![](images/graphics/blank.gif)
Impact of supply chain strategy and change order on contractors’ cash flow in Jordanian construction industry: A case study of basic educational school construction
3
lượt xem 1
download
lượt xem 1
download
![](https://tailieu.vn/static/b2013az/templates/version1/default/images/down16x21.png)
Stern weather states and changes in government regulations and laws categorized among the least important causes. To illustrate the implementation of the classification impact index model and to evaluate and quantify change orders impact on contractor’s cash flow, a case study is presented in this paper using data of real case study obtained from reputable construction company in Jordan involved in the construction of basic education school building. The project commenced from November 2012 till December 2013.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
![](images/graphics/blank.gif)
CÓ THỂ BẠN MUỐN DOWNLOAD