intTypePromotion=1
zunia.vn Tuyển sinh 2024 dành cho Gen-Z zunia.vn zunia.vn
ADSENSE

The power system towards the circular economy: Case of Lao’s PDR

Chia sẻ: Alucard Hellsing | Ngày: | Loại File: PDF | Số trang:8

15
lượt xem
1
download
 
  Download Vui lòng tải xuống để xem tài liệu đầy đủ

The project for development of a power source in the Lao PDR has started since 1970, until now Laos has 63 existing projects, and among projects under construction, 25 projects are expected to complete construction before 2020, 68 projects are expected to complete construction before 2025, 73 projects are expected to complete construction before 2030 and 282 projects are going on feasibility study report. This study will assist Lao PDR in analysing the information by analyzing, finding the solutions to ensure electricity supply is sufficient during dry seasons in the future.

Chủ đề:
Lưu

Nội dung Text: The power system towards the circular economy: Case of Lao’s PDR

ADSENSE

CÓ THỂ BẠN MUỐN DOWNLOAD


ERROR:connection to 10.20.1.100:9315 failed (errno=111, msg=Connection refused)
ERROR:connection to 10.20.1.100:9315 failed (errno=111, msg=Connection refused)

 

Đồng bộ tài khoản
2=>2