Nghiên cứu nông nghiệp: Technical and economic feasibility of applying the Better Management Practices (BMP) to household aquaculture in Vietnam - MS2
54
lượt xem 5
download
lượt xem 5
download
Download
Vui lòng tải xuống để xem tài liệu đầy đủ
The area of semi-intensive pond should from 0.5-0.7 ha, with construction and input and output separation. Pond slope down to the store. 1.2 Pond cleaning Before PL (Post-larvae) released 25-30 days, drainage ponds and pond drying 7-10 days. Plowing the pond bottom after removing the mud. If the bottom is acidic, water discharge repeated 2-3 times.
Chủ đề:
Bình luận(0) Đăng nhập để gửi bình luận!
CÓ THỂ BẠN MUỐN DOWNLOAD