intTypePromotion=1
zunia.vn Tuyển sinh 2024 dành cho Gen-Z zunia.vn zunia.vn
ADSENSE

Mẫu CV Tiếng Anh ngành kiến trúc - Xây dựng

Chia sẻ: Minh Minh | Ngày: | Loại File: DOC | Số trang:18

1.564
lượt xem
283
download
 
  Download Vui lòng tải xuống để xem tài liệu đầy đủ

Cùng tham khảo một số mẫu CV Tiếng Anh ngành kiến trúc, xây dựng hay trong tài liệu này để hoàn chỉnh bản CV cá nhân của mình nhé. Chúc các bạn thành công.

Chủ đề:
Lưu

Nội dung Text: Mẫu CV Tiếng Anh ngành kiến trúc - Xây dựng

MẪU 1<br /> CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF<br /> <br /> 1. Proposed Position : Bridge Engineer 2. Name of Firm : Transport Engineering Consulting Joint-stock Co. No.5 (TECCO5) 3. Name of Staff : Tran Anh Tuan 4. Date of Birth: April 07, 1977 Nationality: Vietnam 5. Education : Da Nang Polytechnic University -Vietnam (1995 - 2001) Master of Engineering - Hanoi Construction University -Vietnam (2004 - 2007). 6. Membership of Professional Associations: Member of the Bridge & Road Association of Danang CityVietnam 7. Other Training : - Bridge Structure Computation by MIDAS Software organized by TECCO5 (in 2007) - Project Manager Training Course organized by Transport Engineering Design Incorporated (TEDI) - Ministry of Transport (MOT) in Danang City, Vietnam (in 2006).<br /> <br /> 8. Countries of Work Experience: Vietnam'<br /> <br /> 9. Languages : - Vietnamese: Speaking Good - English: Speaking Good<br /> <br /> Reading Good Reading Good<br /> <br /> Writing Good Writing Good<br /> <br /> 10.Employment Record : From : 2006 To : 2008 ...................................................<br /> <br /> Employer: TECCO5 Positions held: Bridge Engineer From : 2002 To : 2006 Employer: TECCO5 Positions held: Bridge Engineer From : 2001 To : 2002 Employer: TECCO5 Positions held: Construction Supervisor of Construction Supervision & Inspection Center of TECCO5 . From : 2000 To : 2001 Employer: TECCO5 Positions held: Bridge Engineer<br /> <br /> 11.<br /> <br /> 12.Work Undertaken that Best Illustrates Capability to Handl 1. Name of assignment or project: Priority Infrastructure Investment Project (PIIP) in Danang City, Vietnam Year: 2007 Location: Danang City, Vietnam Client: The PMU of the PIIP Main project features: The project includes roadsbridges-drainages-environment-LIA improvements in Danang center and its some districts, budget: USD 150 million. Positions held: Bridge Design Engineer Activities performed: - Designing the bridges - Computing the structures - Preparing/checking the drawings, etc. 2. Name of assignment or project: Natural Disaster Mitigation Project in Quang Ngai Province, Vietnam Year: 2007 Location: Quang Ngai Province, Vietnam Client: Quang Ngai Provincial People’s Committee Main project features: Wharves of Sa Ky & Co Luy Ports serving the fishermen and the army Positions held: In charge of structure items. Activities performed:<br /> <br /> - Designing 03 wharves - Computing the structures. - Preparing/checking the drawings, etc. 3. Name of assignment or project: Huong An Bridge Project-National Highway1A in Quang Nam Province, Vietnam Year: 2007 Location: Quang Nam Province, Vietnam Client: MOT Main project features: Length = 250m, Width = 19m, 4 driving lanes, budget: USD 1.5 million Positions held: in charge of bridges. Activities performed: - Designing the bridges . - Computing the structures. - Preparing/checking the drawings, etc. 4. Name of assignment or project: Tra My-Tra Bong Road in Quang Ngai Province, Vietnam Year: 2006 Location: Quang Ngai Province, Vietnam Client: Quang Ngai Provincial People’s Committee Main project features: Detailed Design Length = 36Km, Width = 7.5m, 2 driving lanes Positions held: in charge of bridge item. Activities performed: - Designing all bridges on the route<br /> <br /> - Computing engineering hydrology. - Computing the structures. - Preparing/checking the drawings, etc. 5. Name of assignment or project: The Road from Tri Binh District to Dung Quat Port in Quang Ngai Province, Vietnam Year: 2006 Location: Quang Ngai Province, Vietnam Client: The PMU of Dung Quat Economic Zone Main project features: Feasible Project Length = 16Km, Width = 48m, 10 driving lanes Positions held: in charge of bridge item Activities performed: - Designing bridges. - Computing the structures. - Preparing/checking the drawings, etc. 6. Name of assignment or project: Dung Quat – Sa Huynh Coastal Road in Quang Ngai, Vietnam Year: 2005 Location: Quang Ngai Province, Vietnam Client: Quang Ngai Provincial People’s Committee Main project features: Feasible Project Length = 111Km, Width = 12m, 2 driving lanes, budget: USD 15 million . Positions held: in charge of bridge item Activities performed: - Designing 5 large bridges (Thanh Long, Khanh<br /> <br />
ADSENSE

CÓ THỂ BẠN MUỐN DOWNLOAD

 

Đồng bộ tài khoản
6=>0