intTypePromotion=1
ADSENSE

The Capacity Development Results Framework - A strategic and results-oriented approach to learning for capacity development

Chia sẻ: Fsf Fsf | Ngày: | Loại File: PDF | Số trang:100

49
lượt xem
4
download
 
  Download Vui lòng tải xuống để xem tài liệu đầy đủ

Alump sum price may be called for, or a series of lump sums. This is best suited to easily defined, relatively simple constructions, involving little below-ground work. However, some quite large above-ground constructions are paid for by lump sum. Sometimes a separate section of the bill for pricing allows for the foundation work of a building to be paid for ‘on measure’. In some kinds of civil engineering work the lump sum payment method can pose serious risks upon a contractor, causing him to add a substantial sum to his tender. This is particu- larly so for design-and-build or ‘turn-key’ projects where the contractor has to undertake detailed...

Chủ đề:
Lưu

Nội dung Text: The Capacity Development Results Framework - A strategic and results-oriented approach to learning for capacity development

ADSENSE

CÓ THỂ BẠN MUỐN DOWNLOAD

 

Đồng bộ tài khoản
2=>2