Pre-emptive Constrained Resources
-
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF).
18p kelseynguyen 27-05-2020 14 2 Download
-
We introduce a heuristic method for the single resource constrained project scheduling problem, based on the dynamic programming solution of the knapsack problem. This method schedules projects with one type of resources, in the non-preemptive case: once started an activity is not interrupted and runs to completion.
18p vinguyentuongdanh 19-12-2018 31 0 Download