Construction schedule
-
The research purpose of the dissertation is to develop a new method of establishing the optimum construction scheduling strategy for infrastructure systems of new urban areas from the perspective of the investors.
27p gaocaolon12 18-06-2021 14 4 Download
-
This paper proposes a two-phase heuristic algorithm to solve the crew scheduling problem of the Megabus Bus Rapid Transit System.
12p tohitohi 22-05-2020 16 1 Download
-
This study focus on the behaviour and quantify initial physical properties of RCC, from the beginning of hydration to designated characteristic of RCC, in order to define the thermal evolution, thermal stresses. By doing this, the appropriate speed of construction can be established when building RCC dam project.
27p change01 05-05-2016 74 7 Download