PRSP may be focused on the basis

of development policy that may not directly reflect the MDGs. Perhaps it is not

35

supposed to be looking at minor details of how it should be implemented. This

could be the reason why aid effectiveness effort is not entirely clear when it comes

down to localization at country level. In addition to the term country ownership can

refer to a number of dimensions of the multidimensional relationship of the

domestic party. It can be defined as ‘property of programs, process, plans, or

strategic involving both a ‘domestic party (generally nation state) and foreign party’

(Buiter, 2007 pg. 648). Due to this reason, the most important pillar of the

declaration has been misleading causing conflicting views and interests.

Although agreements or declarations in general are legally binding, they

lead to many delays obtaining the signatures to be committed. Implementation is

more difficult as more funds are needed to mobilize for this new agenda while the

MDGs budget can be short for some countries. It is advised to incorporate the aid

effectiveness agenda into the programs but in practice it is viewed as an

independent or a new program which runs parallels to development programs. The

process is timely and the development community does not fully understand.

The declaration assumes that its reforms in the delivery and management of

aid will improve aid effectiveness in reaching poor people and mobilizing them to

address their rights. Reform of current aid practices is vitally important. However,

the Declaration establishes no commitment to clear targets or mutually accountable

assessments of whether these specific reforms will result in sustained progress in

reducing poverty (The Reality of Aid, 2007). ‘Harmonization’ is another confusing

term in addition to ownership. Eyben (2007) refers to harmonization as a buzz word

in development industry. Donors try to have common programs and procedures, so

that the recipients need to communicate with only one single set of financing

agencies. This leads to a reduction in transaction costs for recipient organizations

because they deal with only a single inter locator, instead of having to report

separately to many different donors. However, while it is an attractive idea, as long

as donors do not recognize and address the issue of power in the aid relationship,

harmonization is likely to be counter-productive in promoting locally initiated

responses to development challenges. The new orthodoxy points out that although

the Paris Declaration has been agreed, donors will still go about behind closed

36

doors to agree what they want to play before going into official coordination

meetings. Harmonization is being practiced in aid-dependent countries that result

donors being a monopolistic supplier. In addition to the national poverty strategy,

behind this donors are still lining up to influence recipients and act on behalf of

representative civil society. Eyben simply summed up that harmonization becomes

a vice to donor’s habits of pretending that poverty is not about politics.

A personal interview from a New Zealand NGO has brought several

additional points of criticism. An interview with Ms. Rae Julian (previously the

Director of Councilor International Development) highlighted several weaknesses of

the Paris Declaration. The Paris Declaration does not take into account the NGO’s

role within the aid effectiveness agenda. This involves taking little or no account of

the role of civil society in promoting aid effectiveness. Their role within sector

groups with donors and larger international agencies are minimal because they offer

smaller resources.

See further outlined more detailed critiques of the five pillars in the Paris

Declaration as follows:

1. Ownership: this is rather confusing term. Rather than just ‘ownership,’

the preference would be to change the principle to “democratic ownership”, which

would mean that development policies and strategies have been planned in a

participatory manner, in full consultation with all sectors. Although PRSPs are

drafted with national priorities, in practice there are still conditional ties applied.

2. Alignment: the support for direct funding to developing countries government

raises concerns that NGO’s role in development would soon be phased out.

3. Harmonization: this is the intention to reduce transaction costs. Once

again there are concerns of civil society having a minimal role when Sector

Working Groups are formed. There could be only donors groups working with

government and leaving out the civil society.

4. Managing for Results: here these are concerns with indicators being too

mechanistic rather than covering the core values and principles underlying aid.

5. Mutual Accountability: many NGOs are not technical organization and

hold contractual relationship in aid spending. There are also in equalities in donor

37

recipient relationships. Strengthening independent institutional monitoring of

donors against clear and enforceable benchmarks for donor performance is

essential.

Yet, despite this criticism the Paris Declaration has had much influence on

improving aid delivery in the health sector and provided lessons learned from the

implementation in human rights, environmental sustainability and gender quality

[41]. The harmonization brings together gender equality and human rights in to the

center of the Paris Declaration. The health sector has an enormous increase in aid

support becoming the major recipient in aid. Before the Paris Declaration, health

sector funds which target assistance on specific diseases or sub-sectors were not

well aligned with government priorities and holistic health systems’ approaches

were insufficiently funded.

Strategy review on effective aid management has been done to provide

lessons and achieve development results. Lessons at the level strategies are [60]: i)

To find the appropriate legal and political foundation that is to obtain the clarity at

the highest political level on the national aim aid program, due to involving multiple

relationships. ii) To manage competing national interests by avoiding short-term

pressures jeopardizing long-term common interest in effective development, such as

trade, political relationships or security. iii) To achieve greater policy coherence for

development by setting clear mandate and establish mechanisms to ensure policies

are assessed for their impact on poor countries. iv) Invest in delivering, measuring

and communicating results of aid-financed activity. v) Identify a leadership and

structure that works, hence countries do not have to follow same localization

structure of the Paris Declaration. vi) Rationalize bilateral aid structures to facilitate

coherent action at country level by dealing with institutional dispersion. vii)

Manage contributions to multilateral institutions and viii) decentralize management

to the field. Lessons concerning management of delivery are: ix) To manage the

scale-up of development aid. x) Maintain a focused approach towards countries and

sectors and xi) Emphasize performance-based management, evaluation and quality

control and lastly xii) Make human resource management priority.

Lao PDR has been dependent on ODA for many years, particularly in public

38

sector development. Since the open door policy on the market oriented economy,

Laos have been influenced by the outside world and development. Large amounts

of ODA have been received by Laos with many development projects now in

operation.

Over the past years, ODA had no coordination mechanism in Laos and

development agencies operated independently using their own guidelines, policies,

and practices. In cases where an agency that would like to have a project in Laos, it

would have to draft a proposal to the DIC office and agreements would be signed

by its representative and the government only then would a project be approved for

operation. There are cases where projects can start its’ operations without agreement

of the MOU being signed. This was because of inefficient and lengthy approval

processes.

Many development institutions would make their own plans and execute

their projects with joint government partnership. The monitoring and evaluations

are done by agencies themselves and reports are submitted to government for filing.

However this has led the development community to be lost in communications and

project duplications. This wasted time and resources which resulted in efficient use

of aid. Although DIC has the mandate to coordinate ODA movements, the

constraints are in internal funding to operate the coordination processes, let alone

the capacity of government officers.

There are incidences where active international development institutions

have brought the development community together to provide awareness of their

activities and share knowledge. Yet, the development industry is too large to control

let alone the issue of agencies’ interests. Aid coordination seemed to be wasting time

and development agencies have their own binding mandates. From personal

experiences, agencies like the UN have poor internal communication amongst

themselves.

For this reason, aid coordination is essential. This part will start with an

overview of how the ODA was implemented before the Paris Declaration, which

has been discussed above. The following section will introduce the current ODA

statistics and introduce the government policy on aid coordination status, followed

39

by the effort of the Lao government to aid coordination agenda. The fourth section

will cover how the aid coordination is done in practice from the field research,

covering aid coordination in practices. The fifth section will examine the SWGs that

is one component to the RTM and introduce the overall structure of the aid

coordination system in Lao PDR. This will document current results of how

coordination is adjusted from SWGs proposed structure for aid systems that need

improvement. Effective aid delivery and coordination are being implemented

through the SWGs. Later, a section on the evolution of current coordination system

and follow by a section on the OECDDAC survey. The international development

agencies section will yield results from the interviews gathered by many expatriates

working in Laos. Lastly, the conclusion section will summarize the current status of

the coordination agenda in Laos.

4.7. Current ODA in Lao P.D.R.

Foreign aid is extremely important to the Lao PDR, financing 87% of the capital expenditure budget and 41% of the Government's total public expenditure in 2005/2006 [19]. The Lao government issued a Decree for ODA distributions (the

Prime Minister's Decree on the Management and Use of ODA No. 1467/MOFA/ DIC, 22 March, 2006). ODA inflows have doubled since 2000. Table 4.2 illustrate show ODA is incorporated in to the national expenditure plan of the Lao

government. These gradual inflows of aid has signaled for aid coordination needs and monitoring. The majority of ODA is grant aid from bilateral donors at 141.09 million US dollars, while international financial institutions offer loans of 126.71

million US dollars, in additions to other donors. ODA loans are short and long term which has obligations to be paid back to loaned institutions. Multilateral donors

offer only grant aid; totaled 42.86 million US dollars. In 2011, the grant aids reached 464 million US Dollars and loan financing was US$177 millions. (see

Table 4.2).

40

Table 4.2: Public Expenditure, Public Investment Program and ODA: 2000 to 2011

US$ Mil.

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

Item

354

Total Expenditure

341

406

330

438

514

682

822

1,133

1220

1668

1886

199

Current expenditure

106

162

138

167

248

362

577

679

805

867

986

155

Capital investment(PIP)

235

245

192

271

266

320

368

455

416

801

900

Of which:

96

- ODA

171

147

93

165

177

278

318

369

273

593

640

59

- Domestic

63

98

99

106

89

42

50

86

142

208

259

44%

PIP/Total expenditure

69%

60%

58%

62%

52%

47%

45%

40%

34%

48%

48%

62%

ODA/PIP (%)

73%

60%

48%

61%

67%

87%

86%

81%

66%

74%

71%

27%

ODA/Total expenditure (%)

50%

36%

28%

38%

34%

41%

39%

33%

22%

36%

34%

Note: Exchange rate conversion 2006 to 2011 = 8000kip/1$; ODA in 2010 and 2011 include borrowing.

Source: [19].

41

There are criticisms of bilateral aid being the most non-transparent form of foreign

aid, let alone tied. The Paris Declaration is the alternative solution to tied aid. Table 4.3

shows commitment for ODA to Laos, the figures are gradually adjusted according to real

disbursed amounts. There are concerns over the promised amount to be delivered to Laos

and the actual dispersed amount, see Table 4.4. Many loan agencies still use conditionality

in the amount of aid to be promised. However, there are certain development agencies that

are complying with the national plans.

Table 4.3: ODA Agreements Signed During Financial Year 2010/2011

US$ Million

Institutions

%

Grants

Loans

Total

Government Contribution Fund 1.732 0.04 0.09 0.39

83.6 63.32 15.77 6.55

58.04 0.00 0.00 0.00

143.37 63.36 15.86 6.94

22.75% 10.05% 2.52% 1.10%

0.00

36.51

0.00

36.51

1. International Financial Institutes 2. Multilateral 2.1. European Union (EU) 2.2. Mekong River Commission (MRC) 3. Non Governmental Organizations (NGOs)

5.79%

4. Bilateral

0.42

267.89

95.82

364.13

2.68

473.64

153.86

630.18

57.78% 100%

0.47%

75.16% 24.42%

100%

Total %

Source: (Committee for Planning and Investment, 2012)

The highly concentrated sector is the transport sector (111.5 million US$),

followed by agriculture and forestry (81.2 million US$), and education and human

resource development at about $US 72.9 million, because of poor road condition and

infrastructure building is essential for potential markets and investments. Meanwhile the

least concentrated sectors are Sports, and post-telecommunication.

Japan has always been Lao’s largest bilateral donor previously, offering aid at $US

130.68 million in 2011. Vietnam and China have been actively supporting the Lao

government on aid. Vietnam was noted as a recipient; however it is the fourth largest

bilateral donor for Laos assisting at $17.10 million in 2011 and China grants was 7.61

million US$ in 2011. Laos has been Vietnam’s market for their goods with competitive

41

42

prices on commodities in comparison to Thailand and China.

Table 4.4: Total ODA Disbursement by Sector, 2010-2011

Unit: Million US$

2010-2011

%

%

2011-2012 (Planned)

Poverty Eradication

37.72

6.01%

35.37

5.75%

Agriculture and Forestry

81.22 12.94%

64.65 10.51%

Industry and Commerce

45.10

7.19%

33.39

5.43%

Energy and Mines

54.53

8.69%

33.09

5.38%

Land Development

1.67

0.27%

2.87

0.47%

Public works and Transportation

111.48 17.77%

156.27 25.39%

Post--Telecommunication

0.06

0.01%

0.02

0.00%

Tourism

4.13

0.66%

2.56

0.42%

72.92 11.62%

65.70 10.68%

Education and Human Resource Development

Health

68.31 10.89%

45.92

7.46%

Labor and Social Welfare

25.51

4.07%

33.50

5.44%

Media and Culture

5.28

0.84%

2.74

0.45%

Gender Equality

2.42

0.39%

2.77

0.45%

Sports

0.07

0.01%

0.07

0.01%

Science and Technology

1.98

0.31%

1.74

0.28%

Unexploded Ordinance Clearance

2.05

0.33%

2.68

0.44%

32.23

5.14%

16.02

2.60%

Natural Resources and Environment Protection

Enterprise Development

2.12

0.34%

0.89

0.14%

Local and regional development

3.23

0.51%

2.27

0.37%

Governance

47.43

7.56%

42.58

6.92%

International and Regional Cooperation

4.37

0.70%

8.14

1.32%

Note: Data for some selected programs only (not all sectors)

42

43

Source: [20]

Table 4.5: Bilateral ODA Disbursement by Source (Country), 2010-2011

Country

Grants (Million US$)

%

130.68

48.78%

Japan

Thailand

9.33%

25.00

Australia

8.18%

21.92

Vietnam

6.38%

17.10

Luxembourg

5.70%

15.28

Switzerland

5.23%

14.00

Korea, Republic

3.57%

9.56

Germany

3.21%

8.61

China

2.84%

7.61

Finland

2.39%

6.40

France

2.32%

6.22

Sweden

1.34%

3.59

Norway

0.72%

1.92

New Zealand

0.00%

0.00

100%

Total

267.89

Source: [20]

It is important to improve aid because the Lao government has presented a range of

priorities in the NGPES, 2006 - 2010. It is intended to guide progress towards the

country’s development goals which takes a considerable amount of resources that the

government is able to mobilize. External assistance is a must both financially and

technically in order to achieve those set goals.

43

44

4.8. Effort of Government of Lao PDR

The government of Laos has given the role for aid coordination to the Department

of International Cooperation placed in the Committee of Investment of Planning which is

equivalent to the Ministry level of delegations. This department has divided into five

different Divisions: UN agencies, Asia and Pacific, Europe and America, International

Financial Institutions and Monitoring Division. Each division manages aid in accordance

to the donor’s geographical locations. The monitoring section has the overall role in

keeping track of all ODA inflows into Laos as well as monitoring the operations and

implementations of aid within Lao PDR.

The Round Table Process (RTP), or the Round Table Meetings (RTM) is a process

led by the Government of Lao PDR in the CPI which the Department of International

Cooperation coordinates the RTP. It receives guidance from the National Steering

Committee which is chaired by the Prime Minister. The RTP in partial supports

financially and technically by the UNDP (The National Round Table Process, 2007).

Although there are unclear policies on how to distribute aid, the government has based

their poverty reductions effort by using foreign aid, and setting the national priorities in

the National Growth and Poverty Eradication Strategy (NGPES). DIC uses tools for

guidance in the ODA coordination system that consists of: Part I the National Growth and

Poverty Eradication Strategy. The NGPES as mentioned earlier acts a strategy paper of the

government for the next 5 years plans with focus in poverty reduction. It became the focal

point of where ODA should be spent and how it can contribute to the overall government

national budgets. It outlined various parts. Part one focuses on the national growth and

poverty eradication strategy. Setting goals and priorities and enabling environment for

growth and development. This includes the role of government and governance issues.

The government focuses on the NGPES’ operational framework of: agriculture and

forestry development, education and health, infrastructure development, just to name a

few. Rural and poor district has been appointed to be focused by using the Thammasat

ways of development; this means the natural way of development without using too many

westernized concepts. Mobilization of resources will come from ODA and government

inputs.

44

45

Part II of NGPES overlooks at poverty assessment in Lao PDR. The NGPES also

assess the poverty situation of Laos in order to make plans to reduce it. Analysis of the

cause and the outcomes and possible effect it may have once development has been

implemented. Part III focuses on the strengthening in the overall environment for

sustainable growth and development. Part IV oversees the national sector plans to

promote sustainable growth and poverty eradication while part V is looking for ways to

mobilize and allocate resources to match with outlined priorities.

The second tool for ODA coordination use is the Data base system or called

ACMS. The monitoring system is managed by Monitoring and Evaluation Division of the

department in the DIC. The system is piloted into line ministries and two major provinces.

Although in theory it is piloted into the provinces, in practice it is still far from being

effective. The information is provided based upon project managers, which are

government officers. The project managers will need to complete two forms of: (a).

Project Work Plan (PWP) and (b) the Project Implementation Report (PIR). These are

developed into what is called the ACMS database system. The two tools for monitoring

information are also drawn from the PIP. PIP is government budget which represent

expenditure programme which ODA’s accumulates on average four-fifths of total national

expenditures. Table 4.1 shows enormous contributions and plays an important role in

relation overall public expenditures and PIP.

UNDP has been providing support in the terms of technical assistance and financial

resources through the RTM project to develop the ACMS database. The information on

(c) Project Information Sheet (PIS) is extracted directly from ODA grant and loan

agreements by the staff of this division. This information is kept in the ACSM database

system which is shared with other departments of General Planning in order to facilitate

the preparation of the Annual Plans and Budgets. Thus monitoring and evaluation on aid

effectiveness consists of total three different instruments mentioned above.

4.9. Coordination in Practice

The Round Table Meeting has mandate to support the Vientiane Declaration which

is a step up towards aid effectiveness effort. Later a Country Action Plan (CAP) was

published for implementation purpose in more practical detail based upon the Vientiane

45

46

Declaration.

RTM in practice is rather more scattered and unorganized. The official structure of

the RTM does not contain other groups that coordinates amongst themselves. They are

informal groups displayed in Figure 4.2. These groups were formed previously to the

structure and do not require to be abolished. It illustrates an informal structure of the

Round Table Meeting that includes SWG and other coordination. The informal groups

consist of (SWGs, 2007):

1. Avian Influenza

2. Public Expenditure Management Strengthening Programme (PEMSP)

3. Poverty Reduction Support Operation (PRSO)

4. Three Sub Groups from the SWG of Agricultural, Rural Development &

Natural Resources Management

5. Mini – Dublin that stems from SWG’s Drug Prevention

6. Others, MDTF (forthcoming)

4.10. Sectorial Working Groups (SWGs)

The SWGs structure was very formal and left out informal groups as mentioned

above. There are still concerns over the SWGs on how well is it working and how can it

be strengthened. The findings and recommendations for the current system are not

meeting the needs of either government or partners. It reflected in very small numbers of

SWGs meetings that have actually taken place over the past 12 months. The line

ministries were dissatisfied with a “blue print” approached, due to the lack of

understanding of the potential benefits of the vigorous SWGs. In addition, to the lack of ad

hoc technical support makes it difficult for Chair Ministries to organize SWGs work.

The recommendations from the Review of the SWGs Mechanism have proposed

the followings:

1. Reinforcement of Ownership of SWGs.

2. Increase the ratio of technical to political level meetings.

3. Integrate other ad hoc groups (informal groups) and to strengthened SWGs

Mechanism.

4. Rights to the eight groups that is the necessity of the SWGs for energy and

46

47

mining. The review of continuous effort to improve SWGs, it continues to recommends.

5. To clarify roles and responsibilities of SWGs. That includes the linkages in the

NGPES and the subgroups that stems from the SWGs. While most sectors still needs

improvement in medium term strategy and its policy. The CAP and ODA tracking still

lack standard reliable data and development of a capacity development framework.

6. The commitment to capacity development is critical to effective SWGs; there are

still evidence of donor driven approach in the development community. Agendas are still

not very well shared and require much secretarial support.

7. Reinforcing linkages between SWGs and the RTP.

The current status of implementation for sector groups are; The Ministry of

Education and Ministry of Transport. They have already planned what they want to do for

the coming years and what they want to do now. The Ministries are leading the

implementation however the problem now is that the donors are not giving up their agenda

and the issues of ownership are yet to be resolved. The donors are still using their usual

ways of aid delivery, which are in line with their own mandates and their own foreign aid

policies. The usual way of aid delivery would be that the donor would approach

government and advise a given period of 4 to 5 years plan and implementation would be

set up and lead the plan. Donors would have full control of the financial role,

administration and offer technical expertise. They would deliver these programs and then

leave these projects behind.

4.11. Evolution of Current Coordination System

The overall structure in Figure 4.3, illustrates the overall system of how aid is being

coordinated in Laos from the government side and from the donor’s initialization. The left

hand side of the figure illustrates at the international level what the donors are doing and

their initiative for countries to be involved. From the high level forum in Rome in 2003 at

a global level and followed by the Luangprabang meeting in February 2005 from the

government effort to coordinate aid. That was left behind by the time the Paris Declaration was announced in March 2nd, 2005. Notice there are no direct linkages to the government

that is displayed on the right hand side of Figure 4.3.

The right hand side of this figure however displays the role of the Lao government

47

48

and the involving entities. As mentioned, the DIC uses three different instruments to

monitor progress and NGPES for guidance to manage aid. The RTM November 2006

works in 3 tiers at the working level after Vientiane Declaration. The working level starts

at:

1. Secretariat – this group has the role in drafting official documents; composed by

UNDP, EC, DIC, CPI, and Ministry of Finance.

2. Task force – this group will technically discuss the draft and propose changes

(amendments) which was the government side, DIC, CPI and 4 ministries including all

Donors in practice Japan, WB, Australia, EC, France.

3. High level forum – meeting at ambassador level, a group started process

endorsing process, and endorse the action plan when it was finalized.

The coordination structure has left out several important issues on the aid

effectiveness agenda. The coordination mechanism has left out the provincial aspect,

because the structure is too centralized. Since most development projects are done in the

provinces, the government does not have a clear plan on how to coordinate aid at

provincial level. This is also for the reason that localization is still new and the system is

not yet entirely in place. There is limited capacity at the provincial level with the local

government officers, funding for training to monitor projects or even managing

development projects is still some distance away.

48

49

GOVERNMENT

Rome High Level Forum February 2003

CPI/Department International Corporations: (UN/Asia Pacific/European & America/Financial Institutions/Monitoring Section)

LuangPrabang Meeting Harmonization & Alignment February 2005

Tools: 1. NGPES 2. DATA BASE SYSTEM (instruments) (a) PWP (b) PIR (c) PIS

Paris Declaration 2nd March 2005

Round Table Meeting Aid Effectiveness Agenda is COORDINATED through the RTM process. UNDP has a mandate to support the government through the processes. 1. The secretariat 2. Task force 3. High level Forum

Vientiane Declaration 29th November 2006 (Instrument 1)

(RTM-Mandate to implement CAP)

Country Action Plan CAP February-May 2007 (Instrument 2)

Sector Working Groups: (SWG) Ministry of Health Ministry of Education Ministry of Agriculture Infrastructure Building Macro-Eco & Private Sector Development Governance Mines Action/UXO Drug Control Other informal groups, etc

Piloted 2 Provinces

OECD DAC Survey (Instrument 3)

Figure 4.3: Aid Coordination in Lao PDR

4.12. OECD DAC Survey

The OECD DAC Survey [64] forms parts of the monitoring tool for overall aid

effectiveness effort of the Paris Declaration. The Ministry of Foreign Affairs has

published a monitoring report that took a survey period of 12 months, October 2005-

September 2006. The purpose of this survey was to monitor aid effectiveness at local level

to reflect the global level on aid effectiveness progresses. This is different from the Lao

government monitoring system. The DIC was previously based in the Ministry of Foreign

Affair (MOFA) for the monitoring period however it was later relocated, and is now

49

50

currently back to the Committee for Planning and Investment (CPI). This caused much

needed information to be missing and results were not too impressive.

During the Survey, many of the respondents expressed their views on the different

questions and the difficulties they were experiencing in answering them. The main

concerns were:

1. Time consuming task: many development partners’ staff at country offices is

limited and specialized teams who were able to commit sufficient time and the survey was

not a priority. Furthermore, there was a lengthy progress in deriving data from

headquarters.

2. Ambiguity of several of the terms used in the survey questions.

3. Absence of data: results gathered from the survey are mostly estimates as many

agencies do not keep data filed. Such as missions to Laos.

4. Many agencies still use their own reporting system. Some partners emphasized

that many records are not very well kept in detail and resulted a rough estimation.

Many recommendations were provided

in order

to acquire good results

preparations for the next OECD DAC monitoring survey. However, because the process

became to be too complex and time consuming for development partners which involves

too many documents. There were many repeating questions to be answered from the

indicators questions of which some were already responded to from the Task Force

documents. There were many terminologies, confusion such as missions, technical

cooperation, country analytic work, etc. Therefore the interpretations became unclear

when translated in to the Lao language. Despite the low priority of the Survey many

indicators (monitoring indicators in the Survey) are used as several benchmarks for the aid

effectiveness Action Plan and will be a primary source to assess the targets. Very few

respondents provided qualitative comments and many did not respond to the Survey. This

would jeopardize the completeness and accuracy of the ODA picture in the country. After

the Paris Declaration, an effort was taken to localize at country level. The Vientiane

Declaration was born and the Country Action Plan was established between February and

March 2007. The odd thing about this was that the OECD DAC was carried out before the

actual process of localizing the Paris Declaration was finished. In addition to this, the

survey took one year to finish compilation, and the actual production of the report was

50

51

submitted in mid 2007.

4.13. International Development Agencies

The following field research interviews were held with numerous international

development agencies namely; UNDP, World Bank, bilateral donor such as Sida, NGO

(SNV), European Commission. The interview questions are drafted around the following

questions (see Appendix 3). 44 questions divided into 7 groups:

Section I: Overview about ODA Coordination System

Section 2: Purpose of Development Partner Coordination Units

Section 3: Roles and Responsibilities of Development Partner Coordination Units

Section 4: Organization of Development Partner Coordination Units

Section 5: Financing

Section 6: Strengths and Accomplishments

Section 7: Challenges

The field research provided a real and practical insight on how the aid effectiveness

agenda is organized in practice. Talking to people who are involved with this agenda

revealed interesting outcomes. Although there were challenges during field work, it was

politically sensitive and timing difficult. There were local festivals which were followed

by the national holiday and the Lao government was hosting FRACAPHONE Summit

which nearly paralyzed most of the activities. The government gave a lot of priority to

large events which triggers the closing of most working offices in Laos. Understanding the

local protocols is essential when working with a very conservative government and

mentalities.

Field research interviews with various international agencies held surprising

results. The interviewees were mostly with large international development organizations

based in Vientiane namely; The World Bank, UNDP and European Commission.

However there were other smaller informal meetings with old colleagues from local

NGOs such as SNV and donor country representatives from Sweden/Sida.

Aid effectiveness is rather a new agenda, as coordination of aid confuses the

development community. From what has been gathered during interviews with expatriates

51

52

working in Lao PDR, the expatriates seem to have a relative understanding of what the

components of aid coordination are, meaning what the government is trying to do. The

issues are not just what the government can do to coordinate aid, but what can

international development communities do to support those efforts. Although there are

already examples of combined effort and projects, the progress seems too slow and there

are always continuous concerns of whether the Lao government could meet several

deadlines that they signed up for, hence the MDGs and the Paris Declarations.

It is not just the matter of local government capacity, although UNDP has been

technically supporting the strengthening capacity of the Lao government. The problems

are also the international competency of international expertise. Most of the interviewees

were young expatriates who have direct delegations from the seniors or from their

headquarters. The EU representative explained that he agrees with the local government

and support government coordination effort. However, the field staffs still have to consult

with the headquarters let alone their policy for aid delivery for Lao PDR. They have to

work within guidelines that are sometimes not flexible and causes for process to slow

down. In December 2007, the EU held a workshop on aid effectiveness, a prospective

approach facilitated by a so called expert from the head quarter. A suggestion for the Lao

government to consider changing from the current system as the EU felt strongly that they

are proposing a better approach. This matter was later raised by other interviewees that it

caused so much more confusion. There is already big gap between the headquarters and

the field offices.

The EU representative later provided additional explanation of the workshop that it

wanted Laos to have additional forum so that development community can come together

to discuss, a more practical approach to aid coordination. Now a plan encouraging for

capacity development and have been trying to support forum meetings. The next step is to

expedite aid effectiveness project where there should be a forum where development

community can actually talk about actions plans and monitor and sharing what has been

done, who is doing what? Which targets could be achieved? What are good actions and

target? Currently there is no follow up and monitoring. The workshop eventually had little

value of importance and the government proceeded with the same plan. The WB

expressed their concerns for development agencies to not confuse the government more

52

53

with the system because it is already a difficult process.

The EU interviewee further added that the aid effectiveness agenda has always

been viewed as separate program rather than incorporating within the program systems.

Moving from small projects to general budget supports funding directly to government

budget and involve into bigger sector working group has always been challenging.

The UN agency was rather different from the other interviews simply because of

their organizations operations is much larger and more complex. Due to large

organizational existence, UN agencies particularly have to coordinate within themselves

lead by the UNDP. The interviewee expressed her concerns over task allocations. There

seems to be too many rotations on jobs. From her position, there was a constant hand over

of jobs which handle the aid coordination support. This action has caused delays for new

staff to understand the entire picture of aid coordination in Laos for effective support

needed from DIC. This is one of the classic examples of poor decision making from

technical agencies.

The interviewees agreed that there are unclear approaches from the government in

having multiple meetings. This could be made easier if there is a centralized forum and

address issues once. This is to eliminate the separate discussions with different agencies

and donors and it will lower transaction cost for everyone. Interviewees further expressed

that the requirements to improve aid delivery starts from having more government

ownership by stepping down and setting clear priorities. The country budget had been

dependent on aid and experiencing a comfortable situation for partner agencies as well. It

was shown that it is much wiser to move quickly into projects that are multi donor

projects, so that government officers working in these projects could just harmonize by

not having multiple reporting systems to different donors. International development

community should support government requests to clearly indicate in transparent manners

from the unclear priorities. There are changes seen in the donor communities but it can be

seen that donors don’t entirely understand it. Both partners have limited capacity for the

agenda and need to improve on it.

53

54

Figure 4.4: Current Structure of the SWGs and Other Coordination Force (SWGs, 2007)

54

55

CHAPTER 5. POLICY IMPLICATIONS FOR POWER SECTOR DEVELOPMENT

5.1. Projection of Energy Demand in Lao PDR

The projection of energy consumption in the Lao PDR in this section is divided into

three regions: North, Central, and South. The Northern Region consists of Phongsaly,

Luangnamtha, Oudomxay, Bokeo, Luangprabang, Houaphan, Sayaboury, and

Xiengkhuang provinces. The central region consists of Vientiane Province, Vientiane

Capital City, and Borikhamxay Provinces.

The Southern Region consists of

Khammouan, Savannakhet, Salavanh, Xekong, Champasack and Attapeu Provinces.

5.1.1. Northern Region

The projection of Northern Region energy demand is calculated from the previous

energy consumption and projection of residents marginally increases. The non-

residential energy consumption includes the demand for rail road construction, the

operation of rail road after the construction completion, detail demand for mining

industry, and others. It is forecasted that the energy demand will increase by 21.9% per

year, and the peak load of 17.7% a year.

Table 5.1. Northern Region Electricity Demand Forecast

Growth Rate

Description

Unit

2010

2011

2015

2020

(%)

2010-

2010-

2015

2020

Electricity

GWh

246.9 890.1

2,505.2 1,826.6 58.9% 22.2%

demand

(excluding

system loss)

System Loss

GWh

37.1

129.6

322.8

230.2

55

56

%

13.1% 12.7%

11.4%

11.2%

Total Demand

GWh

284.0 1,019.7 2,828.0 2,056.8 58.4% 21.9%

(including

system loss)

Peak load

MW

65.9

188.0

497.5

336.0

48.7% 17.7%

Load Factor

%

49.2% 61.9%

67.3%

69.9%

Figure 5.1. Energy demand in Northern Region

The chart above shows the peak load demand in the northern part of Laos from

2010-2020. The demand for residence constantly increases while the non-residential

electricity demand increases sharply during 2014 and 2016.

5.1.2. Central Region

The forecast of electricity demand in the central region is based on the constant gradual

increases of residence while the non-residence electricity demand is based on the railway

construction, railway operation, steel factory and additional cement factory in Vangvieng.

The detail is shown in the table below.

Table 5.2. Central Region Electricity Demand Forecast

56

57

Description

Unit

2010

2011

2015

2020

Growth Rate

(%)

2010- 2015

2010- 2020

GWh

1,413.9 1,721.2 4,360.0 6,307.5 25.3% 16.1%

Electricity demand (excluding system loss) System Loss

258.4 13.1%

549.5 11.2%

752.9 10%

GWh % GWh

220.8 13.5% 1,634.8 1979.6 4,909.5 7,060.4 24.6% 15.8%

MW %

321.7 58.0%

375.8 60.1%

884.2 63.4%

1,274.9 22.4% 14.8% 63.2%

Total Demand (including system loss) Peak load Load Factor

Figure 5.2. Central Region Electricity Demand Forecast

Residence;

Non-residence;

Total

The table and figure above show the electricity demand peak load in the central

region from between 2010 and 2020. The figure shows that the demand in residences

constantly increases while the non-residence demand increases rapidly from 2012 and

2018. 5.1.3. Southern Region

57

58

The demand forecast for electricity in the southern region is based on the previous

consumption as constantly increases while the non-residence demand refers to the

exploration and mining of aluminum factory of SLACO which needs approximately

900 MW in phase one, 1800 MW in phase two, and subsequently 3600 MW. The

demand is the most influential factor; therefore, the table below presented the demand

forecast in two scenarios: without SLACO and with phase one of SLACO. The result

of the forecast is shown in the table below.

Table 5.3. Southern Region Electricity Demand Forecast (without SLACO)

58

59

Rate

Description

Unit

2010

2011

2015

2020

Growth (%) 2010- 2015

2010- 2020

GWh

887.3

1,034.2 3,208.6 5,380.2 29.3% 19.7%

Electricity demand (excluding system loss) System Loss

493.0 13.3%

736.6 12.0%

185.2 15.2%

GWh % GWh

160.7 15.3% 1,048.0 1,219.4 3,701.5 6,116.8 28.7% 19.3%

Demand Total (including system loss) Peak load Load Factor

MW %

196.2 61.0%

222.6 62.5%

589.4 71.7%

977.5 71.4%

24.6% 17.4%

The table above shows that the demand of electricity in the southern region

increases at an average of 19.3% per year between 2010 and 2020, with the peak load

of approximately 17.4% per year.

Figure 5.3. Electricity demand forecast in southern region (excluding SLACO)

Residence;

Non-residence;

Total

59

60

The chart above shows the peak load of electricity demand in the southern region

from 2010 to 2020, which classifies the residential and non residential demand. The

non-residential demand includes the mining exploration and processing, hydropower

dam construction, and other industrial factories. The result of the forecast shows that

the demand for residence gradually increases while the demand for non-residence

sharply increases between 2014 and 2016, and remain relatively constant afterward.

This scenario excludes the demand of electricity by SLACO.

Table 5.4. Southern Region Electricity Demand Forecast (with SLACO phase one)

Description

Unit

2010

2011

2015

2020

Rate

Growth (%) 2010- 2015

2010- 2020

GWh

887.3

1,034.2 11,388.9 12,191.6 66.6% 30.0%

Electricity demand (excluding system loss) System Loss

1,472.9 10.8%

1,459.7 11.4%

185.2 15.2%

GWh % GWh

160.7 15.3% 1,048.0 1,219.4 12,848.6 13,664.5 65.1% 29.3%

55.0% 25.5%

1,757.3 83.5%

1,894.3 82.3%

196.2 61.0%

222.6 62.5%

MW %

Total Demand (including system loss) Peak load Load Factor The table shows that the demand of electricity in the southern region between 2010

and 2020 has an average growth of 29.2% per year and the peak load demand is

approximately 25.3%.

Figure 5.4. Electricity demand forecast in southern region (including

SLACO)

60

61

Residence;

Non-residence;

Total

The above figure shows the electricity demand in the southern region between

2010 and 2020, which includes the residence and non-residence. The non-residence

covers electricity demand in mining exploration and processing, hydropower

construction, and other industrial factories. The result of the analysis shows that the

residential demand gradually increases while the non-residential demand increases

sharply between 2014 and 2016. 5.1.4. Total Demand for the whole country

The projection of the demand for the whole country covers the result of the projection

in different parts of the country. Due to the analysis of the southern region is divided

into two scenarios, the projection for the total demand is also divided into two

scenarios.

Table 5.5. Whole Country Electricity Demand Forecast (without SLACO phase one) 2010

2011

2020

2015

Unit

Description

Rate

Growth (%) 2010- 2015

2010- 2020

GWh

2,548.1 3,645.5 10,073.7 13,514.3 28.9% 15.7%

Electricity demand (excluding system loss) System Loss

GWh %

418.6 14.1%

573.1 13.6%

1,365.3 11.9%

1,719.7 11.3%

61

62

GWh

2,966.8 4,218.6 11,439.0 15,234.0 28.3% 15.3%

25.5% 14.2%

1,953.0 66.9%

2,588.4 67.2%

583.8 58.0%

786.4 61.2%

MW %

Total Demand (including system loss) Peak load Load Factor The table shows the total electricity demand for the whole country from 2010 to 2020.

The total demand increases at an average of 17.8% per year and the peak load demand

is approximately 16.1% per annum or approximately 200 MW per year.

Figure 5.5. Electricity demand forecast in the whole country (excluding

SLACO)

Residence;

Non-residence;

Total

62

63

Table 5.6. Whole Country Electricity Demand Forecast (including SLACO phase one) Description

2011

2020

2010

2015

Rate

Unit

Growth (%) 2010- 2015

2010- 2020

GWh

2,548.1 3,645.5 18,543.3 20,663.7 48.7% 23.3%

Electricity demand (excluding system loss) System Loss

2,491.7 10.8%

2,359.5 11.3%

573.1 13.6%

GWh % GWh

418.6 14.1% 2,966.8 4,218.6 20,904.7 23,155.4 47.8% 22.8%

40.3% 19.8%

3,173.9 75.2%

3,561.8 74.2%

583.8 58.0%

786.4 61.2%

MW %

Total Demand (including system loss) Peak load Load Factor The above table shows the total demand for electricity from 2010 to 2020. The total

energy demand average increase is approximately 22.6% per year and the peak load

of approximately 19.6% per year or approximately 300 MW per year.

Figure 5.6. Southern Region Electricity Demand Forecast (including SLACO phase one)

Residence;

Total

Non-residence;

63

64

As a country condition of mountainously and rich of water resources, Lao

PDR is having 23,000 MW exploitable hydro power potential. With a quick

development of economic and government policy on attraction of the foreign

investment, those hydropower potential has been step to step developed for both

domestic consumption and export for country income generation. Continue of

economic growth is needed to alleviate poverty and achieve social development

goals but the policy options for achieving this are constrained by the small domestic

economy and limited trade opportunities. Therefore, hydropower projects are a

development opportunity for both local and central of Lao PDR in overall

development. The power policy of Lao government aim to establish a priority

policy of developing the country’s potential energy resources to provide a low cost

source of energy that can meet export and domestic policy objectives and promotion

of sustainable development.

The country now has installed power generation capacity of over 3,000 MW,

of more than 13 hydro power projects or about 6,000 MW are under construction

and more than 6,000 MW are under various stages of development by 2025, it is

expected that export would be 80-85% of developed capacities.

To transmit of those power there are a strategy of domestic and international

grid development where it can be divided into domestic interconnection (connection

of Northern to Southern part of Lao PDR) and regional interconnection (connection

of Lao PDR to neighboring countries for power exporting). The Memorandum Of

Understanding (MOU) was signed for supply of power between Lao and Thailand

are 7,000 MW and 5,000 MW between Lao and Vietnam by 2020.

Electricite Du Laos is a utility state own company that manage the power of

15% equivalent 385 MW, Private companies (IPP, SIPP) have 85% equivalent of

2,159 MW while Independent Power Producer Companies were built and are

operated by private sector joint-venture companies with Electricite Du Laos (EDL)

principally to export power to Thailand have 95.35% or equivalent of 2,059 MW

65

and Nam Lik 1-2 project were built and operated by Chinese SIPP to EDL for

domestic use, have 4,6% or equivalent of 100 MW. In addition, there is 0.05% or

equivalent 1.1 MW shared by Provincial Department of Energy and Mines.

Currently EDL is also import some power for domestic use where the area is close

to Vietnam border as EDL grid could not reached. The power system is provided

through 6 supply are of (1) Northern Supply Area (EDL), (2) Central C1 Supply

Area (EDL), (3) Central C2 Supply Area (EDL), (4) Southern Supply Area (EDL),

(5) Isolated Supplies (EDL/Provinces) and (6) Off-grid electrification

(Provinces/Private).

Lao government promote an investment cooperation of Vietnam investors for

development of hydropower Projects. There are 2 projects are now under

construction by Vietnamese investors and there are 13 projects are under several

stage of development as MOU, PDA. The total capital cost is expected to reach

4,163 Million US Dollars. Several interconnections to Vietnam grid system is also

being planning in northern, middle and southern of Lao PDR to connect to Vietnam

system (about 4 projects).

The investment of the power GOL has been highly appreciated to

Vietnamese Companies and Enterprises to mainly contribute to the Social

Economics Development in Lao PDR. The Investment of Vietnamese plays the

important roles in the infrastructure development as: electricity, access road,

schools ..., it completely changed the social economics in the provinces where the

projects are located. However, financing is the biggest obstacle faced by project

sponsors and so far only 2 projects being constructed.

The power sector in Lao PDR occupies a pivotal place in GOL’s strategy to

advance economic and social development. GOL has established a priority policy

of developing the country’s potential energy resources to provide a low cost source

of energy that can meet export and domestic policy objectives as stated in four

policy priorities below.

66

(i) maintain and expand an affordable, reliable and sustainable electricity supply

in Lao PDR to promote economic and social development;

(ii) Tap the country’s potentials aiming at promoting power generation for

export to provide revenues to meet GOL development objectives with

particular emphases on poverty eradication;

(iii) Ensure accountability and transparency of environmental and social

impacts and thereby achieve sustainable development;

(iv) Enhance and Strengthen the legal and regulatory framework to meet

requirement of international financing; streamline and institutionalize the

Lao power sector; effectively direct and facilitate power sector

development;

5.2. Broad Policy Objectives

GOL policy has given particular priority to development within the power

sector as a means of achieving macroeconomic and social goals. Power sector

policy calls for the development of two types of power projects to meet different

market requirements: Government policy on future power development divides

power generation projects into two types according to their different market

requirements and objectives.

The Government has been following a policy of developing the country's

hydro resources by undertaking smaller and medium projects for the domestic

market and large projects for export of power to neighbouring countries and for

adjacent local demand. The development of hydro resources for export of power to

neighbouring countries has being promoted by seeking private sector participation

in joint-venture IPP projects subject to equity participation by the Lao Government.

Preference is given to power developments, which have limited adverse

environmental impacts on the local population. Government policy on power

development divides power generation projects into two types according to their

different market requirements and objectives.

67

1. Domestic Generation Projects: Their principal purpose is to meet

domestic demand growth but can be brought on ahead of need to earn export

revenue. Domestic projects will range typically between 5 and 100 MW and will

continue to be developed by GOL. Small / Medium Projects (up to about

100 MW): For supplying the domestic market, either by servicing isolated loads or

feeding into the domestic grid systems.

2. Export Generation Projects: These projects will be implemented in Joint

Venture arrangements with IPP groups specifically to meet export commitments but

may also supply local demand in the vicinity of the project. The initial objective of

the IPP program is to implement the projects needed to satisfy international

obligations under the MOUs with Thailand and Viet Nam. An inventory of

additional projects is being developed to provide back-up and to meet additional

export demand anticipated in the medium to long term future. Medium / Large

Projects (greater than about 100 MW): For meeting export requirements and

adjacent local demand.

The Government has encouraged the extension of the national grid focusing

on provincial capitals and rural areas where feasible and development of off-grid

electrification. Overall the objective is to supply 90% of the population by 2020.

Financing and technical support is being provided through technical assistance (see

App 5&6).

Within the electrification program, the Government is considering to use all

appropriate technical and institutional options, including:

• Delivery systems grid extension, mini-grids, and disbursed systems

(Household or small community scale systems);

• Generation technologies-conventional hydro, mini/micro hydro, solar etc. • Institutional providers-public sector, private sector, community-based.

Implementation Models for Rural Electrification. As part of GOL’s

commitment to social and economic development in isolated rural areas, rural

electrification remains a high policy priority. A number of off-grid micro- and

68

mini-hydropower projects are in various stages of planning and implementation and

other forms of renewable off-grid supplies are being investigated. Such off-grid

projects are usually funded by bilateral arrangements with donor countries and

supported by other international organizations. A trial installation of a photo-voltaic

power supply is planned and, if feasible, could open the way for other such

investments.

Electrification is a high GOL priority. Various public and private sector

models for establishing grid extension and off-grid rural electrification schemes

were discussed with general agreement on a number of points, including:

• The economic and social importance of expanding the supply of electricity to

currently un served areas of Lao PDR,

• The need to insulate EDL from negative commercial effects of rural

electrification schemes;

• The potential for the private sector to play a beneficial role in both grid

extension and off-grid rural electrification schemes;

Domestic Energy Supply. With respect to the domestic power sector,

electrification within Lao PDR is among the lowest in Asia, and domestic energy

consumption is growing rapidly at 8% to 10% annually. Accordingly, power sector

policy focuses on the basic aim of making sufficient, reliable and affordable

electricity widely available. Consistent with this, the following objectives currently

influence policy in domestic market power development:

• Expand the EDL customer base through technically and financially

feasible extensions of the grids to incorporate un served population

centers.

• Create and expand industrial opportunities based on the availability of

low cost power.

69

• Augment the generating and transmission assets to satisfy demand

growth in the domestic grid. Domestic generation additions are typically

between 5 and 100 MW.

• Contract with IPP developers for the purchase of the local supply

entitlements (usually 5%) to provide least cost energy for domestic grids.

• Extend rural electrification through grid extension and off-grid supplies

to promote better socio-economic conditions within isolated rural

communities.

• Explore and exploit mutually beneficial power exchanges with

neighbouring countries for least cost supply to border areas.

• Reduce dependence on imported fuels for electricity generation by

substituting indigenous sources of energy.

• Reduce dependence on fossil fuels by promoting, where practicable,

renewable forms of electrical energy (solar, hydro, wind, biomass).

Transmission and Distribution parts:

- Transmission System: 115 kV transmission line is 3,313 km circuit. - Distribution System: 17,090 km circuits of medium distribution lines, and

13,722 km circuits of low voltage distribution lines/

- Substation: 115/22 kV substation is 30 sites. Total installed capacity is 1,044

MVA.

- Distribution transformers 780,188 sets, total installed capacity is 2,256

MVA.

Status of Power System

The status of Lao power sector development is summarized in Figure 5.1.

It is divided into four principal unconnected supply areas, and a number of smaller

supply areas. In addition, off-grid village and household systems provide electricity

to remote and isolated communities. Thus, electrification is provided through the

following six supply areas:

70

• Northern Supply Area (EDL) • Central C1 Supply Area (EDL) • Central C2 Supply Area (EDL) • Southern Supply Area (EDL) • Isolated Supplies (EDL/Provinces) • Off-grid electrification (Provinces/Private)

Northern Supply Area

No HV grid has yet been established in the northern part of Lao PDR. Two

of the main towns, Phongsaly and Luang Nam Tha, now have MV connections to

the Chinese grid. A more permanent solution will be provided by a 115 kV

transmission extension of the C1 grid from Luang Prabang to the three north-eastern

provinces of Oudomxai, Pongsaly and Luang Nam Tha. This line is being financed

by ADB under the second phase of its Power Transmission and Distribution Project

(PTD2) .

Sam Neua (Houphan Province) and Houay Xai (Bokeo Province) are

supplied as isolated supplies (refer (iv) below). Sam Neua are connected to the C1

grid at Xieng Khouang through the construction of a115 kV line under the third

stage of the ADB’s Power Transmission and Distribution Project

(PTD3).Electrification of the north by single circuit line from Luang Prabang . But

also connection to Muang La in Yunnan and Single circuit 115 kV line Xayaboury

– Hongsa – Bokeo (Houayxai) is included.

71

Figure 5.7

72

Central C1 Supply Area

Historically, the load in Lao PDR occurs predominantly in the Central C1

Grid which comprises a 115 kV transmission system connecting Vientiane, Luang

Prabang, Vangvieng, Pakxan, Xieng Khouang and Sayaburi. Single circuit 115 kV

reinforcements from Xayabury to Paklay to Non Hai and Single circuit 115 kV

reinforcements from Tha Lat to Non Hai.

115 kV interconnections link the C1 and EGAT grids at Phontong (Nam

Ngum 1), Thanaleng (Vientiane) and Pakxan. Hydropower generation for the C1

Grid is provided by Nam Ngum 1(150 MW, with Nam Song and Nam Leuk

diversions to augment energy),Nam Leuk (60 MW) and Nam Dong (1 MW).The

Nam Mang 3 hydropower project will contribute a further 35 MW when it is

completed in 2005.

Central C2 Supply Area

The Central C2 area includes two separate networks, eminating from Thakek

(C2.1) and Savannakhet (C2.2), each supplied by 115 kV interconnections with the

EGAT grid. Under successive World Bank projects, i.e. the Provincial Grid

Integration (PGI) and Southern Provinces Rural Electrification (SPRE 1) projects,

these networks are radiating out, electrifying villages and towns in rural areas of

Khammouane, and Savannakhet provinces. SPRE 1 includes about 52 km of 115

kV transmission line.

Reinforcement of domestic grid interconnection with Thailand at 115 kV

using existing river crossing Paksan – Bungkan and Thakhek – Nakhone phanom.

Under the current PPA between EdL and EGAT, EdL imports from Thailand at a

premium on its export price, effectively a transmission charge for wheeling energy

from the Nam Ngum/Nam Leuk plants through the EGAT system to the C2 grids.

Single circuit supply to XePon and nearby gold mine project .Double circuit

115 kV interconnection of the Central I, Central II and Southern grids as follows:

- Paksan – Nakha – Thakhek – Pakbo (Savannakhet)

73

- Champhone – Bangyo (Pakse)

Southern Supply Area

The Southern Grid services areas of Champassak,Saravane,Xekong and

Attapeu. The grid is supplied principally from three sources: from Xeset 1 (45 MW)

and Selabam (5 MW) (both run-of-river), and from imports from EGAT. Xeset 1 is

connected to Pakse and Ubon Ratchathani (Thailand) by a115 kV line and to

Saravane by a 22 kV line. The town of Attapeu (Attapeu Province) has an partial

supply with generation provided by the Houay Ho IPP project. As with the Central

Supply Area, the PGI and SPRE 1 projects have extended the Southern Grid further

into rural areas of Saravane and Champassak and this work will continue under the

new SPRE 2 loan.

Reinforcement of Central II and Southern grids by single circuit lines and

Extension of Southern grid south by single circuit from Banyo (Pakse) to Thakho

Isolated EdL Supplies

EdL is also responsible for the reticulation of electricity in a number of areas

isolated from the main supply grids. Some centers import supplies across

international borders through MV feeders. Sam Neua and Vieng Xai (Houphan

Province) are supplied by 35 MV feeders from Vietnam and Houay Xai (Bokeo

Province) is supplied at 22 kV from Thailand.

Other towns receiving isolated cross border supplies include Xe Pon

(Savannakhet) from Vietnam grid and Mouang Kenthao (Sayabury) from Thailand.

Whole sale import prices for these supplies vary; Thai imports are at the PEA price

for a large industrial customer while imports from EVN are charged at 6 ¢/kWh.

Retail sales in areas supplied from cross border connections are largely to domestic

customers and the EdL domestic tariff is currently below wholesale purchase prices.

The township of Attapeu is supplied partial from the Houay Ho IPP project.

Sometimes EdL is responsible for providing isolated supplies ,more cross border

connections are planned but in the majority of cases it is the relevant provincial,

district or village authority.

74

Off-Grid Supplies

Much of the country lies beyond the economic reach of the EDL’s grids and

off-grid development provides the only prospect of electrification form any isolated

rural communities. The Rural Electrification is responsible for a program of off-grid

electrification at a village and household level using micro- and pico-hydro, diesel

and solar technologies. Subsidy funding is mobilized from GOL and donor sources

and a Rural Electrification Fund to coordinate and channel contributions. A system

of licensing enterprises to provide off-grid services is being introduced.

Approximately 10,000 household installations have been completed or are

planned under this program. This is expected to grow to 150,000 by 2020. 5.3. Power Sector Policy

1. Maintain and expand affordable, reliable and sustainable electricity

supply to promote economic and social development. Electrification Ratio to exceed

90% by 2020;

2. Improve and expand transmission networks to support the

industrialization and modernization policy, and to integrate the power sector in the

ASEAN community through its power exchange programs;

3. Tap the country’s large hydropower potentials with the participation of

private developers;

4. Promotion of Renewable Energy to reach 30% by 2025 with reasonable

feed-in tariff.

5.4. Power Sector Strategy towards 2025

• Access to reliable modern power services: expand supply capacity,

enhance reliability and increase access;

• Explore all options: off-grid, cooperatives, pro-poor financing methods,

affordable life-line rates, sharply targeted subsidies;

• Sustainable Hydropower Development with focus on integrated water

resources management;

• Cross-border trade;

75

• Focus on areas with low access; • Improve affordability by improving supply efficiency & passing

efficiency gains to consumers;

• Access financing to make low-carbon alternatives affordable.

Figure 5.8.

76

Overall Strategy for Domestic Grid Development

At the intended Na Bong 500 kV substation, it is proposed that a 115 kV

substation also be constructed, with 230/115 kV step-down transformers . This

would be connected to the existing 115 kV grid, and will allow the transfer of the

5% of export power allocated from the Nam Ngum 2 and 3 projects to the domestic

grid near to the principal load centre of Vientiane.

The 230 kV double circuit export transmission lines from Nam Theun

Hinboun and Houay Ho Power Stations to Thailand pass close to the provincial

capitals of Thakhek and Pakse respectively. The establishing 230/115 kV

substations for reinforcing the future 115 kV grid is however expensive compared

to purchasing the modest energy requirement back over the 115 kV transmission

lines across the Mekong at both locations.

Similarly, part of the possible 500 kV grid developments for export – such as

the proposed 500 kV line from Savannakhet to Hatsan – could be used for domestic

grid reinforcement, although the substations would be expensive.

Interconnection between Areas

The power balances of the regions during peak based on the modified

generation plan have been considered to determine the requirement for

interconnections between the EdL Areas, this being a major objective of EDL’s

transmission line programme. Central I / Northern grid will be fairly well balanced,

with some export potential towards the end of the period over the period under

review.

Central II is an importer of power from Thailand, and Central I and the

Southern Areas net exporters. Even with the commissioning of Nam Theun 2, the

Central II grid will remain a net importer and the South remains both a net exporter

and the source of system reserves.

On the basis of the potential load flows alone it may be difficult to justify full

115 kV interconnections between the Central I, Central II and Southern grids in the

period up to 2020. However in terms of assuring the availability of reserve

77

generating capacity within the country (neglecting cross border links) the proposed

115 kV lines represent a logical development of the grid.

It should also not be forgotten that there is considerable uncertainty related to

the actual commissioning dates of IPP projects and the availability of their off-

takes. Under these circumstances an interconnected grid could also help mitigate the

effects on the domestic grid of any substantial delays or a north-south bias in the

actual implementation program achieved.

Regional Grid Development (GMS Interconnection )

Power trade among GMS countries has made significant advances in the last

decade or so. In 1990 the only significant international power exchange involved

the export of surplus power from the Nam Ngum 1 project to Thailand. Today, the

numbers of projects and interconnections have increased but, more significantly,

major power trade agreements are now in place committing Lao PDR, Thailand,

Vietnam, Cambodia, China, to exchanges of electricity with one or more of their

neighbors. A regional grid is emerging to facilitate this trade.

In the mid-nineties, the execution of bilateral inter-governmental power

trading agreements between GMS countries heralded an expansion in international

power exchanges within the region. Given the significant complementarities

between the power systems of the region, interest in the concept of system

integration has grown. Member governments have been cooperating in planning the

interconnection of their grids and in exploring regional power market possibilities. • For Lao PDR, the concept holds considerable promise. A regional grid would

provide the infrastructure to receive power from individual export projects and

deliver it to nominated power purchasers in neighboring countries. The length of

dedicated transmission lines would be reduced, boosting the economics of

projects, particularly those in the Se Kong basin.

• The large capital requirements for building the 500 kV system interconnections

are an obstacle. The implementation strategy is based to some degree on

78

coordinating transmission interconnections with the transmission infrastructure

of large export projects.

5.5. Recommendations

First, continue improve and secure of the stability politic climate, social

security because this is a very important to attract of the foreign direct investment.

To make sure that we can overcome this issues we have to increase role of party

leading in management, in the same time we have a open for democracy and

promote right of people and improve of the implementation of the government legal

set in to social and economic. We have to take care and solve all the social issues

particularly to the corruption, unemployment, poverty and labor conflict in all

business units that having foreign direct investment.

Second, improve and maintain the activities that can support of the

investment because development of the socio-economic there is a more need of

open investment into all sectors in higher. Therefore, all of the government agency,

concern sector in Lao PDR will have to contribute to improve and having a new

changing for each side thus this can catch up with the socio-economic development

both in Lao PDR and international, we need to open up a

communication/advertisement system, disseminate of information to investor on the

condition and opportunity of investment in Lao PDR, especially for the investors

that having a potential of financing and experience on the foreign investment aboard

for example: foreign investment company, international financing institute, business

investor group in each country. Improve capacity of the government agency and

sectors concerns that can support stronger on foreign investment, full set of system

and clear all of the obstructed to investment. Exploring of the experiences/lesson

learnt for promotion of the foreign investment in the region.

Third, improve management effectiveness to ODA and foreign direct

investment, make sure all instruction of the government are harmonized and fully

cooperation between central to local government, between ministries and sector

concerns with foreign direct investment, define clearly right, roles and

79

responsibility of all agencies, sector in resolve all issues that receive government

instruction, discussion and consultation between concerned ministry, sector from

central to local authority where the foreign direct investment projects are located

especially a mega projects.

Fourth, improve aid delivery and coordination in Laos. (i) a stronger

program based approach is necessary. This can be done through four criteria that

include responding to government priorities, implementation in partnership with

several donors to be involved and the effort to strengthen the government system

and using the system. (ii) a sector-wide-approach, should be implemented similar to

the program based approach but applied to a concrete sector. There is the example

of the Sectorial Working Groups that is currently ongoing but this is organized at a

Ministry level. For example, the World Bank agency is helping to prepare for its

first SWAP for the Ministry of Communications Transport Post and Construction in

the country. (iii) a direct budget support system is required. This is one component

being implemented which means ODA will go directly into the government budget.

The current example is the development of the Standard Operating Procedures and

Financial Management Manuals which are being prepared so that ODA funding

goes into this system with transparency. (iv) reduce the numbers of agencies

working in one sector to improve coordination of aid in Laos. There are currently

too many agencies involved which results in poor communication and high of

transaction costs. This is one frequently noted feature identified by many agencies

during field interviews. The government also suggests this to be one of the

important concepts to work well with agencies in order to improve important

decision making processes and clear communication between government and

donors.

Regarding the outlining of strategic Energy Development Plan undertook by

EDL takes into account the party’s socio-economic development plan, aiming at

reaching the expected national socio-economic outcome, with the expectation to

move this country away from being least-developed nation, keeping the macro-

economic growth steady with a good paste. Searching and researching for hidden

developmental resources and strengths in a greater detail, considering cooperation

80

with outsiders and taking advantages of all international facilitating factors in the

energy development mission. Layout methodology and measures for

implementation to eventually realized on the party’s strategic plan. All and all is to

supply the energy to the production sectors, businesses, the society and save the

energy up as a development capital through an environmentally friendly manner and

at the same time use natural resources, water and minerals in the most effective and

sustainable way.

The EDL’s energy development plan from now to 2020 is an amplification of

the energy development mission of the Ministry of Energy and Mines. It’s

objective is to expand hydropower production sources (dams), search for and use

other energy sources which are deemed to be friendly to the environment. Focus on

constructing planned transmission lines to meet the need of the people, to tightly

connect the electricity system to smoothen the socio-economic development for its

continuous growth. Keep attracting foreign investment, expedite and speed up the

agreed projects to lay ground for the future. EDL keeps the following policy in

mind:

1. EDL will invest in constructing some power plants 2. Buy energy from independent power producers whose production is for

domestic consumption (SPP/IPP) (d)

3. Buy energy from independent power producers whose production is for

export (IPP) (e)

4. EDL will continue to import energy in cases where tariff is affordable (the

best deal) and continue to exchange energy with neighboring countries.

5.6. Regional Coordination Effort

Apart from individual efforts by countries for aid effectiveness, the three

Mekong countries of Cambodia, Laos and Vietnam also coordinate amongst

themselves. The development triangle joint coordinating committee met for the

second time on 19th February 2008 in Cambodia. The representative Ministers

emphasized the need for development of the triangle area by giving the priority to

81

[63]:

1. Mobilizing internal resources of each country and to attract investment

into the development triangle.

2. Formulating special preferential policies for the development triangle.

3. Simplifying procedures to facilitate the flows of goods and people in the

triangle.

They pushed further to expedite concretization of the master plan for the

development triangle and further move to implement plans which Vietnam has the

coordinating for.

Electricity plays a crucial role in the national socio-economic development

agenda. Therefore, electricity sufficiency is seen to be a condition that smoothen the

socio-economic development. Energy exports have contributed enormously to the

national economy through the influx of foreign currencies.

Secretary committee of the Mekong River Commission (MRC) has estimated

that the possible capability in converting water resources into energy in the entire

country is about 18,000 MW (excluding the potentials from the mainstream

Mekong River) and some of these have been developed for use.

Because Lao PDR is located in the heart of the Greater Mekong Sub-Region,

it plays an important role through its land-linked nature as well as its high voltage

transmission lines development potentials. Therefore, the expansion of transmission

lines with the neighboring countries in the Asian sub-region is essential to develop

these potentials, in both domestic and sub-regional level, faster.

The Lao PDR national strategic plan states that Lao PDR will export

electricity to its neighboring countries such as Thailand, Vietnam and Cambodia:

Independent Power Producers’ (IPP) hydropower development plan for export

energy to Thailand from 2011 to 2020 has installed capacity of about 6,507 MW

and to Vietnam from 2011 to 2020 has total installed capacity of about 4,446 MW.

82

CONCLUSION

For Lao PDR, Official Development Assistance (ODA) is very important

mechanism to promote the potential of investment fund, technology, marketing,

management experiences, take part of job creation, increase of income level,

upgrade of country development level. Therefore, promotion and attraction of ODA

and FDI is become one of priority policy of party and government of Lao PDR.

Promotion of the ODA into Lao for development of important sectors; potential

sectors are essential necessary for current situation, especially for development of

energy sectors because this sector is an major part of country socio-economic

development; it is a necessary of living condition of the people, generate income

from export of surplus power from domestic use to neighboring country, creation

for income from job opportunity for workers. Together with those, it is also a factor

contribute to promote other sector development as well.

The purpose of this research is to find what is “effective aid coordination”

particularly drawing from the case study of Lao PDR and lessons from successful cases

and what possible recommendations for power sector development are. The study

explore extensive literature in aid effectiveness, with an in-depth interview with the

managers, leaders, practitioners etc. Information synthesis is used in to analyze the

data. It is proposed that a solution to the problem of poor delivery of ODA is that the

Lao PDR governement, in general and power sector, in particular must improve its

ODA spending systems and incorporate aid budgets into the national budget and

development plans. It is vital to encourage the Government of Lao PDR to lead their

own development agenda and support development according to local priorities.

The results suggest that it is not just a matter of coordinating aid effectively,

but the aid industry needs the right capacity and people to be involved. Capacity

building is much needed within the recipient national offices as well as many of the

international donor agencies. This would allow the local government to take the

lead and prioritize the commitments signed in the Paris Declaration, the Vientiane

83

Declaration and the Millennium Development Goals.

It is recommended by many practitioners that the number of agencies working

in decision making processes in the aid effectiveness agenda in Lao PDR should be

limited to reduce transaction costs and promote clear communication within the

development community. However different environments such as Timor L’Este,

suggests that civil society should be involved more and that donor agencies should

not take the lead in aid delivery.

The key point to be learnt is that ODA needs to enhance its efficiency through

the best use of limited resources, aligning with national planning, programming,

monitoring and reporting processes, strategic documents, and priorities. There

should be flexibility to establish and abolish donor coordination groups, avoiding

administrative overburden of public administration staff, while attempting to

comply with donor requirements, established systems and procedures for

programming of donor’s funds. The effective use of existing national planning,

monitoring structures, equipped with national leadership and ownership in aid

coordination should be taken into account.

For furthering the power sector, this dissertation suggests 4 solutions for the

Government of Lao PDR including (i) improve and secure of the stability politic

climate, social security; (ii) improve and maintain the activities that can support of

the investment; (iii) improve management effectiveness to ODA and foreign direct

investment; and (iv) improve aid delivery and coordination in Laos. Also, the

dissertation proposes some direct actions toward the neighbours in order to improve

potentials uses.

84

REFERENCES

1. A. McCarty and A.Julian (2009), Thematic study: The developmental

effectiveness of untied aid: evaluation of the implementation of the Paris

Declaration and of the 2001 DAC Recommendation on untying ODA to the LDCs,

Lao PDR country study, 12/2009 2. Abrahamsen, R. (2005). Blair's Africa: The Politics of Securitization and Fear.

Alternatives, 30 (1), 55-80. 3. ADB & UNIFEM. (2005). County Gender Assessment. Dili. 4. Aid Coordination and Aid Effectiveness, ECON Centre for Economic

Analysis, 1999 5. Aid Harmonisation & Alignment. (2003). Harmonization Initiatives. Retrieved

October 3rd, 2007, http://www.aidharmonisation.org/ 6. Aid Harmonization & Alignment. (2006). Joint Progress Toward Enhanced Aid

Effectiveness. Retrieved February 2nd, 2008, http://www.aid harmonization.org/. 7. Alesina, A. and Dollar, D. (2000), Who Gives Foreign Aid to Whom and

Why? Journal of Economic Growth, 5 (1), 33-63. 8. Arne Disch, Aid Coordination and Aid Effectiveness, Evaluation reports

8/1999, Norad 9. Aso, T. (2006). Speech by Minister for Foreign Affairs Taro Aso ODA:

Sympathy is Not Merely for Others' Sake, http://www.mofa.go.jp/ 10. Berthelemy, J.-C. (2005). Bilateral donor's interests vs. recipients'

development motives in aid allocation: do all donors behave the same? Hamburg:

University of Paris 1 Pantheon Sorbonne. 11. Boesen N, Dietvorst D. (2007). SWAps in motion: Sector wide approaches:

from an aid delivery to a sector development perspective. TRAIN DEV.NET. 12. BOND. (2006). Conflict Security, and official Development Assistance

(ODA): Issues for NGO advocacy, http://www.bond.org.uk/

85

13. Brzoska, M. (2008). Extending ODA or Creating a New Reporting Instrument

for Security-related Expenditures for Development? Development Policy Review, 26

(2), 1331-150. 14. Buiter, W. (2007). ‘Country ownership’: aterm whose time has gone.

Development Practice, 17. Pg 4-5. 15. Burnside, C. and Dollar, D. (2000). Aid, Policies, and Growth. American

Economic Review, 90 (4), 847-868. 16. Carlson, Somolekae, van de Walle, Foreign aid in Africa, 2004 17. CGD. Development Commitment (2007). to Index 2007,

http://www.cgdev.org/ 18. CIEM & JICA. (2003). Study on Donor Practice in Vietnam, Grant Aid and

Transaction Costs. Vietnam: JICA. 19. Committee for Planning and Investment (2007). Achievements, Constraints

and Future Direction with in the Implementation of the National Socio-Economic

DevelopmentPlan2006-2010. Vientiane: Committee for Planning and Investment. 20. Committee for Planning and Investment (2012), Lao PDR. 21. Cornell University Law School. (2002). U.S. Code collection.

http://www4.law.cornell.edu/ 22. Cox, A., John Healey, Hoebink, P. and Voipio, T. (2000). European

Development Cooperation and the Poor. London: MacMillan Press. 23. Duffield, M. (2001). Global Governance and the New Wars: The Merging of

Development and Security. London: Zed Books. 24. Dunkly, G.(2007). The Reality of Aid. London: Zed Books. 25. Easterly, W. (2006). The White Man’s Burden. USA: Penguin Books. 26. Embassy of Sweden. (2007). Sida’s comments to there view of SMGs

Mechanism. Vientiane: Sida. 27. Eyben, R. (2007). Harmonization: how is the orchestra conducted?

Development Practice, 17 (4-5.). pg 640-646.

86

28. Gasper, D. (2004). The Ethics of Development. From Econonomism to Human

Development. Edinburgh: Edinburgh University Press. 29. Geib, A. (2006). Making Aid Work. Finance and Development, Volume 43

(4),14- 17. 30. Gommes,R. (2006). Socio-Economic Snapshot. Dili: UNDP. 31. Government of Lao PDR & United Nations Country Team. (2006). United

Nations Common Country Assessment CCA Lao PDR. Vientiane. 32. Government of Lao PDR. (2000). The National Round Table Process.

Retrieved February, 29, 2008, fromhttp://www.rtm.org.la/index.php. 33. Government of Lao PDR. (2003). National Growth and Poverty Eradication

Strategy.Vientiane. 34. Government of Lao PDR. (2007) The National Round Table Process.

Retrieved March 3,2008, from http://www.rtm.org.la/SectorWG.php. 35. Government of Lao PDR. (2007). Foreign Aid Report 2005-2006. Vientiane:

Committee for Planning and Investment. 36. Government of Lao PDR. (2007). Support the Round Table Process.

Vientiane: Ministry of Foreign Affairs. 37. Hall, A. and Midgley, J. (2004). Social Policy for Development. London:

Sage. 38. Hjertholm, P. and White, H. (2000). Foreign aid in historical perspective. In:

Tarp, F. and Hjertholm, P. eds. Foreign Aid and Development: Lessons Learnt and

Directions for the Future. London: Routledge.

(2007). Destinations. Retrieved March3rd 2008, 39. Lonely Planet.

www.lonelyplanet.com/ 40. M 2 Presswire. (2000). Donors pledge support as Vietnam enters the

21stcentury, Dec15.pg 1-3. 41. M2Presswire. (2001). Foreign aid can promo teen during growth and reduce

poverty when countries ‘drive’ their own development strategies ‘çonditionality’

can not replace national commitment tore form process, Mar 28. pg 1-4.

87

42. Manning, R. (2007). Development Co-operation Report 2007. OECD Journal

on Development,9,1,pg.1. 43. Matt Waldman, Aid Effectiveness in Afghanistan, Oxfam International,

Afghanistan, 2008 44. McKay, J. (2004). Re-assesing Development Theory: Modernization and

Beyond. In: Kingsbury, D., Remenyi, J., Mckay, J. and Hunt, J. eds. Key Issues in

Development New York: Palgrave MacMillan. 45. Ministry of Foreign Affairs. (2007). Comments on Pre-Zero Draft Review of

government Sector Working Groups (SWGs) Mechanism. Vientiane: Department of

International Cooperation. 46. Ministry of Planning and Investment (2004) Harmonization, Alignment for

Greater Effectiveness. Hanoi. 47. Ministry of Planning and Investment. (2002). Ministry of Planning and

Investment: Official Development Assistance. Retrieved February 2nd 2008),

http://www.mpi.gov.vn/ 48. Ministry of Planning and Investment. (2005). Hanoi Core Statement on Aid

Effectiveness. 2008, http://www. aid harmonization.org/ 49. Ministry of Planning and Investment. (2005). Update note on Harmonization

and Aid Effectiveness for the Mid-Term consultative Group Meeting 2-3/06/2005.

Hanoi: Ministry of Planning and Investment. 50. Ministry of Planning and Investment. (2006). Development Assistance Data

Base Vietnam: Building Partnership through Information. Hanoi: Ministry of

Planning and Investment. 51. Norad. (2007). Review of Development Cooperation in Timor L’Este, Oslo:

Norad. OECD& World Bank. (2005). Harmonization Alignment, Results, Progress

report on aid Effectiveness. Paris: OECD Publishing. 52. OECD (1998b), United States. Development Co-operation Review,

http://www.oecd.org/ 53. OECD (1999). Japan: Development Co-operation Review. Paris: OECD.

88

54. OECD (2008), Survey on monitoring the Paris Declaration: Making aid more

effective by 2010, OECD 2008 55. OECD. (1996). Key points emerging from the DAC review of development

Challenges and the role of development cooperation in the three Mekong countries

in transition: Laos, Vietnam, and Cambodia: Paris: OECD Publishing. 56. OECD. (2003). DAC-OECD Working Party on Aid effectiveness and Donor

Practices. Retrieved October 3rd, 2007, http://www.aidharmonization. org/ 57. OECD. (2005). Next Steps: Paris Declaration on aid effectiveness, 2007,

http://www.oecd.org/ 58. OECD. (2005). Paris Declaration Aid Effectiveness. Retrieved February 2nd

2008, http://www.oecd.org/ 59. OECD. (2005). The Paris Declaration. Retrieved October 3rd, 2007,

http://www.oecd.org/ 60. OECD. (2006). Harmonizing Donor Practice for Effective Aid Delivery. Paris:

OECD Publishing. 61. OECD. (2006). Operational Indicators of Aid Effectiveness. Retrieved

October 12th, 2007, http://www.oecd. org/ 62. OECD. (2007). Preliminary Findings from the 2006 Base line Survey on

Monitoring the Paris Declaration. The DAC Journal.8.1.pg59-128(3). 63. OECD. (2008). Overview of ODA. Retrieved March, 31 sr, 2008,

http://oda.mpi.gov.vn/ 64. OECDDAC. (2004). Harmonization and Alignment for Greater Aid

in Vietnam Report 2004. Retrieved March 2nd, 2008, Effectiveness

http://www.oecd. org/ 65. OECDDAC. (2007). OECDDAC Survey Monitoring the Paris Declaration on

Aid Effectiveness. Vientiane: OECD Publishing. 66. Otter, M. (2003). Domestic public support for foreign aid: does it matter?

Third World Quarterly, 24 (1), 115-125.

89

67. Paris, R. (2001). Human Security: Paradigm Shift or Hot Air? International

(2005).Vietnam Implemented the Paris declaration on Aid Security, 26 (2), 87-102. 68. PGAE.

Effectiveness. Retrieved March21st, 2008, http://oda.mpi.gov.vn./ 69. Results report 2007: Norwegian aid works – but not well enough, January 2008,

Norad. 70. Rita Abrahamsen, Blair's Africa: The Politics of Securitization and Fear,

Alternatives: Global, Local, Political January 2005 30: 55-80, 71. Robinson, S. and Tarp, F. (2000). Foreign aid and development: Lessons

Learnt and Directions for the Future (In: Tarp, F. and Hjertholm, P. eds. Foreign

Aid and Development. London: Routledge). 72. Roger Riddell, Does Foreign Aid Really Work? Oxford University Press, UK,

2007 73. Rostow, W. (1960). The Stages of Economic Growth: A non-communist

manifesto. London: Cambridge University Press. 74. S.Lister, M.Stevens (1992), Aid Coordination and Management, World Bank 75. Saches, J. (2005). The End of Poverty. USA: Penguin Books. 76. Sachs, J. (2006). Foreign Aid Skeptics Thrive on Pessimism. Retrieved August

5th, 2007, http://www.latime.com.news.opinion.commentary 77. Sachs, W. (1992). The Development Dictionary: A Guide to Knowledge as

Power. London: Zed Books. 78. Sen, A. (1999). Development as Freedom, Oxford: Oxford University Press. 79. Shah, A. (2008). US and Foreign Aid, 27th April, http://www.globalissues.org/ 80. Shaw,J. (2007). UN Coordination in the context of Integrated Mission. Dili:

UN. 81. Socialist Republic of Vietnam. (2001). Decision of The Prime Minister of the

Government on the Issuance of the Regulation on the Management and Utilization

of Aid from International Non-governmental Organization. Hanoi: Ministry of

Planning and Investment.

90

82. Socialist Republic of Vietnam (2005) Hanoi core Statement on Aid

Effectiveness. Hanoi: Ministry of Planning and Investment. 83. Socialist Republic of Vietnam. (2005). DAD Vietnam. Retrieved March31st

2008, http://oda.mpi.gov.vn/dad/. 84. Soudalie Silaphet (2008), Effective aid coordination a case study of Lao

People’s Democratic Republic, 2008. 85. Subramanian, A. (2007). A Farewell to Aims. Wall Street Journal, Aug 22. (Pg

15-17).. 86. Thorbecke, E. (2000). The evolution of the development doctrine and the role

of foreign aid, 1950-2000. (In: Tarp, F. and Hjertholm, P. eds. Foreign Aid and

Development: Lessons Learnt and Directions for the Future. London: Routledge). 87. Travis Harvey (2010), Strengthening Aid Management in Lao PDR,

http://www.developmentgateway.org 88. Truman, H. S. (1949). Inaugural Address. http://www.trumanlibrary.org/ 89. UNDP, ADB, East Timor & World Bank. (2002). Participatory Potential

Assessment. Dili: UNDP. 90. UNDP. (2005). Working together to improve aid effectiveness for supporting

sustainable development in Vietnam. Vietnam: UNDP. 91. UNDP. (2006). Human Development Report: The path out of Poverty,

Integrated Rural Development. Dili: UNDP. 92. United Nations (2004) Millennium Development Goals Report Lao PDR.

Vientiane: UN. 93. United Nations Development Programme & Government of the Socialist

Republic of Vietnam. (2005). Support to the Implementation of a government -

Owned Development Assistance Database (DAD). Hanoi: UNDP. 94. United Nations Development Programme. (1999). ODA and Aid Coordination.

Hanoi: UNDP. 95. United Nations Trust Fund for Human Security. (2005). Guidelines for the

United Nations Trust Fund for Human Security. Dili: UNDP.

91

96. United Nations. (1970). UN General Assembly Resolution 2626.

http://daccessdds.un.org/ 97. United Nations. (2008). Millennium Development Goals. Retrieved January 11th 2008, http://www.un.org/millenniumgoals/. 98. United Nations. (2008). UN Millennium Development Goals. Retrieved January 20th 2008, http://www.un.org/millenniumgoals/. 99. Ursula Grant, Karen Moore, David Hulme and Andrew Shepherd, Very poor,

for a long time, in many ways…:Defining ‘the poorest’ for policymakers, Brooks

World Poverty Institute, UK, December 2008 100. USAID. (2008). About USAID. 27th January, http://www.usaid.gov/ 101. W.W. Rostow, The Stages of Economic Growth: A Non-Communist

Manifesto, Cambridge: Cambridge University Press, 1960. 102. Wæver, O. (1995). Securitization and De-securitization. In: Lipschutz, R. D.

eds. On Security. New York: Columbia University Press. 103. WHO (2009). Review of Coordination Mechanisms for Development

Cooperation in Tajikistan. 104. Wijkström, Filip (1998) “Different Faces of Civil Society,” Stockholm: EFI 105. World Bank. (2006). Progress and Plans on the Aid Effectiveness Agenda in

the Lao-PDR. Vientiane: World Bank. 106. World Bank. (2007). Brief Overview. Retrieved May 19,2008,

http://web.worldbank.org/ 107. World Bank. (2007). Increase Effectiveness of Aid for Better Results.

Vientiane: World Bank. 108. World Bank.(2008).World Bank List of Economies. Retrieved January 21st

2008, http://siteresources.worldbank.org/

92

APPENDIX

Appendix 1

VIENTIANE DECLARATION ON AID EFFECTIVENESS

Introduction

We, the government of the Lao People’s Democratic Republic (the

Government) and the Partners in Development (the Partners), seek to take

appropriate monitorable actions to make aid more effective and assist the country

in achieving the Millennium Development Goals (MDGs) by 2015 and the long-

term development goal of exiting the status of least developed country by 2020

(the2020goal). We recognize that while increased volumes of aid and other

development resource scare devoted to achieving the MDGs, aid effectiveness

also needs to increase significantly to support the efforts to strengthen

governance, improve development performance, and enhance development

outcomes. At this Ninth Round Table Meeting, we seek to localize the "The Paris

Declaration" that emerged at the conclusion of the Second High Level Forum on

Aid Effectiveness held in Paris in March 2005 to fit the circumstances of the Lao

People’s Democratic Republic (Lao PDR).We seek to enhance the impact to aid in

reducing poverty, increasing growth, building the capacity of human resources and

institutions, and accelerating the achievement of the MDG sand the 2020 goal.

Partnership Declarations

The following Partnership Declaration share developed in a spirit of mutual

respect, support and accountability. They reflect the ambitions and structure of the

Paris Declaration and build on the ongoing development efforts and experiences in

the Lao PDR. They represent share recognition between the Government and the

Partners to enhance the effectiveness of aid in the Lao PDR. They will be

93

implemented to the extent possible.

Although this Declaration does not constitute a legally binding instrument, it

represents a shared recognition between the Government and the Partners on

enhancing aid effectiveness in the Lao PDR. The Government and the Partners,

when and where possible, will make available appropriate resources, knowledge and

capacity to implement the Declarations.

1. OWNERSHIP

Government exercises effective leadership over the development policies, strategies

and coordinates development actions

1. The Government leads in developing and implementing its five-year National Socio

Economic Development Plan or NSEDP (2006-2010) through abroad consultative

process that integrates the official development assistance in to main stream

planning.

2. The Government continues to translate the NSEDP in to priorities dandy results-

oriented operational programs in the Public Investment Programs (PIPs) and the

annual plan sand budgets.

3. The Government exercises an effective leadership role in coordinating aid at the

macro and sector all levels though a substantive and on going process of dialogue

with relevant stakeholders in clouding the Partners in development; through such

mechanisms as the Round Table Meeting sand the Sector Working Groups.

4. The Partners will support the leadership of the Government and strengthen the

Government’s capacity to exercise its leadership.

94

2. ALIGNMENT

Partners align with the Government's strategies and use strengthened

Government regulations and procedures

Partners align with Government’s strategies

5. The Partners base their dialogue with and support to the Lao PDR on the NSEDP

and related national and external strategies and plans and periodic reviews of

progress in implementing the strategies.

Government strengthens

Government regulations and procedures with support from Partners, with

Partners increasingly using the strengthened Government regulations and

procedures

6. The Government and the Partners will establish mutually acceptable frameworks

that provide reliable assessments of Government regulations and procedures, their

performance, and work together to strengthen the seas necessary and appropriate.

The Partners seek to adopt harmonized performance assessment frameworks for

Government regulations and procedures so as to avoid presenting the

Government with an excessive number of potentially conflicting targets.

7. The Government will seek to ensure, as appropriate, that the legal framework,

national regulations and procedures, institutions and procedures for managing aid

and other development resources are effective, accountable and transparent

8. The Partners use the regulations and procedures of the Government to the

maximum extent possible, including through integrating project implementation

arrangements in to line ministries. Where use of the country’s regulations and

procedures is not feasible, the Partners seek to establish additional measures

95

acceptable to the Government and the Partners that strengthen the country’s

regulations and procedures.

9. The Partners will seek to avoid creating parallel structures that are not well

integrated with the regular Government regulations and procedures, such as parallel

Project Implementation Units (PIUs) or parallel Project Management Units

(PMUs), for the day-to-day management and implementation of aid- financed

projects and programs.

Government strengthens development capacity with support from Partners

10. The Government will seek to integrate the capacity building objectives in the

NSEDP in to related national and sectoral strategies and plans and work with the

Partners to develop a comprehensive, long-term capacity building program.

11. The Partners will seek to align their analytic and financial support with the

Government’s capacity development objectives, strategies and long-term

capacity building program; make effective use of existing capacities; and coordinate

and harmonize support for capacity development accordingly.

Strengthening financial management

12. The Government will continue to ensure timely reporting on and publication of

budget planning and execution, and take leadership in the financial management

improvement process.

13.The Partners will seek to enhance the predict ability of future aid to the maximum

extent possible through transparent decision making processes, provide

96

indicative commitment soft aid overall multi-year framework (including aid

commitments covering multi-year expenditures of projects)and release aid funds in

a timely and predict table fashion.

14. The Partners will seek to progressively rely on the Government’s financial

management system, once mutually acceptable standards have been attained.

Strengthening national procurement regulations and procedures

15. The Government and the Partners will seek to commit sufficient resources to

support and sustain the improvements and capacity building in public

procurement.

16. The Partners will seek to progressively rely on the Government’s procurement

system, once mutually acceptable standards have been attained.

Strengthening environmental and social assessments

17. With the Partners’ support, the Government will seek to develop specialized

technical and policy capacity for social and environmental impact analysis and

enforcement of legislation.

3. HARMONISATION AND SIMPLIFICATION

Partners’ action share more harmonized, transparent and collectively effective

Partners will seek to implement common arrangements and simplify

procedures

18.The Government and the Partners will seek to jointly conduct and use core

diagnostic reviews (such as Public Expenditure Reviews); carry out other reviews

97

jointly wherever possible (e.g. sector reviews); and systematically share the results

of all reviews undertaken.

19. The Partners will seek to work together to reduce the number of separate and

duplicative missions to the field; and promote joint training to share the lessons

learned.

20. The Partners will seek to rationalize their regulations and procedures by

implementing common arrangements for planning, design, funding, disbursement,

implementing, monitoring, evaluating, and reporting to the Government on the

Partners’ activities and aid flows.

21. The Government and the Partners will seek to explore the feasibility of using

increasingly program-base approaches.

22. The Partners will seek to pursued centralization and delegation of authority to their

country offices to the maximum extent feasible.

Complementarily: more effective division of labor

23. The Government provides its views on the comparative advantages of the Partners

and on the ways to increase Partner complementarily at country and sectoral levels.

24. The Partners will seek to make full use of their respective comparative advantages

at sectoral level by aligning support.

Incentives focal abortive behavior

25. The Government and the Partners will seek to improve their procedures and

98

strengthen incentives– including recruitment, appraisal and training–for their

managers and staff to work towards harmonization, alignment and managing for

results.

4. MANAGING FOR RESULTS

Managing resources and improving decision-making for results

26. The Government and the Partners will seek to work together through a participatory

process to strengthen the Government’s capacities towards results- based

management. They will establish results-oriented reporting and assessment

frameworks that monitor progress on national and sectoral development

strategies and the effectiveness of Partner in puts/support based on agreed key

indicators.

27. The Government will seek to strengthen the linkages between national

development strategies and annual and multi-annual budget processes.

28. The Partners will seek to harmonize their monitoring and reporting requirements,

and - until they can rely more extensively on the Lao PDR’s statistical,

monitoring and evaluation regulations and procedures - work with the

Government to the maximum extent possible on joint formats for periodic reporting.

5. MUTUAL ACCOUNTABILITY

Both Government and Partner share accountable for development results

29. The Government and the Partners will jointly carry out annual reviews on progress

in implementing the commitments on aid effectiveness and improved development

99

out comes through existing and increasingly objective country level mechanisms.

They will seek to formulate appropriate indicators and (indicative) targets on aid

effectiveness.

30. The Government will seek to involve the Partners in formulating and assessing

progress on implementation of the national development plans.

31. The Partners will seek to provide in a timely manner an accurate and

comprehensive information on aid flows and programme intentions to enable the

Government to present budget reports to the National Assembly and citizens, and

coordinate aid more effectively.

6. THE WAY FORWARD

32. The Government and the Partners will seek to work together to define an Action

Plan and associated Indicators to guide the implementation of this Declaration. The

Indicators, reflecting those defined in the Paris Declaration, will be tailored to the

context of the Lao PDR. They will include time-bound targets, as appropriate. The

Indicators will be incorporated in the Action Plan that will also include a frame

work for monitoring progress both on implementation of the Action Plan and the

outcomes. A task force comprising representatives of the Government and the

Partners will prepare the Action Plan and associated Indicators, which will be

reviewed and finalized with the involvement of the stakeholders including all the

Partners. This is targeted to be accomplished by 31 May 2007.

33. We, the Government of the Lao People’s Democratic Republic and the Partners in

Development, hereby confirm our willingness to implement the above Partnership

Declarations and enhance aid effectiveness in the Lao PDR.

100

Signed at this Ninth Round Table Meeting on 29 November 2006, in Vientiane, Lao

People’s Democratic Republic.

*****

The Declaration was signed by the government of the Lao People’s Democratic

Republic and representatives of the following 22 partner countries and

organizations on the occasion of the Ninth Round Table Meeting in Vientiane on 29

November

2006:

1. Australia

2. Austria

3. Belgium

4. China

5. Cuba

6. Finland

7. France

8. Germany

9. Indonesia

10. Japan

11.Luxembourg

12. NewZealand

13. Poland

14. The Republic of Korea

15. Singapore

16. Sweden

17. Switzerland

18. The United States of America

19. The European Commission

20. Asian Development Bank

101

21. World Bank

22.The United Nations

The Declaration has subsequently been signed by Thailand the Philippines.

(Ministry of Foreign Affairs, 2007)

102

Appendix 2 COUNTRYACTIONPLAN

OF THE VIENTIANE DECLARATION ON AID EFFECTIVENESS 2007-2010

Includes Annex1: Implementation, Monitoring, Reporting and Updating Arrangements, Annex 2: Definitions, Annex3: Acronyms

GoLLead

Target

Goal

Action

Baseline 2005/06LaoFY

PerformanceMilestones

VD§

Agency

2010/11 LaoFY

& DPFocalPoint

1.Ownership:GoLexerciseseffectiveleadershipovertheirdevelopmentpolicies,andstrategiesandco-ordinatedevelopmentactions

GoL leads in

Line Ministries

6 sector strategies:

Time table decided by

NSEDPVI:implementation

-Transport

October 2007.

9(sub) sectorplans prepared.

1. (VD 1,2,30)

-Trade(Integrated

with support from SWGs (actioni,ii)

Framework)

i) GoL uses SWGs where appropriate to decide on a timetable for introducing costed sector plans and build consensus around sectoral priorities;

-UXO

Developing and implementing the NSEDP through a broad consultative process that integrates ODA

ii) As per decided time table, develop

3(sub)sector plans developed by end 2008 (Education, Health, and Agriculture).

-PEMSP -AI

103

Goal

Action

Performance Milestones

VD§

Baselin e 2005/06LaoFY

Target 2010/11 Lao FY

Go L Lead Agency & DP Focal Point

Into main stream

Prioritized and costed sector/or sub-

-HIV/AIDS

sector plans;

planning and translates the

Main stream gender concerns in all sector

iii) Sectoral plans main stream crosscutting

plans & related monitoring in place.

Lao NCAW, LWU,UN [UNFPA]

Gender Main streaming Tool is developed/endorsed by GoL’s Line Ministries by

issues, beginning with gender;

(action iii)

2008.

NSEDP in to prioritized and sequenced PIPs, and annual budgets.

iv) Prepare costed Kumban development

47 kumban development plans

plans for each of the 47 poorest districts

37Kumbandevelop mentplans developed but not

CPI,UN [UNDP](action iv)

and incorporate the min to Annual NSEDP;

By end of 2007 all Kumban development plans developed.

incorporated in to the NSEDP and funds mobilized for

implementation.

v) Develop/implement plan to strengthen

Mobilisation of resources by

linked to annual NSED Paid funding sources not identified.

2008.

Budget Law

CPI,(MoF), Japan(actions v, vi, vii)

coordination between ministries, central and local governments in the preparation

implemented by 2010.

of sector plans and the move towards programme based approaches;

New Budget Law Decreeand Instructions prepared and

104

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 Lao FY

GoL Lead Agency & DP Focal Point

Disseminated by 2008.

vi) Develop prioritized and well-costed PIPs, disaggregated by sector where

Rules or guide lines for program

Rules or guide lines for

available;

formulation process are implemented by FY2010.

program formulation process are drafted and approved by FY2008.

vii) Identify domestic resources to finance

MTEF full integration to

PIPs and incorporate in medium term expenditure frame works and annual budgets;

Costed and prioritized PIPs, including 2 sectoral PIPs by

2008(Education,Transport),

CPI,UN [UNDP]

national budget system by 2010.

viii) Remaining financing gaps identified and

Including identification of over-funded and under-

funded.

discussed with DPs through the SWGs where appropriate and RTM.

X% of PIPs are clarified under the

CPI

MTEF pilot by2008. Planned Evaluation findings shared

NSEDPVII

NSEDPVII: formulation

ix) Evaluate the process for formulating the

UN[UNDP WHO (Health)]

Priorities and costings approved

NSEDP;

For comments and adopted 2008.

105

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 Lao FY

GoL Lead Agency & DP Focal Point

x) Develop/implement a consultation plan

By National

Consultation Findings

that facilitates consultation between central policy

Assembly and

Report shared at RTIM

ministries (CPI, MoF, MoFA), Line Ministries, local

2008/2009.

government, private sector, DPs and NGOs;

endorsed by DPs.

xi) Through SWGs where appropriate, identify

diagnostic/analytical work required to formulate the

NSEDP;

Research Plan prepared

by end 2007, and

xii) Undertake costing of recurrent and

capital expenditures drawing on the PIP/ MTEF process;

research conducted by mid 2009.

xiii) Prepare NSEDPVII based on evaluations, analytical work, consultations and other experiences identified above.

i) GoL convenes annual Round Table

Implementation Meetings;

MoFA ,UN [UNDP]

2.(VD 3,7)

ii) GoL leads are view of the Sector Working Groups, and

RTIM held in Nov 2007 SWG Review Report shared and recommendations discussed May2007.

AllSWGs prepare Annual work plans and budgets (where agreed in TORs).

recommendations implemented accordingly. The roles of the SWG in this CAP are considered and decided upon;

8SWG search Meeting only once or twice from March 2006-March 2007, and zero had work plans.

iii) GoL communicates policies and strategies on ODA including VD and ODA Decree 168 to line ministries and local authorities;

GoL exercises Effective leadersh ip role in coordina ting aid at macro and sectoral levels.

iv) ODA regulations and procedures, such as MoUs, are developed and strengthened with support from DPs;

Man date and minimum performance expectations for each SWG decided and roles in implementing CAP confirmed by October 2007. INGO and wider Membership to SWG sis promoted.

All SWGs oversee effective sector dialog that: 1.Builds consensus around clear priorities; 2.Aligns & harmonizes DP support around these priorities ;and 3.Monitors

4SWG work plans incorporating simple Joint Monitoring Indicators (that

106

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 Lao FY

GoL Lead Agency & DP Focal Point

v) GoL identifies specific capacity

All SWGs meet their own standards.

Allows measurement of their Own progress) developed by Nov 2007and progress reported at RTIM 2007

constraints to its leadership of the aid effectiveness agenda at the macro levels and decides with DPs on a program of support to remedy this.

VD and CAP translated in to Lao and distributed to GoL agencies through workshops

i) GoL prepares CDFs in key cross cutting

areas and sectors of NSEDP.

A further 2-3 CDF Finalized by 2010.

3.(VD 4)

PACSA WB,UN [UNDP]

4CDF (Transport, Education, Health and Agriculture) finalized by end 2008.

DPs support Leadership of GoL and strengthen GoL's capacity to exercise leadership.

Transport, Education and Public Health in process of developing CDF.

Line Ministries with support from SWGs, where appropriate.

1. Alignment: Donors base their overall support on partner countries' national development strategies,

institutions and procedures

DPs Align with the GoL's Strategies

1. Through the SWGs, DPs broadly align

CPI,UN [UNDP]

1. (VD 5)

And harmonize their assistance strategies to sector strategies and the NSEDP;

Unfunded parts of the PIP Reduced from X to Y [note: data to be taken from the Ownership sections].

DP policies, Activities and aid flows are aligned with GoL strategies and plans.

72% of ODA is Recorded on national budget (ODA Report2005).

By 2010 all DPs Have broadly aligned their assistance strategies to the NSEDP and sector strategies.

Line Ministries with support from SWGs.

ODA flows are aligned with the prioritized investments contained in sector strategies and PIPs with particular attention to the over-and under-funded sections of the PIP.

85% of ODA is recorded on national budget (Global target:85%).

107

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 LaoFY

GoL Lead Agency & DP Focal Point

GoL Strengthens Regulations and Procedures with support from DPs, which DPs Increasingly Use

i) GoL and DPs carry out a joint review of

DIC, MoFA UN [UNDP]

2.(VD 8,9)

66% of projects use PMUs/PIUs in 2005 (OECD-DAC survey).

Review of current implementation structures and lessons learned by end 2007.

ODA-funded implementation structures in order to a) classify them according to the agreed matrix (refer Definitions), and b) summarise lessons learned in integrating project implementation structures to date;

No new parallel implementation structures created after 2010, unless endorsed by relevant GoL agencies.

Line Ministries with support from SWGs.

DPs do not create structures for implementing ODA-funded projects that are parallel to GoL structures.

MCTPC has no PMUs/PIUs.

ii)SWGs build on lessons learned above to

All SWGs agree on guidance for integrating project implementation functions within their sector by mid 2008.

guide progress towards integrating project implementation functions within their sector and monitor progress towards this.

Education has made progress in reducing parallel project structures.

GoL strengthens development capacity with support from DPs

i) DPs provide technical cooperation and

CPI, PACSA, WB

3.(VD 10,11)

DPs align their technical cooperation behind GoL CDFs.

other capacity building interventions in alignment with GoL developed sector CDFs.

For those sectors with CDF, 50% of new capacity building interventions align with CDFs by mid 2009.

<10% of total capacity building interventions aligned with CDFs (only MCTPC).

50%oftotal capacity development interventions aligned with CDFs.

108

Strengthening Financial Management

Goal

Action

Performance Milestones

Baseline 2005/06 Lao FY

VD§

GoL Lead Agency & DP Focal Point

Target 2010/11 LaoFY

MoF, WB, ADB No functional

Strengthening national PFM systems: i) GoL and DPs jointly review and decide

4.(VD 6,8,12, 14)

classification of the budget currently exists.

Budget classification aligns with IMF-GFS and functional classification of budget implemented.

on acceptable criteria for PFM regulations and procedures;

Revised Chart of Accounts and functional classification system implemented in FY

2008/09 Budget.

ii) GoL strengthens budget execution by

TSA established and centralized treasury structure implemented.

GoL implements reforms to strengthen PFM to enable DPs to increasingly use GoL financial management procedures and systems for their ODA.

More than 2,000 bank accounts operating outside the control of the MoF.

implementing the budgeting law/centralization of treasury; aligning budget execution with plan; and integrating ODA financing and other revenues into the budget;

iii) GoL produces quarterly financial reports on

Budget norms developed for health and education sectors

Consolidation of GoL accounts within a unified TSA structure is able to show consolidated GoL position in real time.

Budget planning is not based on a normative system.

consolidated GoL expenditure, and makes these compatible with GoL financial statistics standards over time;

GoL Financial Information System fully established.

iv) GoL strengthens internal control

Budgeting for health and education sector done based on a system of budget norms.

framework by establishing internal audit functions and associated enforcement mechanisms;

Current reporting is on an annual basis, with the report published more than 5 months after end of fiscal year.

v) GoL strengthens the State Audit

Quality budget execution reports produced for

2008/2009.

Organization so that it can provide independent audit opinions to INTOSAI standards in a timely manner;

New Audit Law is implemented.

Budget Audit s carried out to INTOSAI standards by 2010.

vi) GoL introduces a comprehensive intergovernmental fiscal transfer framework in order to better align policy priorities with the budget.

109

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 LaoFY

GoL Lead Agency & DP Focal Point MoF,WB, ADB

DPs supporting national PFM systems: vii) DPs clarify and share with GoL and other DPs their respective legal and

34% of ODA to the public sector uses GoL PFM systems [OECD-DAC] -45% ODA used Budget

policy regulations for the use of national PFM systems and standards to deliver ODA;

54% of ODA to the public sector uses GoL PFM systems (Global: 33% increase from baseline).

Execution Procedures-30

% ODA used Financial

viii) DPs increasingly align PFM support to

Reporting procedures

GoL priorities;

-28% ODA used State

Audit procedures:

ix) DPs increasingly adopt GoL procedures,

rules and regulations;

33% of total ODA disbursed through PBAs (including direct budget) [OECD-DAC].

x) DPs increase ODA delivered through aid

5% of total ODA disbursed through PBAs (including direct budget) [OECD-DAC].

90% of ODA is untied (desk review DAC Survey).

modalities, such as direct budget support, that best support PBAs and reduce transaction costs;

xi) DPs increase the percentage of untied aid

executed by GoL as encouraged by the

75-80% of ODA is untied (ODA Report 2005).

2001 DAC Recommendation Untying Official Development Assistance to Least Developed Countries.

i) DPs and GoL develop a common format

MoFA,UN [UNDP]

Common format decided by end 2008.

5.(VD 13,31)

for reporting total, sectoral and project level aid flows over a multi-year period, compatible with revised ODA database;

Gap between DPs’ disbursed ODA and amount recorded by GoL as disbursed is

Aid is more Transparent and predictable.

15%.

Gap between DPs’ disbursed ODA and GoL recorded as disbursed is 30% (OECD-DAC survey).

ii) DPs strive to make indicative and

transparent commitments of ODA over annual or multi-year period, in line with Lao Financial Year where possible;

All DPs use common format for either annual or multi-year period.

110

Goal

Action

Performance Milestones

Baseline 2005/06 Lao FY

VD§

Target 2010/11 Lao FY

GoL Lead Agency & DPFocalPoint

iii) DPs aid is predictable and released on

time, where mutually agreed conditions have been met;

iv) DPs work with GoL to strengthen

absorptive capacity of GoL to effectively follow upon/use ODA pledges;

v) GoL to present annual budget reports to

the National Assembly & citizens, which include ODA.

Strengthening National Procurement Regulations and Procedures

MoF,WB

Recommendations from joint review shared with GoL and DPs by 2008.

6.(VD 6,8,15, 16)

i) DPs clarify and share with GoL and other DPs their respective legal and policy regulations for the use of national procurement systems and standards to deliver ODA;

[X%] of public procurements through competitive procedures (PrMO).

ii) GoL and DPs jointly review and decide

[X%] of public procurements through competitive procedures (note: data from PrMO end 2007).

on acceptable criteria on procurement regulations and procedures;

Procurement website developed by end 2007 (PrMO currently in process of developing).

iii) GoL Procurement Manual and Standard

GoL and DPs commit sufficient resources to strengthening procurement regulations and procedures and enhance their efficiency, transparency and utilization.

Bidding Documents are distributed to DPs;

[X%] of public procurements through Standard Bidding Documents (PrMO).

iv) GoL fully implements new procurement

decree;

[X%] of public procurements through Standard Bidding Documents (Note: data from PrMO end 2007).

Procurement Manual and Standard Bidding Documents updated and made publicly accessible by 2008.

v) GoL recruits and trains sufficient number of staff at the PrMO; vi) Systematic collection of procurement

40% of DPs use GoLs procurement procedures (OECD-DAC).

17% of DPs use GoLs procurement procedures (OECD- DAC).

111

Goal

Action

Performance Milestones

Baseline 2005/06 Lao FY

VD§

Target 2010/11 LaoFY

GoLLead Agency & DPFocalPoint

information and monitoring of performance and outcomes (through PrMO);

vii) DPs increasingly adopt GoL procedures,

rules and regulations to manage ODA- related procurement.

Strengthening Environmental and Social Standards for ODA-Funded Projects

Guidelines implemented.

Assessment completed by mid 2008.

7.(VD 17)

STEA, UN [FAO], Sweden / SIDA

i) DPs clarify and share with GoL and other DPs their respective legal and policy regulations for the use of national environmental and social standards in ODA projects and programs;

Revised guidelines / standards drafted and approved by end

Social impact assessments include gender assessment.

ii) Review current guide lines, standards and

2008.

With DP support, GoL develops technical & policy capacity for social, gender & environmental impact analysis & enforcement legislation.

Use of Joint Monitoring indicators

legislation for conducting social (including gender, HIV/AIDS and Employment, etc) and environmental impact analysis for ODA projects, and identify/implement areas that need improvement;

Development of joint monitoring indicators.

iii) Discussion and approval of new

guidelines/monitoring indicators for environmental and social impact analysis;

iv) Strengthen the capacity of relevant GoL

agencies to enforce the above regulations.

Adoption of harmonised environmental and social standards at all levels of government. All applicable ODA projects adhere to social and environmental legislation that is

112

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 LaoFY

GoLLead Agency & DPFocalPoint

monitored and enforced by GoL

3. Harmonisation and Simplification: DPs’Actions are more Harmonized, Transparent and Collectively Effective

EC UN [UNDP]

30% of CAW is joint (OECD/DAC)

66% of CAWis joint.

1.(VD 18)

Consolidated list developed, disaggregated by sector/programme on annual or multi-annual basis.

[global: 66%]

i) Through the SWGs where appropriate, GoL and DPs share list of planned country analytical work; identify priority research gaps and areas for joint country analytical work;

GoL & DPs conduct & use core diagnostic reviews, carryout joint reviews & share results.

ii) GoL and DPs conduct joint analytical

work wherever possible;

[Global: 30% of country analytic work is joint (2004)]

Line Ministries with support from SWGs, where appropriate.

Joint research programme decided for 2 sectors by 2008 (Health, Education).

iii) Mechanisms identified and implemented to share research/review results to DPs, line ministries and provincial GoL (eg. RTM website or global CAW site).

i)

DIC, MoFA, EC

Best practices identified by December2007.

50% of missions are joint.

2.(VD 19,22)

DPs pursue decentralization & delegation of authority to country offices;

550 Missions in 2005/06 (OECD/DAC).

Line Ministries with support from SWGs, where appropriate.

DPs harmonise training and reduce administrative burden of GoL related to the number of duplicative missions.

12% of missions are joint (OECD/DAC).

ii) GoL and DPs decide on, and document coreprinciples/goodpractices regarding missions and training scheduling, including consideration of mission freeperiod(s)(eg.April to June -annual plan formulation);

Harmonised and/or joint mission and training schedules introduced for pilot sectors (Transport, Education&Health) by 2008.

113

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 LaoFY

GoLLead Agency & DPFocalPoint

iii) GoL and DPs (through the SWGs, where appropriate) share their training and mission plans and organize harmonized and/or joint training and missions where applicable;

iv) DPs increasingly share findings from

missions among DPs and GoL (eg.RTM

i) GoL and DPs decide on which DP

PACSA,MoF, EC

Identification of procedures and time table by end 2007.

3.(VD 20,25)

regulations and procedures should use common arrangements and timetable for implementation;

- DSA, salaries;

GoL Guidelines gradually introduced and, where possible, applied to on-going projects/ programmes.

ii) DPs carry out an overall review of above

DSA and salaries of GoL staff on ODA projects harmonized by 2008.

GoL & DPs rationalize regulations, procedures & incentives by implementing common arrangements.

Line Ministries with support from SWGs, where appropriate.

identified current practices and recommend policy/ practice to harmonize DP procedures & incentives;

iii) Common procedures implemented

(beginning in PBA sectors: Transport, Education, and Health).

i) GoL reviews and improves (where

4.(VD 21)

DPs coordinate programs in Health, Education and Transport sectors.

ADB (Transport)& MoF, Line Ministries with support from SWGs.

33% of ODA disbursed to PBAs (including direct budget support).

necessary) national financial systems to channel budget support and pooled funding identified for PBA to relevant sector;

5%ofODA disbursed to PBAs (including direct budget support). (OECD-DAC)

ii) DPs expand use of coordinated approaches

GoL and DPs increase aid effectiveness through coordinated approaches e.g. PBAs.

to programming and resource mobilisation through SWG framework.

114

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

GoLLead Agency &

Target 2010/11 LaoFY

4. Managing For Results: Managing Resources and Improving Decision-Making For Results

i)

1.(26, 28)

Further strengthen the national statistical system by implementing the National Statistics Strategy 2006-10;

CPI, UN [UNDP], Sweden/ SIDA

National Statistical Strategy for 2006- 10 has been completed.

Results Frameworks well advanced by

Develop & implement Master Plan. Statistical needs assessment by end 2007. National and sectoral indicators decided.

2010.

Results orientated frameworks, that both GoL and DPs use, enable monitoring of development results and of

ii) Develop a set of indicators to monitor progress at national and sectoral levels, and decide on surveys/studies to collect data for these indicators and their periodicity;

progress toward aid effectiveness.

iii) Develop, train on and implement results

Lao Info is used by GoL as a monitoring tool for implementation of NSEDP. 2007 MDG Progress Report published.

All DPs use common formats for monitoring and reporting.

orientated frameworks to monitor and evaluate the 1) implementation and 2) impact of the NSEDP and sector programmes, using strengthened national statistical systems and other tools such as the Lao Info database and MDG Report;

iv) DPs work with GoL to prepare joint

ODA Database fully operational, data reliable and transparently available to GoL and DPs by 2010.

formats for periodic reporting and align to above results oriented frame works; v) Review progress of SWGs against their own Joint Monitoring Indicators

Results Frameworks for general NSEDP prepared ands hared by end 2007: Sector Specific Results Frameworks for Transport by end 2007, and for Education and Health by end 2008.

vi) Develop and implement mechanism to

monitor progress against aid- effectiveness commitments set out in CAP;

General simple joint format for monitoring and reporting endorsed by DPs by mid 2008.

115

Goal

Action

Performance Milestones

Baseline 2005/06LaoFY

VD§

Target 2010/11 LaoFY

GoLLead Agency & DPFocalPoint

vii) Continue to participate in the OECD-

DAC Survey;

viii) Revise the ODA Database to provide

transparent and accurate reports on ODA-financed projects and programmes showing financial inputs (commitments

OECD-DAC Country Worksheet April2009. Proposal for revised ODA database shared and endorsed by GoL and DPs by 2008.

& disbursements) and output progress. Information is shared across MoFA, MoF,CPI and line ministries and with DPs.

5. Mutual Accountability: Both GoL and DPs are Accountable for Development Results

i) GoL and DPs report on and assess

First CAP Review Meeting held in October/November

Regular mutual assessments shared.

1.(VD 29)

progress in CAP implementation at CAP Review Meetings, and outcomes of which are presented at RTIM;

Progress over decided commitments on aid effectiveness is assessed.

ii) GoL and DPs undertake independent evaluations/assessments of particular aid-effectiveness issues.

2007 CAP implementation reported at RTIM2007. Identify topics and timetable for evaluations and funding arrangements by end 2007.

DIC, MoFA, UN [UNDP]

(Ministry of Foreign Affairs, 2007

116

APENDIX 3 "QUESTIONS FOR DEEP PERSONAL INTERVIEW": Self Introduction: My Name is Khammany Inthirath; I am now doing my PhD

Dissertation on “Effective Aid Coordination in Lao PDR: Policy Implications for

Power Sector Development”. I would like to have your assistance in answering my

questions.

Section I: Overview about ODA Coordination System

1. What do you know about external assistance coordination for Lao PDR, about ODA

using in Lao PDR?

2. What do you think about/ assess the current situation of external assistance

coordination and ODA using in Lao PDR in general and in power sector in particular?

Do you know any model of effective use of it?

3. Do you know any country in the world where ODA is used effectively most? What

lessons Lao PDR can learn from them?

4. How do you think about power sector development situation? What do you expect

from the sector development in the next ten to fifteen years ahead?

5. What do you suggest for the government of Lao PDR to make the external assistance/

ODA effectively used and to further the power sector?

6. Do you have any other recommendation regarding the mentioned subject? 7. What is the aid effectiveness agenda in Lao PDR? Who are the involving institutions? 8. What is the local effort from international agencies and donor communities for aid

effectiveness in Laos?

9. Does the local development community support the local government in aid

coordination?

Section 2: Purpose of Development Partner Coordination Units 10. What kinds of activities does the donor coordination unit carry out?

Section 3: Roles and Responsibilities of Development Partner Coordination Units 11. Who manages the Development Partner Coordination Units?

117

12. What is the role of the Development Partner Coordination Units? 13. Who makes decisions in the Development Partner Coordination Units?

Section 4: Organization of Development Partner Coordination Units 14. Is the donor coordination unit a standalone unit or is part of a larger unit? 15. What is the name of the department under which the Development Partner

Coordination Units exists?

16. How many coordination units do you have? 17. How many non-governmental organizations (NGOs) are working in the energy sector? 18. How many international NGOs (INGOs) are working in the your sector? 19. How many people work in the Development Partner Coordination Units? 20. Who makes up the Development Partner Coordination Units? 21. How many development partners are active in your institution?

Section 5: Financing 22. How is the Development Partner Coordination Units supported? 23. How are the Development Partners’ Funds channeled through your institution? 24. What type of budget support are the Development Partners providing? 25. What are the contractual arrangements that govern the relationship with the

Development Partners in your institute?

26. How do you make decisions in terms of funds allocation and reallocation? 27. Do you monitor the expenditures by different donors/NGOs? 28. For what kind of donor/NGO projects/activities do you monitor the expenditures? 29. Please specify how you link donor/NGO expenditure monitoring with your donor

coordination?

30. Who pays for the donor coordination unit activities?

Section 6: Strengths and Accomplishments 31. What do you consider to be the strengths of Development Partner Coordination Units? 32. How would you rate the efficiency (time/money/outputs) of the donor coordination

activities?

118

33. How do you monitor the activities that have to be accomplished by different

donors/NGOs?

34. Do you have a comprehensive energy sector plan which comprises most of the

donors/NGOs activities?

35. Does the plan have output and/or outcomes indicators? 36. How did you establish the indicators? 37. Are there certain elements of your donor coordination activities that you would like to

highlight or describe further?

Section 7: Challenges 38. What do you consider to be the weaknesses of the Development Partner Coordination

Units?

39. What do you consider to be the major/important internal challenges for the unit? 40. Do you monitor the flow of funds (incoming) from donors/ NGO activities? 41. Are the funds entering regularly (as scheduled)? 42. Do you know when different donors’ and international and national NGOs’ support

will expire?

43. Do you map the duration and expiration of donors’ and NGOs’ support? 44. How is the Ministry of Energy and Mines planning to respond to the phasing

out/expiration of donors’ and NGOs’ support?

119

APENDIX 4 The List of Interviewees (Full name, capacity, name of organization, Contact number).

1. Prime Mister’s office, National Committee For Business Development 01 People 1. Mr. Phayvanh CHANHDAVONG Deputy Director General Executive Secretary to

the Minister, President of NCBD. Mobile Phone: 8520 55527829. Email:

chandavong@yahoo.com

2. Ministry of Planning and Investment 5 People 1. Dr. Bounthavy SYSOUPHANHTHONG, Vice-Minister of Ministry of Planning and

Investment. Office Tel : 85621 217020

2. Dr. Kikeo, Director General of Ministry of Planning and Investment Office. Office

Tel : 85621 217010

3. Mr. Phesai PHIATHEP, Director General of Planning Department. Office Tel : 85621

217009

4. Mr. Achong LAOMAO, Acting Director General of Investment Promotion

Department. Office Tel : 85621 223002

5. Ms. Sisoumboun AONAVONG, Acting Director General of Internal Corporation

Department. Office Tel : 85621 216755

1 People

3. Ministry of Justice 1. Mr. Vilath PHEWON Director General of Ministry of Justice Office Mobile Phone :

85620 99801552

2 People

4. Ministry of Education and Sport 1. Dr. Saikhong SAINASIN, Vice Dean of National University of Lao Office Tel :

85621 770381

2. Dr. Phosy CHANHMING, Deputy Director Research Office of National University of

Lao. Mobile phone: 85620 23300555. E-mail : phosyc@gmail.com

5. Ministry of Energy and Mines (MEM) 9 People

120

1. Mr Viraphonh VIRAVONG, Vice-Minister of Ministry of Energy and Mines Office

Tel: 85621 413000/454614

2. Dr. Sinava SOUPHANOUVONG, Vice-Minister of Ministry of Energy and Mines

Office Tel: 85621 413000

3. Dr. Bountheung PHENGVONGSA, Director General of Ministry of Energy and

Mines Office. Mobile Phone : 85620 55519338

4. Dr. Daovong PHONKEO, Director General of Power Policy and Planning Department

Mobile Phone : 85620 99801592 E-mail daovongph@yahoo.com

5. Dr. Xayphone BOUNSOU, Vice Minister Assistant, Deputy Manager of Planning

Division. Mobile phone: 85620 22435770. E-mail: xayphone3000@yahoo.co.jp 6. Mr. Saypaseuth PHOMSOUPHA, Director General of Business Department Mobile

phone : 85620 45253940 E-mail: xayphaseuth@deb.gov.la

7. Mr. Sisoukan SAYARATH, Director General of Energy Management Department

Mobile phone :85620 99801583 E-mail: sisoukansayarath@yahoo.com

8. Mr. Hatsady SISOURAYH, Director General of Institute of Renewable Energy

Promotion. Mobile: 85620 55511537 E-mail: hatsady@demem.org

9. Mr. Stuart GLAUBERMAN, Public Relations Advisor (America) to the Department

of Energy Policy and Planning Mobile phone : 85620 28121844

E-mail: stuxb808@gmail.com

1 People

6. World Bank (WB) 1. Mr. Veasna BUN, WB Team Leader for Rural Electrification Phase II Project. Office

Tel : 85621 266200. E-mail : vbun@worldbank.org

2 People

7. International Finance Corporation (IFC) 1. Mr. Almilion CHATZINIKOLAOU ADB Representative to Lao PDR, Office Tel:

85621 266300. Website : www.ifc.org/Mekong

2. Ms. Sisomsouk SAIMOUNKHOUN, Office Administrator of IFC

Mobile Phone: 85620 55518670. E-mail: tsaimoungkhoun@ifc.org

2 People

8. Asian Development Bank (ADB) 1. Mr. Takafumi Kadono, Energy Special Vietnam Resident Mission Position, Office

Tel: +844 39331374. E-mail: tkadono@adb.org

121

2. Mr. Phosay PHOMMACHANH, Project Officer ADB-Lao PDR Mission. Office

Tel: 85621 250444

9 People

9. Electricity of Laos (EDL) 1. Mr. Sisavath THIRAVONG, Managing Director & CEO of Electricity of Laos

Mobile: 85620 55512749 E-mail: sisavth_th@yahoo.com

2. Mr. Thongphet DOUANGNGEUNE, Deputy Managing Director of Electricity of

Laos Mobile: 85620 22223687 E-mail: dthongphet@YAHOO.COM

3. Mr. Bountham SENEPHANSIRI, Deputy Managing Director of Electricity of Laos

Mobile: 85620 55570021 E-mail: bounthamsp@yahoo.com

4. Mr. Vongmany SONEKETSOULINH, Deputy Managing Director of Electricity of

Laos Mobile: 85620 22223799 E-mail: vongmany-s@hotmail.com

5. Mr. Duangsy PHARAYOK, Deputy Managing Director of Electricity of Laos

Mobile: 85620 22333000 E-mail: duangsy@yahoo.com

6. Mr. Komonchanh PHETASA, Manager of Business Department, Mobile Phone :

85620 55555868 E-mail: komon128@hotmail.com

7. Mr. Bounma MANIVONG, Manager of Finance Department Mobile Phone : 85620

555506739 E-mail: bm.mani09@gmail.com

8. Mr. Ken THEPVONGSA, Manager of Transmission Line and Substation Department,

Mobile Phone: 85620 22805666.

9. Mr. Khamsing PHOSARATH, Manager of Technical Department, Mobile Phone:

85620 55530849.

10. EDL Generation Public Company (EDL-GEN) 3 People 1. Mr. BounOum SYVANPHENG, Managing Director & CEO Mobile Phone :

8562022223899 E-mail bounoum_syv@yahoo.com / edlgenhq@edlgen.com.la 2. Ms. Rattana PRATHOUMVAN , Deputy Managing Director, COO Mobile Phone :

(856-20) 96966555 & 22205084 E-mail: lattana2005@yahoo.com /

rettanadmd@edlgen.com.la

3. Mr Dr. Bounsalong SOUTHIDARA, Deputy Managing Director, CFO. Mobile

Phone : (856-20) 96964555 / Office: (856-21) 316140

E-mail : bounsalong@gmail.com / bounsalong@edlgen.com.la 11. Japan International Cooperation Agency (JICA) 2 People

122

1. Mr. Takayuki Niimura, Expert Policy advisor of Department of Energy Policy and

2. Mr. Nobuo HASHIMOTO, Expert Policy advisor of Department of Energy Policy and

Planning. Office Tel : 85621 415038 Email:hashisan2001@yahoo.com.co.jp

Planning. Office Tel : 85621 415038 Email: takayuki.niimura@gmail.com

2 People

12. National IT Promotion Agency (NIPA) from Korea 1. Dr. Dok-Han Kim, Expert Finance of Electricity of Laos. Tel : 85620 96590680

Email: kdh0567@yahoo.com

2. Mr. Tai Dong Lee, Expert Hydropower of Electricity of Laos. Tel: 85620 95329494

Email: tdlee0502@naver.com

123

APPENDIX 5 Energy Development Plan 5.2. Projection of Investment on Northern Region Power Development Sources from

2010-2020

Location (Province)

Capacity (MW)

EDL contribution

No.

Project Names

Phant Factor

Project Period

Completion Year

Project Types

Province

MW

%

Energy/ year GWh p.a.

EDL Loan Mill. US$

Mill. US$

Project Value Mill. US$

11.5

Nam Nhon

Bokeo

55%

2006-10

4.50

BOT

2010

2.4

1

8

Nam Tha 3

Luangnamtha

70%

2010-11

1.50

BOT

2011

1.3

2

Nam Ngum 5

Vientiane

500

48%

2001-11

BOT

200.00

6

3.0%

2011

120

3

38

Nam Long

Luangnamtha

87%

2009-12

BOT

12.90

0.78

6.0%

2012

5

4

30

Nam Sim

Huaphanh

43%

2011-13

19.40

BOT

2013

8

5

15

Nam Ham 2

Sayaboury

34%

2011-13

8.00

BOT

2013

5

6

Nam Khan 2

Luangprabang

126.9

568

51%

2010-14

314.60

298.87

15.73

5.0%

BT

2014

7

96

Nam Boun 2

Phongsaly

73%

2011-14

30.00

27

3

10.0%

BT

2014

15

8

Nam Ngiew

9

63

36%

2010-14

BOT

38.00

2014

20

Xieng Khuang

200

Nam Beng

Oudomxai

67%

2010-14

BOT

65.00

2014

34

10

721

Nam Tha 1

Luangnamtha

168

49%

2009-14

BOT

350.00

2014

11

Luangnamtha

200

1401.6

80%

2011-14

2014

BOT

420.00

12

Viengphoukha (Lignite)

13

Nam Pot

87.6

50%

2010-14

2014

BOT

44.00

20

Nam Chein

390

56%

2010-15

165.00

148.5

16.5

10.0%

BT

2015

80

14

Xieng Khuang Xieng Khuang

Nam Phak

Oudomxai

165

63%

2009-15

BT

43.60

43.56

2015

30

15

Hongsa (Lignite)

Sayaboury

700.8

80%

2008-15

BOT

3,728.00

2015

100

16

Nam Ngiep 2

1170

74%

2010-15

BOT

345.40

2015

180

17

Xieng Khuang

Nam Phak

Luangnamtha

750

66%

2010-15

BOT

208.00

2015

130

18

1100

57%

2010-15

BOT

696.00

Nam Ngum 4

2015

220

19

Xieng Khuang

545.8

Luangprabang

52%

2008-16

BOT

226.00

Nam Ou 2

2016

120

20

417.9

Phongsaly

53%

2008-16

BOT

290.00

Nam Ou 6

2016

90

21

222

Nam Khan 3

Luangprabang

54%

2011-16

BT

117.00

111.15

6

5.1%

2016

47

22

214

Huaphanh

41%

2009-16

2016

BOT

117.00

60

23

Sayaboury

420

80%

2008-19

2017

BOT

2,497.50

60

24

Luangprabang

150

660

50%

2008-17

2017

BOT

2,794.00

25

Nam Xam 1 (Off take) Mekong (Sayaboury, (Off take) Mekong Luangprabang, (Off take)

26 Mekong Pakbeng

Luangprabang

754

57%

2010-20

BOT

2,994.00

2019

150

Phongsaly

1156.3

55%

2011-16

BOT

291.00

Nam Ou 5

2016

240

27

Luangprabang

798.9

57%

2010-18

BOT

256.00

Nam Ou 1

2018

160

28

Luangprabang

709.6

54%

2010-18

BOT

244.00

Nam Ou 3

2018

150

29

Phongsaly

569

56%

2010-18

BOT

251.00

Nam Ou 4

2018

116

30

Phongsaly

915.4

55%

2010-18

BOT

373.00

Nam Ou 7

2018

190

31

Total (2010-2015)

1466

8016

62%

100%

17,144.40

629.1

48

EDL

252

1219

55%

17.20%

670.20

629.1

48

124

IPP(d)

1114

6096

62%

76.00%

2,638.70

IPP(e)

100

701

80%

6.80%

12,420.50

Total (2016-2020)

1533

7383

55%

100%

692

52.8

18,858.80

EDL

47

222

54%

3.10%

692

52.8

737.20

IPP(d)

976

4695

55%

63.70%

2,902.60

IPP(e)

510

2466

55%

33.30%

13,662.60

Total (2010-2020)

2999

15398

59%

100%

36,003.20

1321.1

100.8

EDL

299

1441

55%

10.00%

1,407.30

1321.1

100.8

IPP(d)

2090

10791

59%

69.70%

5,541.30

IPP(e)

610

3167

59%

20.30%

26,083.10

125

Location (Province)

Capacity (MW)

Project Names

No.

Owner

Completion Year

Project Period

Phant Factor

Province

MW

%

5.3. Projection of Investment on Central Region Power Development Sources 2010-2020 EDL Loan Mill. US$

Project Value Project Types Mill. US$

Energy/ year GWh p.a.

EDL contribution Mill. US$

100

1 Nam Lik 1/2

Vientiane

435

50%

2008-10

2010 BOT

150

IPP(d)

615

Vientiane

2218

41%

2006-10

2010 BOT

60

790

IPP(e)

2 Nam Ngum 2 Nam Song (Extension)

3

Vientiane

11

6

28

53%

2008-11

2011 BT

2.3

17% EDL

13.3

1.5

4 Nam Phao

Bolikhamxai

3.3

25%

2008-11

2011 BOT

3.5

IPP(d)

Theunhinboun (Extension)

946

220

5

Bolikhamxai

49%

2008-12

2012 BOT

86.4

17%

IPP(e)

498

316

60

6 Nam Gnuang 8

Bolikhamxai

60%

2009-12

2012 BOT

120

IPP(d)

10

43.8

50%

2010-13

2013 BT

31.37

31.37

7 Nam Sana

Vientiane

EDL

Nam Ngum 1 (Extension)

40

88

25%

2010-14

2014 BT

70

63

7

10% EDL

8

Vientiane

50

9 Nam Mang 1

Bolikhamxai

235

54%

2010-14

2014 BOT

196.6

IPP(d)

60

248.7

47%

2010-14

2014 BOT

10 Nam Lik 1

Vientiane

130

IPP(d)

5

19.7

45%

2010-14

2014 BOT

11 Nam Kan

Vientiane

5.5

IPP(d)

200

45

12 Kengseuaten

Bolikhamxai

51%

2009-15

2015 BT

90

EDL

740

160

13 Nam Bak

Vientiane

53%

2010-15

2015 BOT

260

15.6

IPP(d)

60

14 Nam Phai

Vientiane

280

53%

2010-15

2015 BOT

110.5

IPP(d)

50

250

57%

2008-17

2017 BOT

695

Nam Theun 1 (Off take)

15

Bolikhamxai

IPP(e)

16 Nam Mouan

105

472.1

51%

2010-17

2017 BOT

271.4

IPP(d)

30

17 Nam San 3 (Down)

120

46%

2010-18

2018 BOT

76

IPP(d)

Bolikhamxai Xieng Khuang Vientiane Capital

60

18 Nam Ngum (Down)

300

57%

2010-18

2018 BOT

122

IPP(d)

18

Nam Ngeip 1 (Off take)

19

Bolikhamxai

102

65%

2010-18

2018 BOT

344

IPP(e)

60

20 Nam Phouan

Vientiane

280

53%

2010-19

2019 BOT

115

IPP(d

Total (2010-2015)

1433

5801

46%

100%

181

95.7

4092.2

101

EDL

360

41%

7.1%

181

95.7

204.7

497

IPP(d)

2278

52%

34.7%

1560.5

835

IPP(e)

3164

43%

58.3%

2327

323

Total (2016-2020)

1524

54%

100%

4501.4

199.1

105.3

EDL

225.1

199.1

105.3

IPP(d)

255

1172

52%

78.9%

1716.6

IPP(e)

68

352

59%

21.1%

2559.7

380

201

Total (2010-2020)

1756

7326

48%

100%

8593.6

EDL

101

360

41%

5.8%

380

201

429.8

IPP(d)

752

3450

52%

42.8%

3277.1

IPP(e)

903

3516

44%

51.4%

4886.7

126

APPENDIX 6 Projection of Investment on Power Development Sources from 2010-2020 (Whole Country)

Energy/ year Project Value

EDL Loan

Project Names

Total (2010-2015) EDL IPP(d) IPP(e) Total (2016-2020) EDL IPP(d) IPP(e) Total (2010-2020) EDL IPP(d) IPP(e)

GWh p.a. 20,321 2,693 13,427 4,201 13,636 372 10,168 3,096 33,957 3,065 23,595 7,297

Capacity (MW) MW 3,945 548 2,373 1,024 2,761 103 2,010 648 6,706 650 4,383 1,672

Mill. US$ 25,939.70 1,450.90 6,955.30 16,118.50 28,533.70 1,596.00 7,650.80 17,730.40 54,473.40 3,047.00 14,606.10 33,848.90

Mill. US$ 1,204.2 1,204.2 1,324.6 1,324.6 2,528.8 2,528.8

EDL contribution Mill. US$ 175.7 175.7 193.2 193.2 368.9 368.9

d = domestic e = export IPP = Independent Power Producer EDL = Electricity Due Laos. The table above shows the projection of power development plan between 2010 and

2020. During the period, the target of development plan is to install production facility

with the capacity of 6,706 MW, with energy production of 33,957 GWh per annum. The

total investment cost will be 54,573.4 million US$. Among these, EDL will invest 3

billion US$, while IPP for domestic will invest 14.6 billion US$ and IPP for export will

invest 33.8 billion US$. The EDL plans to borrow 2,528.8 million US$, perhaps through

ODA as low interest loan if possible, or commercial loan. EDL will invest its own fund

of 368.9 million US$ during the period of 2010 and 2020.

127

APPENDIX 7

Detail estimate of energy sector projection

1. Existing Production Facility

Name of Project

Location

Status

Installed Capacity

Investors (Sponsors)

No.

Planned Market

Remarks

Province

(MW)

Equity share

Progress of project

Owner- ships

1

Commercial Operation Date In Operation

1970

Nam Dong (H)

Luangprabang

• EdL (Laos) 100%

Laos

EdL

1

5

Selabam (H)

Champasak

In Operation

1970

• EdL (Laos) 100%

Laos

EdL

2

Nam Ngum 1 (H)

Vientiane

155

In Operation

1971

• EdL (Laos) 100%

Laos/ Thailand

EdL

3

45

Xeset 1 (H)

Saravane

In Operation

1990

• EdL (Laos) 100%

Laos/ Thailand

EdL

4

1.5

Nam Ko (H)

Oudomxay

In Operation

1996

• EdL (Laos) 100%

Laos

EdL

5

• EdL (Laos) 60%

6

Theun-Hinboun (H)

Bolikhamxay

210

In Operation

1998

IPP(e)

Laos/ Thailand

• Nordic 20%

• GMS 20%

• EdL (Laos) 20%

7

Houay Ho (H)

Champasak/ Attapeu

152.1

In Operation

1999

Laos/ Thailand

150MW (Export) and 2.1MW (Domestic)

60

Nam Leuk (H)

Vientiane

In Operation

2000

• EdL (Laos) 100%

Laos/ Thailand

IPP(e) • Suez Energy (Belgium) 60% • HHTC (Thailand) 20% EdL

8

1.2

Nam Ngay (H)

Phongsaly

In Operation

2003

• EdL(Laos) 100%

Laos

EdL

9

40

10

Nam Mang3 (H)

Vientiane

In Operation

2004

• EdL (Laos) 100%

Laos/ Thailand

EdL

76

11

Xeset 2 (H)

Saravane

In Operation

2009

• EdL (Laos) 100%

Laos

EdL

12

Nam Theun 2

Khammuane

1088

In Operation

2009

IPP(e)

Laos/ Thailand

Off take 75 MW (Domestic)

LHSE (Laos) 25%, EDF (France) 35%, EGCO (Thailand) 25%, ITD (Thailand) 15%

13

Nam Lik 1/2

2010

IPP(e)

100

Prov.

• Prov. (Laos) 100%

Laos

Micro-hydro

1.405

In Operation

Prov.

• Prov. (Laos) 100%

Laos

Solar

0.214

In Operation

Prov.

• Prov. (Laos) 100%

Laos

Diesel

0.74

In Operation

Total

1937.2

EdL

384.7

IPP(e)

1550.1

Prov.

2.36

Feasibility Study

Independent Power Producer

(H): Hydropower plant EdL: Electricité du Laos (EdL) IPP: IPP(e): Exporting IPP IPP(d): Domestic IPP

FS: HOA: Head of Agreement MOU: Memorandum of Understanding PDA: Project Development Agreement PPA: Power Purchase Agreement TBD: To Be Determined SIOD: Start Initial Operation Date

128

2. Demand Forecast

Descriptions

2010

2011

2012

2013

2014

2015

Sub-Total

- -

- -

- -

- -

2.3 11.8

13

Northern Area Phongsaly

1

2

Copper Mining 1 at Yot Ou District Copper Mining 2 at Yot Ou District

3

Total Load during Construction of Hydro Power Plants

Sub-Total

- -

- - - -

- - - -

2 12

Bokeo

Dokngiewkham

1

12

Sub-Total

- -

0.2 0.9

53

Luangnamtha

1

10.9 61.8 10.0 56.9

Copper Mining at Houay Mo, Long District Economic Spacial Zone (Boten)

2

3

- - 0.2 1.2 0.2 1.2 15.8 87.6 10.1 57.4 5.0 26.3 0.8 3.9

2.3 11.8 0.2 1.2 0.2 1.2 65.9 350.6 10.2 57.8 8.0 42.0 47.7 250.7

35

0.2 0.9

0.9 4.9

Total Load during Construction of Hydro Power Plants

4

5

Railway station Train running

Sub-Total

52.0 273.3

- -

30

Oudomxai

1

62.0 330.2 10.0 56.9

62.1 330.7 10.1 57.4

67.3 357.9 10.2 57.8

Cement Factory at Thong Na Village, Namo District Copper Mining at Kiew Chep Village-, Namo District

2

11

3

4

5

Iron melting factory, at Phu Phan Village, La District Lead- Zinc Factory at Nam Pheng Village, Namo District Total Load during Construction of Hydro Power Plants

6

- - 52.0 273.3

- - 52.0 273.3

- - 52.0 273.3

5.1 26.8 52.0 273.3

7

Total Load during Construction of Railway Railway station

Sub-Total

- -

18.0 94.6

18.0 94.6

- -

6.0 31.5

52

Xiengkhuang

1

2

3

41

Iron melting factory, at Nator Village, Khoun District Iron melting factory, at Yot Pieng Village, Pek District Total Load during Construction of Hydro Power Plants

Sub-Total

- -

Huaphanh

1

Total Load during Construction of Hydro Power Plants

Sub-Total

- -

38

Luangprabang

1

18.0 94.6 - - - - 46.6 247.6 7.0 39.4

2

Cement factory at Many Village, Nambak District Gold Mining at Phapon Village, Pak Ou District

3

32

Total Load during Construction of Hydro Power Plants

4

- - 39.6 208.1

18.0 94.6 - - - - 47.7 253.6 7.1 39.7 1.0 5.7 - - 39.6 208.1

- - 1.2 6.3 1.2 6.3 47.7 253.9 7.1 40.1 1.0 5.7 - - 39.6 208.1

6.0 31.5 1.2 6.3 1.2 6.3 90.7 479.7 7.2 40.4 1.0 5.7 42.9 225.4 39.6 208.1

5

Total Load during Construction of Railway Railway station

Sub-Total

- -

0.5 2.8

10

- -

- -

0.5 2.8

Sayaboury

1

2

Copper Mining at Pang Kham Village, Paklay District Total Load during Construction of Hydro Power Plants

Total (Northern)

Units (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)

- -

- - 116.8 616.4

- - 138.6 740.2

0.5 2.8 127.5 682.4

0.5 2.8 234.0 1,241.8

390.4 2,127.0

129

Descriptions

Units

2010

2011

2012

2013

2014

2015

2

Central Area

Sub-Total

Vientiane Province

Phubia Gold/copper Mining 1

32.0 210.2 32.0 210.2

59.3 355.0 33.0 216.8

2

Phubia Gold/copper Mining( Hoayxai )

146.6 926.0 43.0 282.5 20.0 131.4

3

Iron melting factory, at Vangvieng District

179.4 1,128.9 43.3 284.8 20.2 132.5 12.0 84.0

4

Iron melting factory, at Namchan Village, Saysomboon District

6

220.8 1,358.0 43.7 287.0 20.3 133.5 12.1 84.7 25.0 142.3 27.3 203.1 50.0 284.7

387.9 2,164.5 44.0 289.3 20.5 134.6 12.2 85.3 25.2 143.4 27.3 203.1 200.0 1,000.0

27.3 203.1 30.0 170.8

27.3 203.1 50.0 284.7

7

8

5 Cement Factory at Vangvieng (Extension) Iron melting factory, at Vangvieng District (sinhouang) Gold/Copper Mining at Maipakphoun Village, Sanakham District Total Load during Construction of Hydro Power Plants

17.0 89.2 25.4 133.5

0.9 4.7 25.4 133.5

0.9 4.7 25.4 133.5

1.2 6.5 25.4 133.5

Total Load during Construction of Railway 9 Railway station

10

(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)

48.8 256.2 - - 10.0 52.6

Sub-Total

- -

10.9 71.2

Vientiane Capital

1

2

3

95.4 354.2 5.1 35.8 80.0 250.0 8.3 57.8

4

8.0 56.0

47.0 203.6 5.0 35.0 31.0 96.9 8.1 56.4

96.1 357.4 5.0 35.3 80.0 250.0 8.1 56.9

96.2 358.2 5.1 35.6 80.0 250.0 8.2 57.4

5

Gold Mining at Khok Pheung Village, Sangthong District Iron melting factory, at Ban Hai Village (Tha Ngon), Xaythany District Kea Potash Factory at Thongmang Village, Saythany District Kea Potash Factory at Nathom Village, Saythany District Total Load during Construction of Hydro Power Plants

- - 2.9 15.2

- - 2.9 15.2

- - 2.9 15.2

- - 2.9 15.2

6 Total Load during Construction of Railway Railway station 7

(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)

- - - - 2.0 10.5

Sub-Total

- -

Bolikhamxai

1

Total Load during Construction of Hydro Power Plants

Total (Central)

(MW) (GWh) (MW) (GWh) (MW) (GWh)

32.0 210.2

0.2 1.3 0.2 1.3 70.4 427.5

9.2 48.6 9.2 48.6 202.8 1,178.1

9.0 47.3 9.0 47.3 284.5 1,533.7

7.5 39.4 7.5 39.4 324.4 1,755.6

14.3 74.9 14.3 74.9 497.6 2,593.6

Descriptions

2010

2011

2012

2013

2014

Sub-Total

17.0 52.0

17.0 52.0

17.0 52.0

17.0 52.0

2015 70 304

Southern Area Khammouane

1

37.0 127.0 20.0 75.0

Potassium at Yang Koung Village (Ngom Ma Lat) Thakhek District

2

Jiaxi Mining at Thakhek District

20.0 75.0 22.0 124.0

3

4

17.0 52.0

17.0 52.0

17.0 52.0

17.0 52.0

17.0 52.0

17.0 52.0

5

Metal Melting Factory at Nong Cheun-Borneng Village, Hinboon District Cement Factory at Nakham Village, Thakhek District (Existing) Cement Factory at Nakham Village, Thakhek District (Extension)

Economic Spacial Zone

6

7

- -

- -

- -

- -

5.0 21.9 6.0 31.5

Units (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)

Total Load during Construction of Hydro Power Plants

Sub-Total

93 605

Savannakhet

43.0 317.6 43.0 317.6

44.0 323.8 43.5 321.2

1 Xepon Gold/Copper Mining at Vilabury District Economic Spacial Zone (Nongdeun) 2

43.5 321.2 50.0 284.7

3

Total Load during Construction of Hydro Power Plants

- - - -

Saravan Champasak

Sub-Total

- -

0.5 2.5 12.6 - 71.7 - 12.6 71.7 - - - -

93.5 605.9 43.5 321.2 50.0 284.7 - - 13.4 63.5 75.6 428.0 12.6 30.0 71.7 223.4 0.8 8.0 3.9 30.7 22.8 20.0 119.8 145.0

54.0 380.7 43.5 321.2 10.0 56.9 0.5 2.5 12.6 35.5 71.7 175.7 12.6 7.5 71.7 - 8.0 - 30.7 - 20.0 - 145.0

73.5 492.1 43.5 321.2 30.0 170.8 - - 12.6 47.7 71.7 312.4 12.6 15.0 71.7 111.7 - 8.0 - 30.7 9.6 20.0 50.5 145.0

Sekong

2 5

28. 142 154 991 12.6 100.0 71.7 744.6 15.8 8.0 82.8 30.7 58. 20.0 305 145.0 5.0 21.9 58.2 9.5 305.9 49.7

9.6 4.7 50.5 25.0

22.8 5.5 119.8 28.9

- - - -

- - - -

(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (MW) (GWh) (GWh) (MW) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (GWh) (MW) (MW) (GWh) (GWh)

Sub-Total Sub-Total Cement Factory at Ta Leo Village, Saravane District 1 Aluminium at Paksong District(SLACO)for the 1 entire mine Total Load during Construction of Hydro Power 2 Aluminium at Paksong District(SINOMA) for the Plants 2 entire mine Aluminium at Paksong District(SINOMA) for 3 Alumina refinery Aluminium at Daklan Village, Dakjung District 1 Economic Spacial Zone (Bolaven plateau) 4 Total Load during Construction of Hydro Power Total Load during Construction of Hydro Power Plants Plants

130

Sub-Total

- -

3.8 19.7

3.8 19.7

- -

- -

Attapeu

1

2

3

- - - -

Gold/Copper Mining at Vangtun Village, Xanxai District Aluminium at Paksong District(SLACO) for Alumina refinery Total Load during Construction of Hydro Power Plants

Total (Southern)

Whole Country

3.8 19.7 77.3 467.2 264.6 1,511.2

3.8 19.7 122.8 699.8 464.2 2,618.2

60.0 369.6 92.0 579.8

- - 160.4 978.6 572.5 3,194.7

230.1 1,356.4 788.5 4,353.8

392 2,362 1,280.5 7,083.2

(MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh) (MW) (GWh)

131

LIST OF AUTHOR’S PUBLICATIONS

1.

Khammany INTHIRATH, Power sector status of Lao PDR and Lao–Vietnam

cooperation on power project development, Lao-Vietnam international Economic

2.

Seminar In Vietiane Capital 26/10/2012, Book III, Pages 104.

Khammany INTHIRATH, Promotion of Foreign Direct Investments for the

development of Energy sector in Lao PDR, Lao Magazine ALOUNMAI, Date

3.

October 2011, Page 53.

Khammany Inthirath, Investments in Hydropower Development in Lao PDR,

Scientific Seminar Lao PDR – SR of Vietnam, Vientiane Capital, Lao PDR, 2011,