Build the plan
-
This research thesis seeks to understand how governments, the legal system and the people responsible for construction can be encouraged to incorporate sustainable design in all building developments. Most important within this research is to question the lack of checks of ESD conducted from the planning permit through to the construction phase or on completion of a building.
160p runthenight07 01-03-2023 9 3 Download
-
The purpose of this research was to study the level of appreciation executive and senior managers have towards the contribution person-environment (P-E) fit attributes, in particular the person-organisation (P-O) fit and person-job (P-J) fit attributes, have in describing the competency of a project manager from the perspective of executives and senior managers who, within their respective organisations, are responsible for the workplace management team that directly manages short and long-term projects.
313p runthenight04 02-02-2023 5 2 Download
-
The Australian house building industry has seen an increase in the average house completion time in the past decade. This increase in some Australian states was quite dramatic. For instance, Western Australia faced a seventy percent increase in the average house completion time during this period. Since houses make up more than seventy-five percent of dwellings in Australia, this increase affected a large proportion of housing supply in the country.
244p runthenight04 02-02-2023 7 2 Download
-
The research objective of the thesis is to analyze the main socio-economic - environmental factors affecting the types of agricultural land use. These factors can be used for building an integrated model to optimize the agricultural land use area and land use allocation. That can help planners to improve the efficiency of land use planning.
29p cothumenhmong10 19-03-2021 34 5 Download
-
The thesis only focuses on issues related to linkage of tourism development in the North Central’s provinces such as (1) Link in tourism advertising and promoting; Link in developing tourism product; Link in training and developing of human resources; Link in building synchronous tourism infrastructure, especially transport infrastructure; Link in mobilizing investment capital and developing mechanisms and policies for general tourism development investment in the region, reviewing tourism development planning under the strengths of each locality; Link in collaborating to improve tourism co...
26p trinhthamhodang1217 14-01-2021 26 5 Download
-
It aims to report current research work and latest development in the specialized areas of architecture, landscape architecture, applied arts and design, urban and regional planning, quantity surveying, building technology and engineering, construction management and other scholarly works related to the built environment.
7p christabelhuynh 29-05-2020 19 2 Download
-
The thesis contributes to studying solutions to renovate the state management on HRD in MSGE, thereby, implementing the Vietnam Human Resources Development Strategy in the period of 2011-2020. It provides scientific arguments for management agencies to plan, build, reform and implement the policies, laws on human resource development in businesses generally and in economic military companies, MSGE particularly in order to improve the effectiveness and efficiency of the state management on HRD in businesses.
27p quenchua 28-09-2019 55 4 Download
-
The study object of the thesis is the implementation of CSR of SMIEs in Thai Nguyen province for employees. CSR has various contents such as environmental protection, CSR for consumers, CSR for the community, CSR for employees. In the scope of this dissertation, the author analyzes the implementation of CSR of SMIEs in Thai Nguyen province through the steps in the process such as by working out the plan, organizing the implementation, building contents of implementing and evaluating the implementation.
26p quenchua 28-09-2019 31 4 Download
-
The research objective of the dissertation establishes geomorphologic geological units to serve as a scientific foundation for sustainable land use planning and use in the North Central Highlands. Building up the system of units and criteria and establishing geomorphologic map of the North Central Highlands. Analyzing characteristics and classification of geomorphologic landscapes, proposing solutions to sustainable land management and use on the geomorphologic viewpoint of North Central Highlands.
30p xacxuoc4321 09-07-2019 68 3 Download
-
Study theoretical and practical backgrounds of teaching based on students’ learning styles in primary schools; build a teaching process based on students’ learning styles in primary schools; apply the constructed process in designing lesson plans for the subjects of Science, History and Geography in primary schools; conduct pedagogical experiments to check and confirm the feasibility of the proposed process.
26p change04 08-06-2016 38 2 Download
-
The e-customs procedures are popular applied around the world, especially developed countries which had the implementing process from the 80th century ago; There are many foreign works which are primarily researched on professional application of modern customs on customs procedures. With regard to domestic works which mainly focuses on pilot deployment of e-customs procedures on building organization model of information technology and wider as the customs modernization plans.
26p change05 14-06-2016 59 7 Download
-
The overall objective of the thesis is to study and building URP model apply for Vietnamese universities and testing this model at the Hue College of Economics - Hue University.
13p change06 14-06-2016 66 3 Download
-
Lecture "Designing business plan - Unit 1: Introduction to Business plan" presentation of content: What is Business plan, the Business plan, a plan must pass three tests, why take the time to build a Business plan, key elements of a Business plan.
18p tramnamcodon_01 28-03-2016 58 8 Download
-
The thesis does not focus on introducing IM tools and techniques applied them in specific situations, such as marketing techniques through search engine ) SEM (Search Engine Marketing), Marketing on social networks ) SMM (Social Media Marketing)...; only focus on studying process of IM activity in general, from analysing information, planning, building strategy, selecting tool and implementing the plan and testing the correction. Related to respondents: Survey of SMEs, satisfying the conditions.
0p nguyenthiminh32 12-07-2014 90 10 Download
-
Look at the following sketches of the buildings from different parts of the world. Compare the buildings from the following points of view :(Ss work in pairs)
7p vthanh11xd111 25-11-2013 85 7 Download
-
Make questions for given answers. Read the questions: Why are the upper floor steel columns erected before the roof decking has been put in place? or Why is the roof decking put in place after the upper floor steel columns have been erected ?
8p vthanh11xd111 25-11-2013 84 7 Download
-
When designing a building for a group of people, an architect considers the maximum, minimum and average dimensions of their bodies. For each design situation shown below say which dimension an architect should base his calculations on:
7p vthanh11xd111 25-11-2013 91 10 Download
-
It is estimated that approximately one-third of the world’s population are using groundwater for drinking purposes. Pollution of ground water due to industrial effluents is a major issue (Vasanthavigar et al., 2011). Poor groundwater quality brings negative impact to human health and plant growth. In developing countries like India, it is estimated that around 80% of all diseases are directly related to poor drinking water quality and unhygienic conditions (Olajire & Imeokparia, 2001; Vasanthavigar et al., 2011).
37p lulanphuong 28-03-2012 78 14 Download
-
The proposed activity is the most appropriate approach to the problems outlined under Section 1.5. Vietnamese and Australian scientists and industry stakeholders will work jointly, intensively and sequentially to: (i) describe the existing situations; (ii) identify and describe problems and constraints; (iii) develop recommendations and plans for mitigating the constraints and encouraging future research and development in the industry; and (iv) seek industry feedback by wide dissemination and discussion of the plans, proposals, and findings and recommendations....
13p tam_xuan 02-03-2012 62 6 Download