![](images/graphics/blank.gif)
Personnel scheduling
-
Ebook "Multidisciplinary scheduling: Theory and applications" is a volume of nineteen reviewed papers that were selected from the sixty-seven papers presented during the First Multidisciplinary International Conference of Scheduling (MISTA). This is the initial volume of MISTA—the primary forum on interdisciplinary research on scheduling research. Each paper in the volume has been rigorously reviewed and carefully copyedited to ensure its readability.
390p
loivantrinh
29-10-2023
8
3
Download
-
The study was conducted in six randomly selected districts of Saurashtra region. 120 extensional personnel were selected proportionately from each district. Structured interview schedule was used for the study.
5p
chauchaungayxua11
23-03-2021
17
2
Download
-
The study was conducted among certified organic farmers of Tamil Nadu. A sample size of 180 organic farmers was selected from the districts of Coimbatore, Erode and Tiruppur districts of Tamil Nadu. Data was collected through personnel interview method with help of semi structured interview schedule. Simple percentage analysis and simple ranking method are used for the study. Findings revealed that majority of the certified organic farmers faced constraints were inadequate availability of organic inputs in time (68.89 %), scarcity of irrigation water (64.
8p
chauchaungayxua6
26-06-2020
11
0
Download
-
A study was conducted to know the clientele served and type of extension functions emphasized by the extension personnel of public extension organizations in Hyderabad – Karnataka region of Karnataka during 2013-14. A sample of 38 extension personnel from Krishi Vigyan Kendras under University of Agricultural Sciences, Raichur and 38 extension personnel from Raita Samparka Kendras under Karnataka State Department of Agriculture were selected for the study. The data was collected from the respondents using structured interview schedule developed for the study.
8p
kequaidan4
05-05-2020
4
0
Download
-
The present study was conducted in the State Arunachal Pradesh during 2015-2016. Three districts viz., Papumpare, East Siang and West Siang were purposively selected based on the highest number of filled up post of agricultural officer. There are all total 64 officials in these three districts. So census method was followed for selecting the respondents. The ‘perceived training needs’ of respondent was the dependent variable of the study. The data were collected through interview schedule.
11p
trinhthamhodang4
22-03-2020
8
1
Download
-
The present study was conducted in Parbhani and Nanded district of Marathwada region in Maharashtra state. Out of eight district of Marathwada, Nanded &Parbhani district were selected randomly for the study. The all 25 taluka from Nanded & Parbhani district was selected randomly for the present study. Thus of 236 extension personnel from Parbhani & Nanded district were selected by One third (1/3) of proportionate random sampling method. The data were collected with the help of presented interview from respondents at their office. Ex-post facto research design was adopted in this study.
5p
nguaconbaynhay3
07-02-2020
13
0
Download
-
Chapter 12 - Employee management. This chapter will help you: Become familiar with the types of jobs in the beverage industry, write job descriptions and interview applicants, develop effective training programs, schedule personnel to meet daily needs, supervise employees to avoid legal pitfalls, meet federal and state compensation and record-keeping requirements,...
23p
trueorfalse8
07-09-2017
87
3
Download
-
Nurses are assigned to respond to the CD calls and investigations 24 hours a day, 7 days a week. After hours, calls are relayed to public health through our dispatch 911 service. (An updated contact schedule for public health personnel is provided each Friday to the Sheriff’s office 911dispatch office.) As we learned during the H1N1 pandemic of 2009/10, a large outbreak or public health emergency would require far greater resources than this department has available. Federal dollars were provided for the H1N1 response.
82p
nhamnhiqa
01-03-2013
38
1
Download
-
The quality organization will provide CQAM, DQAM, Staff Inspectors, and sampling and testing staff to meet the project schedule. The staffing levels indicated in Staffing Exhibit are based on a preliminary construction schedule and represent an approximate number of personnel needed per month. The staffing levels will be adjusted on a monthly and weekly basis, depending on the work being accomplished on each day, so that all work will be inspected and tested according to the QMP.
128p
tainhacmienphi
25-02-2013
65
6
Download
-
Funds in all foreign financial accounts and trusts must be reported on Schedule B, Part III of your Form 1040. Recently, the IRS has been checking this closely because now they are levying a large civil penalty fine for failure to report all foreign accounts. Most Foreign Service personnel quickly learn that they are not required to file their annual tax returns until June 15 if they are posted overseas. This is still true, but remember, this automatic extension does not include an automatic extension for payment. If you are likely to owe taxes, they...
37p
bi_ve_sau
05-02-2013
25
2
Download
-
When it comes to exercising, the problem with most people is that of taking time out from their busy schedules, lack of adequate gymnasium facilities and diversity of work assignments. This book was writen for Royal Canadian Air Force personnel, who needed to keep fit even from the confines of their barracks. The Five Basic Exercises (5BX) Plan presented in this booklet is designed to show you how to develop and hold a high level of physical fitness, regardless of who you are or where you may be located. The scheme is not dependent on elaborate facilites or equipment. The...
18p
crius75
07-01-2013
40
2
Download
-
Institutional changes unrelated to PPHE. The medical center encountered a number of unexpected changes in personnel, including changes in faculty members participating in the project. These changes required reassignment of some responsibilities. Scheduling. After adjusting to organizational and curricular changes, the team’s primary challenge was scheduling. To offset this challenge, the team presented lectures in multiple locations at different times and posted them on the residents’ secured web site.
84p
chiecxedien
02-01-2013
28
1
Download
-
Machinery Component Maintenance and Repair Maintenance work order planning and scheduling continues to be a largely manual set of procedures throughout the hydrocarbon processing industry. There are, however, several systems which support daily work planning and scheduling. One such system is a skills inventory file that provides daily information on available personnel for use in manual planning and scheduling of maintenance work.
20p
hiruscar
13-10-2010
85
9
Download
-
Along with the schedules, the data processing equipment prints out a deck of cards to feed back completion or rescheduling information. These cards are used by plant maintenance personnel to record actions taken, time expended, date completed, and any pertinent remarks concerning findings when the task was done
10p
lyacau
30-12-2009
90
15
Download
CHỦ ĐỀ BẠN MUỐN TÌM
![](images/graphics/blank.gif)