[Professional License-Project of the central navigation low-cost]
2017-2018
University of Baria Vung Tau, 80 Truong Cong Dinh, Campus 3, Vietnam
MAREST Sylvain
1
BỘ GIÁO DỤC VÀ ĐÀO TẠO
TRƯỜNG ĐẠI HỌC BÀ RỊA-VŨNG TÀU
--------
ĐỀ TÀI NGHIÊN CỨU KHOA HỌC HỢP TÁC
Co-operative research project between BVU and UBO
TÊN ĐỀ TÀI:
Thiết kế và xây dng h thng đnh v dn đưng tàu c chi ph thp
(Design and Development of a central navigation “Low cost”)
Trình độ đào tạo: Chương trình trao đổi sinh viên với trường
UBO -Université de Bretagne Occidentale (Pháp)
Giảng viên hướng dn: Ts. LÊ NGỌC TRÂN
Sinh viên thc hin : Sylvain Marest
Lớp : Digital System
Niên khóa : 2016-2018
Bà Rịa-Vũng Tàu, năm 2018
[Professional License-Project of the central navigation low-cost]
2017-2018
University of Baria Vung Tau, 80 Truong Cong Dinh, Campus 3, Vietnam
MAREST Sylvain
2
Thanks
I would like to begin by thanking the University of Baria Vung Tau (BVU) for
having welcomed me to their school and their campuses for this period of training, and
for giving me the keys to live in Vietnam.
I thank Mr Le Ngoc and Mr Le Viet, professors in electronics at the university,
for their availability and for the quality of the exchanges we had during this internship,
allowing me to enrich myself and to evolve professionally.
Introduction
The training of the professional license Marine Electronic Systems (SEME)
includes a training period of 490 hours.
In the training course of the SEME professional license, the internship is
necessary to discover several technological facets of marine electronics. It allows you
to acquire skills and know-how specific to each company.
I chose the internship in Vietnam at the University of BVU with the purpose of
the realization of a central navigation "low-cost" because it was mainly found an
internship in France and the opportunity presented through Mr Vo, that represented for
me a chance to discover a unique know-how and culture in the world.
[Professional License-Project of the central navigation low-cost]
2017-2018
University of Baria Vung Tau, 80 Truong Cong Dinh, Campus 3, Vietnam
MAREST Sylvain
3
23-25
10-13
15-16
16-17
17-20
Summary
I. Presentation of the project 3-4
The interest of this project 3
The project team 3
Our solution 4
My schedules and my tasks 4
II. Electronic part 5-6
The raspberry pi 3 5
The GPS mouse 5
The module NEO-6M 6
7 inch screen pi 6
III. Computer part 7-9
Opencpn 7
GE2KAP 7
Google Earth 8
Openseamap 8
PuTTY 9
VncViewer 9
IV. The realization 10-20
Creating the map
Remote control of the raspberry pi 14
Installing the GPS mouse
Installing the module NEO-6M
Three possible technical solutions with price estimation
V. Conclusion 21
VI. Bibliography 22
VII. Appendices
[Professional License-Project of the central navigation low-cost]
2017-2018
University of Baria Vung Tau, 80 Truong Cong Dinh, Campus 3, Vietnam
MAREST Sylvain
4
UBO
UBO
BVU
BVU
I. Presentation of the project
The interest of this project
The interest of the project is to come and give navigational tools to Vietnamese
navigators. Indeed, on 300 000 Vietnamese boats, none have systems to navigate from
point A to point B, they can not follow any road where even to locate to access an area
they already knew, which could be very convenient for fishermen who want to find their
fishing zone.
They also have no weather systems and the price for a navigation system is very
elevated compared to the average budgets of the Vietnamese.
The project team
Supervisor and Manager : Than Le VIET
Supervisor and Manager : Tran LE NGOC
Student : Sylvain MAREST
[Professional License-Project of the central navigation low-cost]
2017-2018
University of Baria Vung Tau, 80 Truong Cong Dinh, Campus 3, Vietnam
MAREST Sylvain
5
Our solution
To avoid this problem, we will create a central navigation low-cost by connecting
to a Raspberry PI card, an LCD display, a radio module and a GPS mouse for displaying
and information of satellite data, and then for installing a system operating system and
navigation software to allow Vietnamese navigators to navigate serenely on the waters.
As there are no nautical charts for Vietnamese waters, free and downloadable on
the Internet, we will have to create a map of the east coast of Vietnam with the software
" Opencpn ", " GE2KAP " and " Google Earth " which will allow to use image overlay
skills to capture, calibrate and use it by the navigation software.
My schedules and my tasks
Weeks
Monday
Tuesday
Wednesday
Thursday
Friday
Week 1-2
9h-16h30
9h-16h30
9h-16h30
9h-16h30
9h-16h30
Week 3-4
9h-16h30
9h-16h30
9h-16h30
9h-16h30
9h-16h30
Week 5-6
9h-16h30
9h-16h30
9h-16h30
9h-16h30
9h-16h30
Week 7-9
9h-16h30
9h-16h30
9h-16h30
9h-16h30
9h-16h30
Week 10-11
9h-16h30
9h-16h30
9h-16h30
9h-16h30
9h-16h30
Week 1-2) Installation of the radio module to receive satellite data
Week 3-4) Installing a GPS mouse for the transmission of GPS data
Week 5-6) Set up the navigation software « Opencpn »
Week 7-9) Create a map of the east coast of Vietnam in. kap format with the software GE2KAP and Google Earth
Week 10-11) Tests in real condition on a boat