![](images/graphics/blank.gif)
An algorithm model for solving the single period inventory transportation problems in the construction industry
5
lượt xem 2
download
lượt xem 2
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
This paper, we expected that the demand at the construction sites are constant and stationary, and the construction consolidation centre (CCC) is implementing a VMI system. The concentration of this paper is to minimize the transportation and inventory holding costs of the customers for a two-stage supply chain system in the construction industry.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD