Sewer pipes
-
The aim of this research was to investigate the formation of hydrogen sulphide for different sewage characteristics and flow rates. An experimental set-up was developed to simulate a section of a gravity sewer pipe, the set-up comprised of a pipe of 2 m long and 155 mm inside diameter, referred to in this thesis as a laboratory sewer pipe. The first stage of the experimental program involved developing a biological growth rich in sulphate-reducing bacteria inside the laboratory sewer pipe using synthetic sewage.
131p runthenight07 01-03-2023 7 3 Download