![](images/graphics/blank.gif)
Prior skeleton
-
The continual reassessment method (CRM) identifies the maximum tolerated dose (MTD) more efficiently and identifies the true MTD more frequently compared to standard methods such as the 3 + 3 method. An initial estimate of the dose-toxicity relationship (prior skeleton) is required, and there is limited guidance on how to select this.
10p
vichaeng2711
29-04-2021
24
1
Download
-
The continual reassessment method (CRM) requires an underlying model of the dose-toxicity relationship (“prior skeleton”) and there is limited guidance of what this should be when little is known about this association. In this manuscript the impact of applying the CRM with different prior skeleton approaches and the 3 + 3 method are compared in terms of ability to determine the true maximum tolerated dose (MTD) and number of patients allocated to sub-optimal and toxic doses.
12p
vimale2711
25-08-2020
11
2
Download
-
It is the responsibility of the Project Manager to schedule standing Project Board meetings at the beginning of the project. Confirm the logistics of the next meeting, namely date, time and conference room. Create the meeting agenda. It is recommended that you use the Word 6.0 Agenda Wizard (standard style) to create the agenda. This Wizard also creates the skeleton meeting minutes. Confirm the agenda with the Project Sponsor. Assemble any additional documentation that requires reading as preparation for the Project Board meeting.
31p
tainhacmienphi
25-02-2013
67
9
Download
-
All rights reserved. No part of this work may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage or retrieval system, without the prior written permission of the copyright owner and the publisher.
386p
meojunior
03-12-2010
117
29
Download
CHỦ ĐỀ BẠN MUỐN TÌM
![](images/graphics/blank.gif)