Million gross tons
-
The broad aim of this research project is to optimize planned and emergency maintenance tasks and timings for tram tracks. Consistent with that broad aim, the following specific objectives are identified: Understand the factors affecting the degradation of tram tracks; develop a degradation prediction model for tracks as a function of the influencing factors; evaluate the time and type of maintenance required for deteriorated rail tracks.
101p runthenight04 02-02-2023 8 2 Download