SISP Measurement
-
In this study, two models were proposed: a five-stage SISP maturity model for defining SISP maturity and another one for assessing the degree of SISP maturity. The five SISP maturity levels were defined as: Rudimentary Planning, Ineffectual Planning, Attainable Planning, Sustainable Planning, and Adaptable Planning. The assessment model was structured as a third-order system, where eight first-order dimensions were termed as Form and Content, Collaboration, Policies, Stakeholders' Designation, Knowledge Bank, Technology, Time Dimension, and Viability.
472p runthenight04 02-02-2023 12 3 Download