Seamless handover
Xem 1-1 trên 1 kết quả Seamless handover
-
Activity handover within engineering construction projects is time consuming, takes longer than the actual activities, and therefore, can cause duration delays. This paper presents relay chain seamless handover (RCSH) technology, which is based on relay technology theory and actor-network theory.
12p vivalletta2711 11-01-2020 14 0 Download