![](images/graphics/blank.gif)
Time impact on non-activated and kaolin-activated blood samples in thromboelastography
8
lượt xem 1
download
lượt xem 1
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
The correct methodology of thrombelastography might be influenced by elapsing time. In our study we investigated kaolin activated citrated samples together with non-activated citrated samples in relation to the elapsed times of 0, 15 and 30 minutes to compare both methods and to find out if there is an impact of time on results of thrombelastography.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD