intTypePromotion=1
zunia.vn Tuyển sinh 2024 dành cho Gen-Z zunia.vn zunia.vn
ADSENSE

Indoor swimming pool

Xem 1-1 trên 1 kết quả Indoor swimming pool
  • The aim of this research is to investigate the energy performance and water usage of aquatic centres. The objectives are to: 1. develop a guideline for the definition of aquatic centres in Victoria for the purpose of energy and water benchmarking; 2. benchmark the energy and water consumption of aquatic centres by analysing the data collected from existing facilities in Victoria; 3. To investigate operational and building design features that will improve the energy and water performance of a sample aquatic centre by using building performance simulation.

    pdf265p runthenight04 02-02-2023 10 2   Download

CHỦ ĐỀ BẠN MUỐN TÌM

ADSENSE

nocache searchPhinxDoc

 

Đồng bộ tài khoản
2=>2