![](images/graphics/blank.gif)
Evaluate the feasibility of implementing activitysim activity-based model for Vietnamese municipalities in term of the available input data sources
6
lượt xem 2
download
lượt xem 2
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
This paper concisely overviews recent advancements and challenges associated with applying activity-based models in travel demand forecasting. Additionally, the article explores the operational process of the ActivitySIM model, a specific ABM tool for traffic demand forecasting, by detailing the required input data and parameters.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD