![](images/graphics/blank.gif)
Handover duration
-
Handovers of post-anesthesia patients to the intensive care unit (ICU) are often unstructured and performed under time pressure. Hence, they bear a high risk of poor communication, loss of information and potential patient harm.
8p
vidietmarhopp
29-12-2021
11
0
Download
-
Activity handover within engineering construction projects is time consuming, takes longer than the actual activities, and therefore, can cause duration delays. This paper presents relay chain seamless handover (RCSH) technology, which is based on relay technology theory and actor-network theory.
12p
vivalletta2711
11-01-2020
14
0
Download
CHỦ ĐỀ BẠN MUỐN TÌM
![](images/graphics/blank.gif)