Gas injection scheme
-
The pilot test of GAGD was recorded with a good oil rate and low water-cut during flowing back after gas injection and shut-in for gas segregation, which suggests the positive effectiveness of GAGD to some degree. The expansion of the GAGD application to other wells and areas in the field would be encouraged in any similar situation.
11p viharry 14-12-2022 18 4 Download