Water reuse
-
The main aims of the project were to firstly find out or identify barriers that are inhibiting builders from installing greywater systems and secondly to identify and formulate strategies to reduce or eliminate the barriers identified. The main barriers for builders are; high cost, government regulations, lack of builder awareness or knowledge, and low client demand.
225p runthenight04 02-02-2023 5 2 Download
-
The main aim of this research is to develop a viable solution to treat and reuse car wash wastewater. To do so, two treatment systems were evaluated. The first treatment system comprised of coagulation-flocculation and ceramic ultrafiltration membrane and reverse osmosis and the second treatment system is enhanced membrane bioreactor (eMBR).
201p runthenight04 02-02-2023 10 3 Download