![](images/graphics/blank.gif)
Barriers of Last Planner System
-
This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire.
8p
hckg111
18-10-2023
5
3
Download