![](images/graphics/blank.gif)
Batch sizing and lot splitting strategies to reduce cycle time in semiconductor assembly process
5
lượt xem 2
download
lượt xem 2
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
This paper presents batch sizing and lot splitting strategies to improve production cycle times. In the event of too short cycle time, overlapping technique is the most applicable, while “parallel” technique applies to normal cycle time. The commonly known “batch & queue” technique works well for long cycle time such as new product qualification lot.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD
ERROR:connection to 10.20.1.98:9315 failed (errno=111, msg=Connection refused)
ERROR:connection to 10.20.1.98:9315 failed (errno=111, msg=Connection refused)