![](images/graphics/blank.gif)
Ebook Construction scheduling, cost optimization, and management: A new model based on neurocomputing and object technologies – Part 1
2
lượt xem 1
download
lượt xem 1
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
Part 1 of ebook "Construction scheduling, cost optimization, and management: A new model based on neurocomputing and object technologies" provides readers with contents including: introduction; overview of neural networks in civil engineering; neural dynamics model and its application to engineering design optimization; project planning and management and CPM;...
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD