XÂY DỰNG CẦU BTCT BẰNG CÔNG NGHỆ ĐÚC HẪNG

1

ĐÚC HẪNG CÂN BẰNG

2

3

4

5

6

7

8

9

10

11

12

13

The Formtraveller - Components

PULL DOWN CYLINDERS

LAUNCHING CYLINDERS

MAIN CYLINDERS

HYDRAULIC CYLINDERS

MAIN RAILS 14

The Formtraveller - Components

FRONT & REAR BOOGIES

HYDRAULIC CYLINDERS

MAIN RAILS 15

The Formtraveller - Components

MAIN FRAMEWORK

FRONT & REAR BOOGIES

HYDRAULIC CYLINDERS

MAIN RAILS 16

The Formtraveller - Components

INTERNAL FRAMEWORK

BOTTOM FRAMEWORK

CROSS ARMS

FRONT & REAR FRAMEWORK

MAIN FRAMEWORK

FRONT & REAR BOOGIES

HYDRAULIC CYLINDERS

MAIN RAILS 17

The Formtraveller - Components

INTERNAL FRAMEWORK

BOTTOM FRAMEWORK

CROSS ARMS

FRONT & REAR FRAMEWORK

MAIN FRAMEWORK

FRONT & REAR BOOGIES INTERNAL FORMWORK

HYDRAULIC CYLINDERS EXTERNAL FORMWORK

MAIN RAILS BOTTOM FORMWORK 18

The Formtraveller - Components

INTERNAL FRAMEWORK

BOTTOM FRAMEWORK

CROSS ARMS

FRONT & REAR FRAMEWORK

MAIN FRAMEWORK

FRONT & REAR BOOGIES INTERNAL FORMWORK

HYDRAULIC CYLINDERS EXTERNAL FORMWORK

WORKING PLATFORMS END FORMWORK MAIN RAILS BOTTOM FORMWORK 19

20

The Formtraveller: Alqueva II,Portugal

21

The Formtraveller: Arrade, Portugal

22

The Formtraveller: Alqueva, Portugal

23

The Formtraveller: Dyrøy bridge, Norway

24

The Formtraveller: Algés, Portugal

25

The Formtraveller: Loures, Portugal

26

The Formtraveller: Arrade, Portugal

27

The Formtraveller: Rio Minho, Portugal

28

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases:

Phase 1:

Assembly at pierhead as small as 3 m

3 m

29

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 2:

Concreting of 1st segment on each side of the pier finished

30

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 3:

Splitting of travellers

31

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 3:

Splitting of travellers

32

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our patented Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 4:

12,2 m concreted (standard formtraveller); ready for normal procedure

33

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 4:

12,2 m concreted (standard formtraveller); ready for normal procedure

34

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 4:

12,2 m concreted (standard formtraveller); ready for normal procedure

35

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 4:

12,2 m concreted (standard formtraveller); ready for normal procedure

36

The Formtraveller - Cross-Support for installation on small Pierheads

When the pier head is too small to allow normal assembly of the formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.

Phase 4:

12,2 m concreted (standard formtraveller); ready for normal procedure

37

The Formtraveller - Cross-Support for installation on small Pierheads

38